Clauses.pdf

PDF 57 KB Posted

Attached to
NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION
Solicitation number
W912QR26QA067
Issued by

About this file

This document contains standard federal acquisition regulations (FAR) clauses applicable to a construction contract.

Clause 52.211-10 establishes the timeline and performance requirements for the contractor. Work must commence within 14 calendar days of receiving the notice to proceed, be prosecuted diligently throughout execution, and be completed and ready for use within 180 days from the notice to proceed date. Final cleanup of the premises is included as part of the completion requirement. Clause 52.236-26 addresses preconstruction conference procedures; the Contracting Officer may elect to conduct such a conference, and the successful offeror will be required to attend with notification including specific date, time, location, and discussion items. Clause 52.236-27 pertains to site visits and conditions. Offerors and quoters are urged and expected to inspect the work site, as clauses addressing differing site conditions and site investigations will be included in any awarded contract. Site visits may be arranged during normal business hours by contacting Libby Watt at the USACE Louisville District, Nolin River Lake facility located at 2150 Nolin Dam Road, Mammoth Cave, Kentucky 42259, by phone at 270-286-6606.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clauses

52.211-10 Commencement, Prosecution, and Completion of Work.

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.236-26 Preconstruction Conference.

Preconstruction Conference (Feb 1995)

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

(End of clause)

52.236-27 Site Visit (Construction).

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Libby Watt USACE Louisville District Nolin River Lake 2150 Nolin Dam Road Mammoth Cave, KY 42259 Phone: 270-286-6606