CLIN 0002 Proposal Schedule.xls

XLS spreadsheet 40 KB Posted

Attached to
Install Concrete Pad and Repair Perimeter Fence, Osan AB (Osan IDIQ)
Solicitation number
W90VN6-20-R-0048
Issued by

View the file

Other files

File Type Posted
CLIN 0002 Drawing.pdf PDF
CLIN 0003 Drawing.pdf PDF
CLIN 0003 SOW.DOCX DOCX document
CLIN 0002 SOW.DOCX DOCX document
CLIN 0001 Project Drawings.pdf PDF
W90VN6-20-R-0048.pdf PDF
CLIN 0001 Proposal Schedule.xls XLS spreadsheet
CLIN 0001 SOW.DOCX DOCX document
CLIN 0003 Proposal Schedule.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE

CLIN SCHEDULE
Project Title: MA IDIQ for General Repair of Buildings & Exterior Site, Osan Air Base
Description: The contractor shall provide all labor, tools, materials, equipments, transportation, supplies, and other necessary
resources to perform general repair of buildings & exterior site for Osan Air Base in accordance with
the statement of work, specifications, drawings, and terms and conditions contained herein.
Contract Period : 1st Option Year
ITEM NO.DESCRIPTIONQTYU/TUNIT PRICEUNIT PRICEAMOUNTAMOUNT
1001ADTemporary construction electro galvanized iron (EGI) fence with 2.4 meter height2,035LF₩₩- 0
1001AEPlastic safety barricades200LF₩₩- 0
1002AHDispose of and haul all construction debris to off-base designated area permitted by ROKFC Government in accordance with appropriate lawa and regulations433CY₩₩- 0
1002AKInstall seeding including fertilizing1,040SY₩₩- 0
1004AEExcavate ground360CM₩₩- 0
1004ANReady mixed concrete, Class A, F'c=3,000PSI (210kgf / sqcm)205CM₩₩- 0
1004FJFabricate, install & remove forms for concrete work11,548SF₩₩- 0
1006ABChain link fence w/top guard2,035LF₩₩- 0
1006AKCompact 95% density w/rammer163CY₩₩- 0
O/A ItemAAConcertina wire installation620LM₩₩- 0
O/A ItemABRemove existing chain link fence2,035LF₩₩- 0
** Amount of O/A items is 9% of overall
Estimated Total Amount (Base Year):₩ - 0- 0
$1 = 1,1128.2819 KW (FY20)$ - 0

&L&8* US Origin Material included ** Government Furnished Material&C&8Page &P of &N

File details come from the government source that posted it. Updated .