This document is an Addendum No. 1 for the City of Jackson Project No. COJ-BCG-01, a Bridge Clearing and Grubbing project located in Jackson, Mississippi. The addendum, dated July 11, 2025, clarifies key project details and responds to bidder questions, with the bid opening scheduled for Tuesday, July 22, 2025, at 3:30 AM at the Municipal Clerk's office. The project involves clearing and grubbing within the bridge right of way, with sealed bids to be received at 219 South President Street, Jackson, Mississippi 39201 until 3:30 p.m. on the bid date.
The addendum provides critical clarifications for potential bidders, including confirmation that there are no DBE/WBE participation requirements for this project. Key technical specifications include that mulching to ground level is acceptable for stump removal, all cleared trees must be removed from the site, and all disturbed areas, including creek banks, must be grassed upon completion as directed by the Engineer. Bidders are required to acknowledge receipt of this addendum by signing and attaching proof of receipt to their bid documents, with the option to email or fax the acknowledgment to 601-968-9192.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 268-20250714142902 JACKSON.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
TO: All Bidders
DATE: July 11, 2025
PROJECT: City of Jackson Project No. COJ-BCG-01 Bridge Clearing and Grubbing
OWNER: City of Jackson, MS
The following additions and revisions are to become a part of the Proposal and Contract Documents of the above referenced project. The General Contractors are responsible for bringing this Addendum to the attention of their Subcontractors and Material Suppliers.
BID OPENING BID DATE
• For Clarity, the bid opening for this above referenced project is scheduled for Tuesday, July 22, 2025 at 3:30 AM
• Sealed bids will be received by the Municipal Clerk’s office of the City of Jackson, Mississippi at 219 South President Street, Jackson, Mississippi 39201 until 3:30 p.m. on the 22nd day of July, 2025 and shortly thereafter publicly opened for the construction of Bridge Right of Way Clearing and Grubbing being known as City of Jackson Project No.
COJ-BCG-01 in Jackson, Mississippi.
QUESTION RECEIVED
1. Will there be a required minority (DBE/WBE) participation for this project?
There are no DBE/WBE participation requirements for this project.
2. Instead of stump removal, can mulching be done to ground level? Will disturbed work areas and creek banks need to be grassed afterward?
Yes, mulching to ground level is acceptable. All disturbed areas, including creek banks, must be grassed upon completion as directed by the Engineer. This is considered an absorbed item.
3. Is the “length of project” the distance running parallel to the roadway? And is the “Right of way” the distance running perpendicular to the roadway?
Yes, the “length of the project” refers to the distance running parallel to the roadway, while the “Right of Way” refers to the distance running perpendicular to the roadway. For clarification, the Right of Way distance shown on the Bid Proposal Form represents the full width from one Right of Way limit to the opposite Right of Way limit, not from the roadway centerline to a single Right of Way limit.
4. Can cleared trees be left on site, or must they be removed? Is mulching acceptable for trees along the banks?
All cleared trees must be removed from the site. Mulching is an acceptable method for tree removal.
5. Are stumps required to be removed, or can they remain in place?
Stumps are to be removed completely or mulched to ground level.
ADDENDUM NO. 1
Note that above-mentioned bid date shall apply to all sections in the bid document.
PLEASE NOTE THAT ALL ITEMS IN THIS ADDENDUM SHALL SUPERSEDE ITEMS IN
CONFLICT WITH THE PLANS AND SPECIFICATIONS.
PLEASE: ALL BIDDERS MUST ACKNOWLEDGE THE RECEIPT OF THE
ADDENDUM. PROOF OF THE RECEIPT OF ADDENDUM MUST BE ATTACHED TO
THE REQUIRED BID DOCUMENTS AT THE DATE AND TIME OF THE RECEIPT OF
BIDS.
Acknowledge receipt of the Addendum by signing, dating below, emailing, or faxing this sheet to 601-968-9192.
Company Name ______________________________________
Signature: ______________________________________
Date Acknowledged: _________________________________
| TO: All Bidders |
| DATE: July 11, 2025 |
| The following additions and revisions are to become a part of the Proposal and Contract Documents of the above referenced project. The General Contractors are responsible for bringing this Addendum to the attention of their Subcontractors and Material... |
File details come from the government source that posted it. Updated .