About this file

This document is a project statement from the Michigan Department of Natural Resources (DNR) Parks and Recreation Division (PRD) requesting assistance with the sewer, water, and toilet/shower building replacement and upgrades at Clear Lake State Park in Montmorency County. The proposed scope of work includes evaluating and upgrading the campground sewer distribution and treatment system, water distribution system, and replacing two toilet/shower buildings. The consultant shall provide professional services including planning, design, permitting, contract document preparation, and construction oversight. The project schedule anticipates the consulting work occurring during the April 1st to October camping season, with biweekly progress updates required.

The document references a related state and local contract opportunity, 751/23010, for the Clear Lake State Park Water, Sewer & Toilet/Shower Upgrades project located in Montmorency County, Michigan. The document provides detailed requirements for the professional services to be included in proposals, such as evaluation of system upgrades, integration of facilities, permitting, and site improvements. Allowances for permitting and testing fees are included, and reference documents such as existing utility drawings will be made available to the successful bidder.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNR PARKS AND RECREATION DIVISION

Clear Lake State Park

Sewer, Water and Toilet/Shower Replacement and Upgrades Project Statement, September 2022

The DNR Parks and Recreation Division (PRD) is requesting assistance with the Clear Lake State Park Sewer, Water, and Toilet/Shower building(s) replacement and upgrades. It is anticipated all design work associated with this project will occur in a coordinated fashion at the same time.

PROJECT BACKGOUND:

Clear Lake State Park is located within the Mackinaw State Forest, 9 miles north of Atlanta along M-33 in northern Montmorency County. The area is well known for its plentiful wildlife including deer elk & turkey. Elk can be seen and heard throughout the area, especially in the spring and fall seasons.

The park features a 178-site campground, a tiny house, boat launch, swim area, and access to miles of hiking, biking, and ORV trails. A limited number of campsites are open year around for semi-modern (electric only) camping.

The sanitation station drain field was constructed in the late 60’s. The campground water and existing toilet/shower buildings were constructed in 1972. The campground sewer distribution systems were updated in 1993. The well house and the campground electrical were updated in 2014. The toilet/shower buildings lack accessible features and are showing their age, while the sewer and water systems have exceeded their intended design life and need to be addressed to provide updated facilities that meet current sanitation codes. Monitoring wells and ground water sampling is currently in progress with results expected in the third quarter of 2023.

PROPOSED SCOPE OF WORK:

Interested bidders shall provide a complete PSC Proposal for all required Professional Services to evaluate for removal, replacement and upgrade the campground sewer distribution and treatment system, water distribution system and toilet shower buildings.

Consulting services shall follow the State of Michigan, Department of Management and Budget Contract for Professional Services and DMB Facilities Administration, Design and Construction Division policies and procedures for the development of Contract Bid Documents and Construction Administration. Proposals shall include Phase 400 - 700 as required to produce selected improvement plans including advantages and disadvantages of options, option cost comparisons, and comparative life cycle considerations with a professional recommendation for DNR and DTMB consideration.

All design alternatives shall be based on and take into consideration State and Federal Barrier Free Standards, EGLE campground rules and permit requirements, State and Federal Environmental permits and requirements and State of Michigan License and Regulatory Affairs construction codes and permitting.

The successful consultant shall provide brief bi-weekly design progress updates for the project team. The successful consultant shall provide brief bi-weekly design progress updates for the project team.

Professional services for Clear Lake State Park shall include but are not limited to:

Sewer System

• Sewer system analysis and recommendations for upgrades including planning, design, permitting, contract document preparation, and construction oversight.

• Evaluation for upgrade or replacement of all existing campground sewer distribution lines.

• Integration of the campground sanitation station into the campground disposal system and abandon the sanitation station septic field.

• Evaluation for upgrade or replacement of existing sewer lift stations, manholes, tanks, and pumps. Including but not limited to providing inverters to support 3 phase lift station pumps.

• New connection to proposed toilet shower buildings.

• Evaluation for upgrade if determined necessary the existing campground wastewater disposal system including testing, evaluation, and quantification of existing campground absorption fields.

• All new distribution lines shall be directly bored to minimize environmental impact and campsite restoration.

Water System

• Water distribution analysis and recommendations for upgrades including planning, design, permitting and contract document preparation including construction oversight.

• Replacement of all replacement campground water distribution lines.

• Removal, relocation, and upgrade of campground jug fillers.

• Connection to existing well house and upgrade of well house controls as necessary to provide intended water distribution improvements.

• Evaluate for upgrade, the addition of a second well or redundant pump to provide uninterrupted water service to the park.

• All new distribution lines shall be directly bored to minimize environmental impact and campsite restoration.

Toilet/Shower Buildings

• Remove and replace two toilet/shower buildings.

• Soil borings topographic survey in support of the proposed toilet/shower buildings.

• Evaluation and integration of standard toilet plans to incorporate site specific details including recommendations for improvements.

• Site improvements shall include but not be limited to the following:

o Accessible walkways o Parking spaces

GENERAL REQUIREMENTS:

• Preparation and submission of all required permit applications and permit application fees including but not limited to EGLE, LARA, EGLE Campground Unit, SESC shall be included.

• A minimum of 3 face to face project team meetings with meetings likely to be Project kick off meeting and site analysis, Phase 400 50% and Phase 500 50%.

• All potential bidders are required to have a Unique Entity Identifier (UEI) registered in SIGMA.

• Include in your Phase 400 or 500 reimbursable line items for the following Allowance(s) o Permitting Allowance: $2500 o Testing Allowance: $2500

REFERENCE DOCUMENTS:

• Clear Lake State Park CG-Map

• E-100_Campgound Water (Sheets 1-3), 1972

• E105_Sanitary Site Improvements, 1993

• Lift Station Pump Technical Data

Standard Toilet Shower Plan and Specifications and all existing park utility drawings will be made available to the successful bidder including sewer distribution, water distribution and electric distribution.

PROJECT SCHEDULE:

The camping use season is from April 1st – October it is anticipated that the consulting data collection and planning may take place in a coordinated and conscientious manner during this time frame as needed.

A proposed project schedule shown in weeks shall be provided as part of the proposal submission. Biweekly PSC progress updates will be required for the project team.

DNR Parks and Recreation Regional Field Planner is Ronda Osga (989) 619-6426.