About this file

This is a Request for Proposals (RFP) issued by Lincoln County Schools District (LCSD) in Lincolnton, Georgia, for the removal and installation of classroom and office flooring at Lincoln County Elementary School. The project encompasses 28 rooms requiring asbestos-containing material (ACM) abatement, with the removal of existing flooring consisting of carpet and vinyl composite tile (VCT), some of which contains ACM. The LCSD has already procured KAHRS Upofloor Quartz tile for installation. The scope includes removal of wall and floor cabinets in some rooms with reinstallation upon project completion. The project is scheduled to commence on May 30, 2023, following the departure of teachers and staff on May 26, 2023, with a mandatory completion date of July 21, 2023. The winning contractor is responsible for disposal of all old flooring and associated debris in accordance with appropriate guidelines.

This is a Federally Funded project that must comply with Davis-Bacon Act requirements, which will apply to prevailing wage determinations for the winning contractor. The bid solicitation does not specify pricing terms, set-asides, or award dates in the available documentation. Interested bidders should contact Lincoln County Schools District at 423 Metasville Road, Lincolnton, Georgia 30817-3444, by telephone at (706) 359-3742, by fax at (706) 359-7938, or through the district website at www.lincolncountyschools.org for additional project details and submission requirements.

Text of this file

LINCOLN COUNTY SCHOOLS

Dr. Samuel P. Light, Superintendent of Schools

The LCSD is soliciting bids for LCES Classroom flooring removal and installation.

The LCSD is seeking bids for Removal and Installation of the classrooms and Office flooring (of which 28 rooms are ACM and will need to be abated).

The LCSD has already procured the flooring: KAHRS UPOFLOOR QUARTZ. The LCSD is requesting bids from qualified installers to remove existing flooring (Carpet, VCT, some of which is ACM) and replace it with the Upofloor Quartz Tile.

In some rooms, there are wall/floor cabinets that will need to be removed and put back after the flooring is completed.

The Project can commence on May 30, 2023. We will still have teachers and staff until the 26th. The project must be completed by Jul 21, 2023.

This is a Federally Funded project and MUST meet the Davis-Bacon Act requirements.

The company that wins the bid is responsible for the disposal of the old flooring and associated debris according to appropriate guidelines.

423 Metasville Road ◊ Lincolnton, Georgia 30817-3444 ◊ (706) 359-3742 ◊ Fax (706) 359-7938 www.lincolncountyschools.org image6.png image4.png image7.png image5.png image1.jpg image2.jpg image3.png

Other files

File Type Posted
Classroom Flooring —
LCSD Elementary School Tile —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .