This document is an appendix containing construction notes and specifications for plan sheets AB 01, EN 01, PB 01, and MB 01.
Construction and Building Materials: Flooring shall be Silkal flooring system on concrete slab with POC-approved color. All exterior CMU walls must be pigment split face CMU in sandstone color with matching mortar. Interior CMU walls require primer and Porter Dura-Glaze semi-gloss epoxy paint in white, with beige doors designated for men's and women's restrooms. Exterior CMU walls require core fill 500 foam insulation in all non-grouted cells, installed in two lifts following masonry work. White metal ceiling panels (AG Panel Style) 36" wide attach to trusses with matching color screws and metal J-channel trim, with 6" insulation batts laid on top. Pre-engineered wood trusses feature 6/12 pitch on 16" O.C. maximum spacing with hurricane clips, 7/16" OSB sheeting attached with 1½" screws, and Hunter Green metal roof panels with 5/16" foil bubble insulation. A 5-foot-wide concrete sidewalk with 4000-lb mix and reinforced steel rebar surrounds the building with downspout drainage, broom finishing, and 1/2" slope away from the structure.
Fixtures, Systems, and Mechanical Equipment: Plumbing fixtures include American Standard wall mount and wheelchair lavatories with Delta faucets, Afwall elongated bowls, and wash brook urinals, along with Comtec HDPE toilet compartments and urinal partitions, Bobrick waste receptacles and tissue dispensers, and automatic hand dryers. Lighting comprises Envision LED 4-foot vapor tight fixtures and Lithonia emergency lighting. Three Dyna-Glow 5000W forced air electric garage heaters (one per side and one in pipe chase) each require 30-amp double pole breakers. All hot water plumbing has been removed; water service utilizes 1-inch Pex pipe with crimp fittings for above-ground and below-ground installations. Water closets are through-wall and accessible for maintenance via pipe chase.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B:
(Notes for Reference to Plan Sheets AB 01, EN 01, PB 01 and MB 01)
1.A Construction
2.A Fixture Schedule
3.A Lighting, Heater and Plumbing, Heater
1.A Construction Notes for AB01 PLAN sheet
1. Flooring shall be Silkal flooring system installed on concrete slab per manufacturers recommendations color to be approved by POC
2. All Exterior CMU shall be pigment split face CMU (sandstone in color) with matching color mortar color to be approved by This includes door screen portion. See photo for example.
3. All interior CMU walls shall be primed and painted with porter dura-glaze semi-gloss epoxy or equal (white). Doors shall be painted beige color to be approved by POC and shall have signage to designate men’s and women’s accordingly.
4. All exterior CMU walls shall be insulated with core fill 500 foam insulation in all cells other than those grouted. All insulation shall occur following masonry work and done in two separate lifts if possible.
5. White Metal ceiling panels (AG PANEL STYLE) 36" wide shall be attached to bottom of trusses with screws of matching color and will be trimmed with metal J-channel with matching color or other method approved by POC. Ceiling shall have 6” insulation batts laid on top throughout entire building.
6. Metal hinged attic access door with latch shall be installed in mechanical room for future access.
7. Pre-engineered wood trusses with 6/12 pitch on16” O.C. maximum spacing or as noted on manufacturers installation drawings, blocking as required. Hurricane clips on all trusses.
8. 7/16” OSB sheeting attached to trusses with 1 ½”screws as recommended by manufacturer.
9. Hunter Green metal roof panels in (AG panel style) 36” wide, including trim and accessories, shall be installed per manufacturers recommendations on roof structure. Panels will have 5/16” foil bubble insulation installed under entire roof structure.
10. Exhaust fan will be operated by occupancy sensors used for lights.
11. A 5' wide sidewalk shall be installed around entire building with downspout locations to have pipe drain install against building and extend to daylight. Sidewalk shall be 4000lb mix and have continuous welded wire or steel re-bar reinforcement (3 continuous runs)placed prior to pouring. Reinforcement shall be raised and secured 2" form top of pour prior to pour occurring.
Sidewalk finish shall be lightly broom finished of depth of less than 1/8". Expansion joints may be placed with hand tools or saw may be used. Joints to be evenly installed with max spacing 8' apart. Sidewalk shall slope away from building 1/2" over 5'.
2.A Fixture Schedule Notes for AB01 PLAN sheet
A. P-3 American Standard 45W821 wall mount lavatory (white) with Delta 2529lF-HDF deck mount faucet with blade handles
B. P-3A American Standard wheelchair lavatory with Delta 2529LF-HDF deck mount faucet with blade handles
C. P-1-A American Standard Afwall millennium elongated bowl with back spud (white) 1.1/
1.6 GPF
D. P-2 American Standard wash brook flow wise -wall hung -back spud urinal (white)
.125/1.0 GPF
E. P-1 Same as P-1A
G. P-7 drinking fountain- DELETED
H. Comtec HDPE toilet compartment (floor mounted- overhead braced)
I. Comtec HDPE urinal partition
K. DELETED
L. Bobrick 20-gal surface mounted waste receptacle (b-275) or equal
N. Bobrick multi roll toilet tissue dispenser (B-2888) or equal
P. Louvered sight proof vent (closable for winter)
Q. Global industrial high velocity automatic hand dryer- brushed stainless- 120V model 641164 or equal
3.A Lighting fixture, Heater, and Plumbing Notes for PLAN Sheets AB 01, EN 01, PB 01, MB 01
Lighting (AB 01, EN 01)
A. 10- 4’ LED vapor tight fixture Envision LED model#led-vpt-4ft-3p50-5cct-UNV or equivalent
B. DELETED
C. 2- 4’ LED vapor tight fixture Envision LED model#led-vpt-4ft-3p50-5cct-UNV or equivalent
D. 1 35-WATT LITHONIA TWL-355-120-PE-DMB or equivalent
E. 2 LITHONIA lighting basics LED emergency lighting with dual head (EU2C M6)
Heater (AB01, MB 01, EN01)
(3)- DYNA-GLOW 5000W 240V FORCED AIR ELECTRIC GARAGE HEATER MODEL #
EG5000DGC (One heater per side and one in pipe chase. These require (1)30A double pole breakers each unit.
Plumbing (AB01, PB 01)
1. All water closets shall be through wall and accessible for maintenance in pipe chase.
2. All hot water plumbing has been removed.
3. Drinking fountain removed and all associated with it.
4. Pipe for above ground water service shall be Pex 1” with crimp on fittings.
5. Pipe for below ground from existing service shall be Pex 1”with crimp fittings as needed.