CLIN 0002 Proposal Schedule.xls
XLS spreadsheet 40 KB Posted
- Solicitation number
- W90VN6-20-R-0048
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLIN 0002 Drawing.pdf | ||
| CLIN 0003 Drawing.pdf | ||
| CLIN 0003 SOW.DOCX | DOCX document | |
| CLIN 0002 SOW.DOCX | DOCX document | |
| CLIN 0001 Project Drawings.pdf | ||
| W90VN6-20-R-0048.pdf | ||
| CLIN 0001 Proposal Schedule.xls | XLS spreadsheet | |
| CLIN 0001 SOW.DOCX | DOCX document | |
| CLIN 0003 Proposal Schedule.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE
| CLIN SCHEDULE | |||||||||
| Project Title: MA IDIQ for General Repair of Buildings & Exterior Site, Osan Air Base | |||||||||
| Description: The contractor shall provide all labor, tools, materials, equipments, transportation, supplies, and other necessary | |||||||||
| resources to perform general repair of buildings & exterior site for Osan Air Base in accordance with | |||||||||
| the statement of work, specifications, drawings, and terms and conditions contained herein. | |||||||||
| Contract Period : 1st Option Year | |||||||||
| ITEM NO. | DESCRIPTION | QTY | U/T | UNIT PRICE | UNIT PRICE | AMOUNT | AMOUNT | ||
| 1001 | AD | Temporary construction electro galvanized iron (EGI) fence with 2.4 meter height | 2,035 | LF | ₩ | ₩ | - 0 | ||
| 1001 | AE | Plastic safety barricades | 200 | LF | ₩ | ₩ | - 0 | ||
| 1002 | AH | Dispose of and haul all construction debris to off-base designated area permitted by ROKFC Government in accordance with appropriate lawa and regulations | 433 | CY | ₩ | ₩ | - 0 | ||
| 1002 | AK | Install seeding including fertilizing | 1,040 | SY | ₩ | ₩ | - 0 | ||
| 1004 | AE | Excavate ground | 360 | CM | ₩ | ₩ | - 0 | ||
| 1004 | AN | Ready mixed concrete, Class A, F'c=3,000PSI (210kgf / sqcm) | 205 | CM | ₩ | ₩ | - 0 | ||
| 1004 | FJ | Fabricate, install & remove forms for concrete work | 11,548 | SF | ₩ | ₩ | - 0 | ||
| 1006 | AB | Chain link fence w/top guard | 2,035 | LF | ₩ | ₩ | - 0 | ||
| 1006 | AK | Compact 95% density w/rammer | 163 | CY | ₩ | ₩ | - 0 | ||
| O/A Item | AA | Concertina wire installation | 620 | LM | ₩ | ₩ | - 0 | ||
| O/A Item | AB | Remove existing chain link fence | 2,035 | LF | ₩ | ₩ | - 0 | ||
| ** Amount of O/A items is 9% of overall | |||||||||
| Estimated Total Amount (Base Year): | ₩ - 0 | - 0 | |||||||
| $1 = 1,1128.2819 KW (FY20) | $ - 0 |
&L&8* US Origin Material included ** Government Furnished Material&C&8Page &P of &N
File details come from the government source that posted it. Updated .