City Apartments Remodel Project
This is a scope of work document for the City Apartments Remodel Project, a remodeling initiative for a city-owned 10-unit apartment complex. The project encompasses interior remodeling services across three distinct scopes: Kitchen Remodel, Bathroom Remodel, and Combined Kitchen and Bathroom Remodel. The work includes demolition, installation of cabinetry, countertops, and fixtures, along with plumbing, electrical, lighting, finishes, and all associated work necessary to complete the renovations. The document specifies that contractors must furnish all labor, materials, tools, equipment, and services reasonably incidental to the remodeling work as detailed in the contract documents.
The document does not specify pricing terms, bid amounts, response deadlines, or award dates within the scope of work itself. No information regarding set-asides, incumbent contractors, funding sources, or financial requirements is provided in this file. The scope of work establishes that all items and details required by the contract documents must be furnished and performed by the contractor, though specific contract terms, bonding requirements, insurance mandates, licensing requirements, and project timelines are not detailed in this particular document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF IMPERIAL
Imperial, California
CONTRACT DOCUMENTS AND
SPECIFICATIONS FOR
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-03
Funding Source:
Permanent Local Housing Allocation Program (PLHA)
Local City Apartment Funds
City of Imperial
City Manager’s Office 420 S. Imperial Ave Imperial, CA 92251
(760) 355-5302 | www.Cityofimperial.org
KEY DATES (Subject to Change):
Issue Date: April 08, 2026 Non-Mandatory Site Visit: April 30, 2026 (8:30am PST) Deadline for Questions: May 08, 2026 (2:00pm PST) Proposal Due Date: May 21, 2026 (2:00pm PST) Bid Opening: May 21, 2026 (2:00pm PST)
APRIL 2026
http://www.cityofimperial.org/
TABLE OF CONTENTS
TABLE OF CONTENTS
NOTICE INVITING SEALED BIDS
INSTRUCTIONS TO BIDDERS
BID PROPOSAL DOCUMENTS
Bid Proposal Bidder’s Information Contractor’s License Statement List of Subcontractors References Designation of Sureties Bid Bond Non-Collusion Affidavit Proposal Bid Sheet ................................................................................. 25-32 Bid Proposal
CONTRACT DOCUMENTS
Contract Agreement Contract Performance Bond Payment Bond General Liability Endorsement Automobile Liability Endorsement Worker’s Compensation/Employees Liability Endorsement
GENERAL SPECIFICATIONS
Scope of Work Location of Work Time of Completion Traffic Requirements Utility Requirements Flow and Acceptance of Water Removal of Water Trench Excavation and Shoring Standard Specifications Wage Rates and Labor Codes
PART I – SPECIAL PROVISIONS
Section 1. Terms, Definitions, Abbreviations and Symbols Section 2. Scope and Control of the Work Section 3. Changes in Work Section 4. Control of Materials Section 5. Utilities Section 6. Prosecution, Progress and Acceptance of the Work Section 7. Responsibilities of the Contractor Section 8. Measurement and Payment
APPENDIX A – CALIFORNIA STATE GENERAL PREVAILING WAGE RATES
APPENDIX B – SITE MAP & PHOTOS
APPENDIX C – IMPROVEMENT PLANS
NOTICE INVITING SEALED BIDS
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-03
PUBLIC NOTICE IS HEREBY GIVEN that the City of Imperial, as CITY, invites sealed bids for the above stated project and will receive such bids in the offices of the City Clerk at 420 S. Imperial Avenue, Imperial, California 92251 up to the hour of 2:00 P.M. on Thursday, May 21, 2026. On Thursday, May 21, 2026, at 2:00 P.M. the City will publicly open and read aloud all bids properly received.
A bid summary will then be prepared and posted. A Non-Mandatory Pre-Bid meeting, followed by a project site walk, will be conducted at 8:30 A.M. on Thursday April 30, 2026 at 420 South Imperial Avenue, Imperial, CA.
CITY APARTMENTS REMODEL PROJECT scope of work is as follows:
Remodeling services for City owned 10-unit apartment complex. The City intends to solicit bids/pricing for the following scopes of work:
•Kitchen Remodel •Bathroom Remodel •Combined Kitchen and Bathroom Remodel
The work includes interior remodeling of kitchens and bathrooms in City-owned apartment units, including but not limited to demolition, cabinetry, countertops, fixtures, plumbing, electrical, lighting, finishes, and associated work.
Respondents may submit proposals for projects individually (Project A–Kitchen Remodel) (Project B–Bathroom Remodel), or as combined project (Combined Project A&B-Kitchen/Bathroom Remodel). The project may be awarded as a single project (Kitchen Remodel or Bathroom Remodel), or as one combined contract (Kitchen+ Bathroom Remodel), based on the lowest responsible bidder, subject to availability of funding and the best interests of the City. Each bid amount stands independently and is binding.
Project A – Kitchen Remodel
1) Advising clients on material recommendations and options to maximize energy efficiency, while enhancing the aesthetic value.
2) Obtaining all necessary permits and ensuring work complies with building codes.
3) Implementing security measures on the job site to prevent theft, trespass, and damage.
4) Prep interior and exterior of site as needed, General Demolition to include removal and proper disposal of existing materials (inside & outside).
5) Inspection of structural components to identify and make necessary repairs, to include plumbing, structural framing and electrical.
6) Inspection and proper measurement, dimensions listed in this RFP are approximate for reference only.
7) Fitting and installation of new fixtures, to include:
a) Kitchen Cabinets
i) Install new factory-finished cabinets (minimum KCMA-certified), plywood boxes or equal, soft-close hardware, moisture-resistant construction where adjacent to wet areas.
b) Kitchen Countertops
i) Install countertops (laminated/solid surface) with seamless backsplashes at height. Provide edge profiles and sealing per manufacturer.
c) Kitchen Plumbing
i) Replace sink, faucet (low-flow compliant), traps, supply lines; verify dishwasher connections; replace shut-off valves. Pressure test and code compliance.
d) Kitchen Electrical
i) Provide GFCI outlets, dedicated circuits as required, LED ceiling fixture, appliance receptacles per code.
e) Kitchen Flooring
i) Install new vinyl plank flooring with moisture barrier and transitions. Cove base where required.
ii) Slip-resistant; water-resistant; low-maintenance.
f) Kitchen Range Hood, verify clearance and ventilation
8) Cap and caulk will match color of new cabinets and walls
9) Drywall repair, Painting of new drywall and other areas appropriate areas worked on.
a) Walls/ceiling/trim: low-VOC; washable eggshell/satin for walls; semi-gloss for trim/doors; color options coordinated with the City.
b) Caulk and seal per spec.
10) Contractor to field verify all work.
11) Contractor will submit product approval at contract signing with energy rated and warranty documentation (where appropriate) to be submitted prior to final pay request.
12) Complete cleanup of the job site, ensuring all debris and materials are removed and the site is left in good condition.
Project B – Bathroom Remodel
1) Advising clients on material recommendations and options to maximize energy efficiency, while enhancing the aesthetic value.
2) Obtaining all necessary permits and ensuring work complies with building codes.
3) Implementing security measures on the job site to prevent theft, trespass, and damage.
4) Prep interior and exterior of site as needed, General Demolition to include removal and proper disposal of existing materials (inside & outside).
5) Inspection of structural components to identify and make necessary repairs, to include plumbing, structural framing and electrical.
6) Inspection and proper measurement, dimensions listed in this invitation to bid are approximate for reference only.
7) Fitting and installation of new fixtures, to include:
a) Bathroom Waterproofing
i) Provide ANSI A1 18.10-compliant waterproofing membranes for wet areas.
Coordinate with tile backer (cement board) and manufacturer’s system.
b) Bathroom Plumbing
i) Replace toilet (WaterSense)
ii) Sink and drainage, faucet (low-flow)
iii) Tub/shower valve and trim, drain assemblies, showerhead.
iv) New shut-offs, pressure testing.
c) Bathroom Shower/Tub Enclosure (Tile & Finishes)
i) Install tile to specified pattern (walls/floor).
ii) Provide grout per spec (epoxy or polymer - modified as specified).
iii) Tub, slopes to drains; expansion joints.
iv) Tile ceramic or porcelain, minimum 3”x6” or 12”x24” formats; water-resistant backer, mold-resistant grout; appropriate waterproofing membrane.
d) Bathroom Vanity & Tops
i) Install new vanity cabinet and countertop (solid surface/laminate). Provide mirror and accessories.
e) Bathroom Flooring
i) Install new vinyl plank flooring with waterproof underlayment. Base per spec.
ii) Slip-resistant; water-resistant; low-maintenance.
f) Bathroom Electrical
i) Install GFCI outlet(s)
ii) Install LED ceiling light with vacancy switch (as per code)
iii) Install exhaust fan (sone rating ≤ 50 CFU)
iv) Switches for lighting and fan separate circuit.
v) Verify dedicated circuits as required.
8) Cap and caulk will match colors of new bathroom cabinets and walls.
9) Drywall repair, Painting of new drywall and other areas appropriate areas worked on.
a) Walls/ceiling/trim: low-VOC; washable eggshell/satin for walls; semi-gloss for trim/doors; color options coordinated with the City.
b) Caulk and seal per spec.
10) Contractor to field verify all work, ensure fixtures and clearances meet applicable ADA/UFAS/PHAs standards in units are designated accessible.
11) Contractor will submit product approval at contract signing with energy rated and warranty documentation (where appropriate) to be submitted prior to final pay request.
12) Complete cleanup of the job site, ensuring all debris and materials are removed and the site is left in good condition.
All products must be new, free from defects, and suitable for heavy-use residential environments.
All material options must be comparable in cost, appearance, quality, and performance.
The Contractor shall provide City with a minimum of two (2) to three (3) options for all finished material associated with the kitchen and bathroom remodel. All required options shall be included as part of the base bid, with no additive or deductive cost differences between the selections.
Contractor’s base bid shall cover the furnishing and installation of any one (1) of the City’s selected options.
The Contractor shall submit two (2) to (3) three equivalent, cost-neutral options for the following finish components:
• Cabinet finishes
• Countertops
• Flooring materials
• Wall tile and shower/tub surrounds
• Plumbing fixtures styles and finishes
• Hardware (e.g., cabinet pulls, faucets, towel bars)
• Paint colors (walls, ceilings, and trim)
Each option shall include:
1. Product specifications, including manufacturer, model number, composition, and warranty information.
2. Material samples or digital sample boards, clearly labeled and representative of actual installed appearance.
3. Confirmation of cost neutrality, stating that all proposed options are comparable in price, durability, and availability and can be under the base bid amount.
4. Lead-time verification, ensuring that each option meets the project schedule requirements without delay.
The City will select the preferred finish options after reviewing the contractor’s submittals. The Contractor shall not procure materials until receiving written approvals. Any proposed substitution must comply with the project’s substitution procedures and receive prior written authorization from the City.
Contractor shall coordinate temporary relocation logistics with the City’s designated relocation lead (City staff). Contractor will provide City with a unit-by-unit 3-week look-ahead schedule. City will issue tenant notices. Contractor shall provide minimum 7-day advanced notice to entry and 48-hour confirmation.
Contractor will maintain safe egress; post signage; daily clean-up; dust control and odors; isolate work areas. Contractor will assist in moving and protecting furniture/appliances within units or to designated storage, with protective coverings and inventory.
*The City reserves the right to award:
a) The Kitchen Remodel (described as Project A-Kitchen Remodel) only,
b) The Bathroom Remodel (described as Project B-Bathroom Remodel) only, or
c) The Combined Kitchen + Bathroom Remodel (described as Project A&B Combined
Kitchen/Bathroom Remodel).
The project may be awarded as a single project (Kitchen Remodel or Bathroom Remodel), or as one combined contract (Kitchen + Bathroom Remodel), based on the lowest responsible bidder, subject to availability of funding and the best interests of the City. Each bid amount stands independently and is binding.
To minimize potential temporary tenant relocation, reduce coordination challenges and limit disruptions to current residents of the fully occupied complex, the City if in its determination to award a combined contract (Kitchen + Bathroom Remodel), the contract will be awarded a single bidder based on the lowest responsible bidder, subject to availability of funding and the best interests of the City.
Please see Appendix A, B and C for more information.
The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals, as required by the contract documents. Contractor will also be responsible for accurate measurements.
Bid packages (USBs) are available at the City of Imperial City Hall, located at 420 South Imperial Avenue, Imperial, California 92251, upon payment of a $85.00 non-refundable fee ($100.00 if mailed). Only those firms that have purchased the bid documents will be provided with any addendums that may be issued for this project prior to the bid opening date.
Any contract entered into pursuant to this notice will incorporate the provisions of State Labor Code of the State of California. Compliance with the higher State prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required.
CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60- 4.3(a), and its efforts to meet the goals established for the geographical area where the contract resulting from the solicitation is to be performed. The hours of minority and female employment and training must be substantially uniform through the duration of the contract, and in each trade, and the Contractor shall make a good faith effort to employ women and minority individuals evenly on each of its projects.
The transfer of minority or female employees or trainees from contractor to contractor or from project to project for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, the Executive Order, and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.
Each bid must be accompanied by a guaranty of cash, certified check, cashier's check or bid bond made payable to the City of Imperial for an amount equal to at least ten percent (10%) of the bid.
Such guaranty to be forfeited should the bidder to whom the contract is awarded fails to enter the contract. All guaranties to be returned after the contract is awarded. In conformance with the State of California Public Contract Code Section 22300, the contractor may substitute securities for any funds withheld by the City to ensure performance under the contract. At the request and expense of the contractor, securities equivalent to the amount withheld shall be deposited with the City or with a State or Federally chartered bank as the escrow agent who shall pay such funds to the contractor upon notification by the City of the contractor's satisfactory completion of the contract. The type of securities deposited and the method of release shall be approved by the City Attorney's office.
As used in this notice, and in the contract resulting from this solicitation, the “covered area” is in the City of Imperial in Imperial County, State of California.
The contract documents call for monthly payments based upon the engineer’s estimate of the work completed. The City of Imperial will retain five percent (5%) of each progress payment as security for completion of the balance of the work. At the request and expense of the successful bidder, the City will pay the amounts so retained upon compliance with the requirements of Public Contract Code Section 22300 and the provisions of the contract documents pertaining to Substitution of Securities.
Bids must be prepared on the approved proposal forms in conformance with the instructions to Bidders and submitted in a sealed envelope plainly marked on the outside:
CITY CLERK
ATTN: Aimee Osuna, Assistant City Clerk
The Bid Proposal should be delivered no later than 2:00 P.M. on Monday, May 21, 2026, addressed as follows:
City of Imperial, City Hall – City Clerk 420 S. Imperial Avenue, Imperial, CA 92251
Questions concerning the proposal should be directed to Cody Burch, Fleet and Facilities Supervisor via email: cburch@imperial.ca.gov. Questions should be received no later than 2:00 P.M.
Friday, May 8, 2026.
Clarification desired by a proposer shall be requested in writing with sufficient time to allow for a response prior to the date Bid Proposals are due. Oral explanation or instructions shall not be considered binding on behalf of the City.
Any modifications to this solicitation will be issued by the City as a written addendum. The City will not consider proposals received after the specified time and date. This bid proposal does not commit the City of Imperial to award a contract or pay any costs associated with the preparation of a Proposal.
The City of Imperial reserves the right to reject any or all bids, to award each item separately, delete portions of the work, and/or waive any informality on any bid. No bid may be withdrawn for 60 days after the time set for the opening thereof. Failure by the successful bidder to enter into a contract with the City or to deliver goods and/or services in accordance with the bid may result in a declaration by the City that the bidder is not a responsible bidder, and elimination from consideration in future bidding.
No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1 (a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Any bid submitted by a contractor or subcontractor not properly licensed and not registered with the Department of Industrial Relations shall be considered non-responsive and will be rejected.
At the time of contract award, the prime contractor shall possess a Class “A” contractor’s license and/or any combination of “C” specialty contractor’s license(s) sufficient to perform the work.
INSTRUCTIONS TO BIDDERS
FOR
PROPOSAL FORMS
Bids shall be submitted in writing on the Bid Proposal forms provided by the CITY, all forms must be filled and initialed. All information requested therein must be clearly and legibly set forth in the manner and form indicated. The CITY will not consider any bid proposal not meeting these requirements and/or not submitting all forms requested herein.
Bidders may bid:
a) Kitchen Remodel only,
b) Bathroom Remodel only,
c) Both Kitchen Remodel only and Bathroom Remodel only, and/or
d) Combined Kitchen + Bathroom Remodel.
Each bid amount stands independently and is binding, the City reserves the right to reject any or all bids.
PROPOSAL GUARANTEE (BID BOND)
Proposals must be accompanied by a proposal guarantee consisting of a certified check or bid bond payable to the CITY in the amount of (10%) of the total amount Bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a contract is awarded fails or refuses to execute the contract documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the CITY. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all contract documents.
NON-COLLUSION AFFIDAVIT
Bidder shall declare that the only persons or parties interested in the proposal as principals are those named therein; that no officer, agent, or employee of the CITY is personally interested, directly or indirectly, in the proposal; that the proposal is made without connection to any other individual, firm, or corporation making a bid for the same work; and that the proposal is in all respects fair and without collusion or fraud. The Non- Collusion Affidavit shall be executed and submitted with the proposal.
PROPOSAL BID SHEET
Bidders shall give unit prices for each and all of the items set forth. No aggregate bids will be considered. The bidder shall set forth for each item of work, in clearly legible figures, a unit item price and a total for the item in the respective spaces provided for this purpose. The quantities listed in the Bid sheets are supplied to give an indication of the general scope of work, but the accuracy of figures is not guaranteed, and the bidder shall make his own estimates from the drawings. In case of a variation between the unit price and the totals shown by the bidder, the unit price will be considered to be the bid.
No bidder may withdraw his proposal for a period of forty-five (45) days after the time set for opening thereof. However, the CITY will return all proposal guaranties within ten (10) days after the award of the contract or rejection of the bids, as the case may be, to the respective bidders whose proposals they accompany.
DELIVERY OF PROPOSAL
Proposals may be mailed or delivered by messenger. However, it is the bidder’s responsibility alone to ensure delivery of the proposal to the hands of the CITY’s designated official prior to the bid opening hour stipulated in the “Notice Inviting Sealed Bids.” Late proposals will not be considered.
WITHDRAWAL OF PROPOSALS
A proposal may be withdrawn by a written request signed by the bidder. Such requests must be delivered to the CITY’s designated official prior to the bid opening hour stipulated in the “Notice Inviting Sealed Bids”. The withdrawal of a proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so. Proposals may not be withdrawn after said hour without forfeiture of the proposal guarantee.
IRREGULAR PROPOSALS
Unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered.
TAXES
No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all unit prices and bid amounts will be deemed and held to include any such taxes, which may be applicable.
DISQUALIFICATION OF BIDDERS
In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified.
This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor.
No contract will be executed unless the bidder is licensed in accordance with the provisions of the State Business and Professions Code.
INTERPRETATION OF PLANS AND DOCUMENTS
If any person contemplates submission of a bid for the proposed contract and is in doubt as to the true meaning of any part of the services to be performed, he may submit to the Engineer of the CITY a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery.
Any interpretation or correction of the proposed documents shall be made only by addendum duly issued and copy of such addendum will be mailed or delivered to each person receiving a set of such documents.
The Engineer will not be responsible for any other explanation or interpretations of the proposed documents.
ADDENDA OR BULLETINS
All bidders are advised as to the possibility of issuance of addenda affecting the items, scope or quantity of the work required for this project. Each bidder shall be fully responsible for informing himself as to whether or not any such addenda have been issued. The effect of all addenda to the Contract Documents shall be considered in the bid, and said addenda shall be made a part of the contract documents and shall be returned with them. Failure to cover in his bid any such addenda issued may render his bid irregular and may result in its rejection by the CITY.
LEGAL RESPONSIBILITIES
All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same are expressly referred to herein or not.
Any Bidder submitting a proposal shall, by such action, thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Contract Documents and to full compliance therewith.
AWARD OF CONTRACT
Following a review of the bids, the CITY shall determine whether to award the contract or to reject all bids. The award of the contract, if made, will be to the lowest responsible Bidder, described below, as determined solely by the CITY. At the time of contract award, the successful Bidder shall hold a Class B Contractors License, as required to perform the work, issued by the State of California.
Additionally, the CITY reserves the right to reject any or all proposals, to accept any bid or portion thereof, to waive any irregularity, and to take the bids under advisement for the period of time stated in the “Notice Inviting Sealed Bids”, all as may be required to provide for the best interests of the CITY. In no event will an award be made until all necessary investigations are made as to the responsibility and qualifications of the Bidder to whom the award is contemplated.
The City may award the project as a single project (Kitchen Remodel or Bathroom Remodel), or as one combined contract (Kitchen + Bathroom Remodel), based on the lowest responsible bidder, subject to availability of funding and the best interests of the City. Each bid amount stands independently and is binding.
To minimize potential temporary tenant relocation, reduce coordination challenges and limit disruptions to current residents of the fully occupied complex, the City if in its determination to award a combined contract (Kitchen + Bathroom Remodel), the contract will be awarded to a single bidder based on the lowest responsible bidder, subject to availability of funding and the best interests of the City.
No bidder may withdraw his proposal for a period of forty-five (45) days after the time set for opening thereof. However, the CITY will return all proposal guarantees within ten (10) days after the award of the contract and execution of the contract documents or rejection of the bids, as the case may be, to the respective bidders whose proposals they accompany.
LABOR CODE
Pursuant to the provisions of Section 1773 of the Labor Code of the State of California (herein referred to as Labor Code), the CITY has obtained the general provisions rate of per diem wages and the general prevailing rate for holiday and overtime work in this locality for each craft, classification or type of workman needed to execute the contract from the Director of the Department of Industrial Relations. These rates are on file with the Clerk of the CITY.
Travel and subsistence payments to each workman needed to execute the work shall be made as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Section 1773.8 of the Labor Code.
The Contractor shall comply with the provisions of Section 1774 of the Labor Code. Failure to comply with the subject section will subject the Contractor to penalty and forfeiture provisions of Section 1775 of the Labor Code.
Pursuant to the provisions of Section 1770 of the Labor Code, the general prevailing rate of wages has been ascertained (which rate includes employer payments for health and welfare, vacation, pension, and similar purposes) applicable to the work to be done for straight time, overtime, Saturday, Sunday and holiday work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification or type of workmen concerned.
The CITY will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate set forth in the contract. The possibility of wage increases is one of the elements to be considered by the Contractor in determining his bid, and will not under any circumstances be considered as the basis of a claim against the CITY on the contract.
The CONTRACTOR and subcontractors shall comply with Section 1777.6 of the Labor Code, which stipulates that it shall be unlawful to refuse to accept otherwise qualified employees as registered apprentices solely on the grounds of race, religious creed, color, national origin, ancestry, sex, or age, of such employee, except as provided in Section 3077 of the Labor Code.
WORKMAN’S COMPENSATION CERTIFICATE
Section 3700 of the Labor Code requires that every employer shall secure the payment of compensation by either being insured against liability to pay compensation with one or more insurers or by securing a certificate of consent to self- insure from the State Director of Industrial Relations.
In accordance with this section and with Section 1861 of the Labor Code, the contractor shall sign a Compensation Insurance Certificate, which is included with the Contract Agreement, and submit same to City along with the other required contract documents, prior to performing any work. Reimbursement for this requirement shall be considered as included in the various items of work.
CLAYTON ACT AND CARTWRIGHT ACT
Section 4551 of the State Government Code specifies that in executing a public works contract with the CITY to supply goods, services or materials, the Contractor or Subcontractor offers and agrees to assign to the CITY all rights, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 commencing with Sec. 16700) of Part 2 of Division 7 of the Business and Professions Code, arising from purchase of goods, services or materials pursuant to the contract or subcontract. This assignment shall become effective when the CITY tenders final payment to the Contractor without further acknowledgment by the parties.
SUBSTITUTION OF SECURITIES
In conformance with the State of California Public Contract Code Section 22300, the contractor may substitute securities for any funds withheld by the CITY to ensure performance under the contract.
At the request and expense of the contractor, securities equivalent to the amount withheld shall be deposited with the City or with a State or Federally chartered bank as the escrow agent who shall pay such funds to the contractor upon notification by CITY of Contractor’s satisfactory completion of the contract.
The type of securities deposited and the method of release shall be approved by the City Attorney’s office.
SUBLETTING AND SUBCONTRACTING
Pursuant to the Subletting and Subcontracting Fair Practices Act (commencing with Section 4100 of the Government Code), bidders are required to list in their proposal the name and location of place of business of each subcontractor who will perform work or labor or render services in or about the construction of the work or improvement or a subcontractor who specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the Plans and Specifications in excess of 1/2 of 1% of this prime contractor’s total bid. Failure to list a subcontractor for a portion of the work means that the prime contractor will do that portion of the work. It is the Agency’s intent for the Subletting and Subcontracting Fair Practices Act to apply to all phases of the work.
CITY BUSINESS LICENSE
The Contractor shall obtain a City of Imperial Business License prior to the City’s issuing the Notice to Proceed. The annual fee for the Business License is one hundred dollars ($100.00).
BID PROPOSAL
For
CITY APPARTMENTS REMODEL PROJECT
TO CITY OF IMPERIAL, as CITY:
In accordance with CITY’s “Notice Inviting Sealed Bids,” the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the Contract Documents and to perform all work in the manner and time prescribed.
BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instructions to Bidders, and Contract Documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with the CITY at the unit and/or lump sum prices set forth in the following Proposal Bid Sheet. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to the CITY of the Bid Bond accompanying this proposal.
BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Proposal Bid Sheet are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts.
BIDDER agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workman’s compensation or to undertake self-insurance in accordance with the provisions of that code, and that the BIDDER will comply with such provisions of that code before commencing the performance of this Contract if awarded it.
BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any agency, State, or Federal equal employment opportunity orders have been satisfactorily filed and that no such reports are currently outstanding.
BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the CITY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work; and that this proposal is in all respects fair and without collusion or fraud.
BIDDER certifies that affirmative action has been taken to seek out and consider disadvantaged business enterprises for those portions of the work to be subcontracted and that such affirmative actions have been carefully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents.
DATED: , 2026
BIDDER:
BIDDER’S ADDRESS: BY:
TITLE:
TELEPHONE #:
FAX #:
BIDDER'S INFORMATION
BIDDER certifies that the following information is true and correct:
Bidder's Name
Business Address
Telephone
State Contractor's License No. and Class
Original Date Issued Expiration Date
The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest in this proposal:
The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows:
All current and prior DBA's, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:
CONTRACTOR'S LICENSING STATEMENT
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.
Contractor's License Number:
DIR No#:
Name of Individual Contractor (Print or type):
Signature of Owner:
Business Address:
Or
Name of Firm:
Business Address:
Name: Title:
Address:
Or
Name of Corporation:
Corporation Address:
Corporation organized under the laws of the State of
Signature of President of Corporation
Signature of Secretary of Corporation
LIST OF SUBCONTRACTORS
BIDDER proposes to subcontract certain portions of the work, and to procure materials and equipment from suppliers and vendors as follows:
Name Under Which Specific Address Percent Subcontractor License of Office of Total Description Is Licensed No. Mill/Shop Contract of Subcontract
REFERENCES
The following are the names, addresses, and phone numbers for three public agencies for which BIDDER has performed similar work within the past two years:
DESIGNATION OF SURETIES
The following are the names, addresses, and phone numbers for all brokers and sureties from whom BIDDER intends to procure insurance and bonds:
BID BOND
KNOW ALL MEN BY THESE PRESENTS that , as BIDDER, and , as SURETY, are held and firmly bound unto the CITY OF IMPERIAL, as CITY, in the penal sum of dollars ($ ), which is ten percent (10%) of the total amount bid by BIDDER to the CITY for the above-stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to CITY for the above-stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise, it shall remain in full force and effect in favor of AGENCY.
WITNESS our hands this day of , 2025.
(seal)
CONTRACTOR (CORPORATION) – TYPE
By:
President
By Secretary/Treasurer
NOTE: SIGNATURE OF CORPORATE OFFICIALS MUST BE NOTARIZED.
Subscribed and sworn to before me this day of , 2026.
Notary Public
(Page 1 of 2)
SURETY’S NAME-TYPE
Mailing Address
Name
Title
NOTE: SIGNATURE OF SURETY MUST BE NOTARIZED.
(seal)
(Page 2 of 2)
NON-COLLUSION AFFIDAVIT
STATE OF CALIFORNIA )
) SS
COUNTY OF )
being first duly sworn deposes and says that he is (sole owner, a partner, president, etc.) of the party making the foregoing bid; that such bid is not made in the interest of or behalf of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or a sham, that said bidder has not directly or indirectly induced or solicited any other bidder to put in a sham bid, or that anyone shall refrain from bidding, that said bidder has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said bidder or of any other bidder, or to fix the overhead, profit, or cost element of such bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract or anyone interested in the proposed contract; that all statements contained in such bid are true, and further, that said bidder has not, directly or indirectly submitted his bid price, or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid and will not pay any fee in connection, organization, bid depository, or to any member or persons as have a partnership or other financial interest with said bidder in his general business.
Signed:
Title:
this day of ,2026.
PROPOSAL BID SHEET Page 1 of 2
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-03
(Project A)
KITCHEN REMODEL PROPOSAL/BID FORM
DESCRIPTION QUANTITY UNIT PRICE (per apartment)
TOTAL PRICE
Removal and Disposal of existing Kitchen fixtures and materials 10 Lump Sum
Replacement:
Kitchen Sink, plumbing drainage and faucets. 10
Kitchen Cabinets 10
Kitchen Countertops 10
Kitchen Range Hood 10
Kitchen Flooring 10
Kitchen Lighting and hardware 10
Hardware, Caulk and Material 10 Lump Sum
Drywall Repair and Paint 10 Lump Sum
Installation and finishing work 10 Lump Sum
Permits and City Business License
Total (Project A) Bid Price
PROPOSAL BID SHEET Page 2 of 2
FOR
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-06
(Project A)
KITCHEN REMODEL PROPOSAL/BID FORM
TOTAL AMOUNT OF BID PROPOSAL (NUMBERS)
TOTAL AMOUNT OF BID PROPOSAL (WORDS)
Note: The estimated quantities listed in the Proposal Bid Sheet(s) are supplied to give an indication of the general scope of the work, but the accuracy of these figures is not guaranteed and the bidder shall make his own estimates from the drawings. In case of a variation between the unit price and the totals shown by the bidder, the unit price will be considered to be the bid.
Bidder's Name and Telephone Number
NOTE 1: THE ESTIMATED QUANTITIES INDICATED ABOVE ARE
APPROXIMATE. THE ENGINEER WILL NOT ASSUME
RESPONSIBILITY FOR THE QUANTITIES ILLUSTRATED IN THE
PROJECT PLANS. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO ESTABLISH THE QUANTITIES.
NOTE 2: THE LOWEST RESPONSIVE BID WILL BE BASED ON THE
LOWEST TOTAL BID PROPOSAL.
PROPOSAL BID SHEET Page 1 of 1
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-03
(Project B)
BATHROOM REMODEL PROPOSAL/BID FORM
DESCRIPTION QUANTITY UNIT PRICE (per
TOTAL PRICE
Removal and Disposal of existing Bathroom fixtures and materials 10 Lump Sum
Replacement:
Vanity and Sink, to include plumbing, drainage and faucets. 10
Bathroom Mirror 10
Bathroom shower/tub to include plumbing, drainage and faucets. 10
Bathroom Flooring 10
Bathroom Lighting 10
Bathroom Exhaust Hood 10
Hardware, Caulk and Material 10 Lump Sum
Drywall Repair and Paint 10 Lump Sum
Total (Project B) Bid Price
PROPOSAL BID SHEET Page 2 of 2
FOR
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-03
(Project B)
BATHROOM REMODEL PROPOSAL/BID FORM
guaranteed and the bidder shall make his own estimates from the drawings. In case of a
RESPONSIBILITY FOR THE QUANTITIES ILLUSTRATED IN THE
PROPOSAL BID SHEET Page 1 of 2
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-03
(Project A & B Combined Proposal)
KITCHEN/BATHROOM REMODEL PROPOSAL/BID FORM
DESCRIPTION (Kitchen Project A) QUANTITY UNIT PRICE (per
TOTAL PRICE
Removal and Disposal of existing Kitchen fixtures and materials 10 Lump Sum
Replacement:
Kitchen Sink, plumbing drainage and faucets. 10
Kitchen Cabinets 10
Kitchen Countertops 10
Kitchen Range Hood 10
Kitchen Flooring 10
Kitchen Lighting and hardware 10
Hardware, Caulk and Material 10 Lump Sum
Drywall Repair and Paint 10 Lump Sum
DESCRIPTION (Bathroom Project B) QUANTITY UNIT PRICE (per
TOTAL PRICE
Removal and Disposal of existing Bathroom fixtures and materials 10 Lump Sum
Replacement:
Vanity and Sink, to include plumbing, drainage and faucets. 10
Bathroom Mirror 10
Bathroom shower/tub to include plumbing, drainage and faucets. 10
Bathroom Flooring 10
Bathroom Lighting 10
Bathroom Exhaust Hood
Hardware, Caulk and Material 10 Lump Sum
Drywall Repair and Paint 10 Lump Sum
Total (Combined Projects A &B) Bid Price $
PROPOSAL BID SHEET Page 3 of 3
FOR
CITY APARTMENTS REMODEL PROJECT
BID NO. 2026-03
(Project A & B Combined Proposal)
KITCHEN/BATHROOM REMODEL PROPOSAL/BID FORM
guaranteed and the bidder shall make his own estimates from the drawings. In case of a
RESPONSIBILITY FOR THE QUANTITIES ILLUSTRATED IN THE
BID PROPOSAL(s)
IN WITNESS WHEREOF, BIDDER executes and submits the attached bid proposal(s) with the names, titles, hands, and seals of all forenamed principals this day of
, 2026.
Bidder:
Subscribed and sworn to this day of , 2026.
NOTARY PUBLIC
AGENCY acknowledges this proposal was received and opened at the time and in the place specified, and that it was accompanied by the required guarantee in the amount of ten percent (10%) of the total bid.
CONSTRUCTION SERVICES AGREEMENT
(Agreement Example)
This CONSTRUCTION SERVICES AGREEMENT (“Agreement”) is made and effective, by and between the City of Imperial, a municipal corporation ("AGENCY"), and [insert contractor name], a [sole proprietorship, partnership, limited liability partnership, corporation] ("CONTRACTOR"). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:
I. SCOPE OF WORK
The CONTRACTOR shall perform within the time set forth in this Agreement and shall furnish all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications and Contract Documents. Contractor will also be responsible for accurate measurements.
CITY APPARTMENTS REMODEL PROJECT scope of work is as follows:
Remodeling services for a 10-unit apartment complex, to include remodel of bathrooms and kitchens of all 10 units (apartments). The work includes interior remodeling of kitchens and bathrooms in City-owned apartment units, including but not limited to demolition, cabinetry, countertops, fixtures, plumbing, electrical, lighting, finishes, and associated work.
Work will occur in occupied property. Contractor shall provide unit-by-unit schedule, maintain daily communication protocol and coordinate with City staff on relocation efforts and other tenant concerns.
Project A – Kitchen Remodel
1) Advising clients on material recommendations and options to maximize energy efficiency, while enhancing the aesthetic value.
2) Obtaining all necessary permits and ensuring work complies with building codes.
3) Implementing security measures on the job site to prevent theft, trespass, and damage.
4) Prep interior and exterior of site as needed, General Demolition to include removal and proper disposal of existing cabinets, countertops, sink/faucet, flooring, lighting fixtures and damaged drywall.
5) Inspection of structural components to identify and make necessary repairs, to plumbing, structural framing and electrical.
6) Inspection and proper measurement, dimensions listed in this invitation to bid are approximate for reference only.
7) Fitting and installation of new fixtures, to include:
a) Kitchen Cabinets
i) Install new factory-finished cabinets (minimum KCMA-certified), plywood boxes or equal, soft-close hardware, moisture-resistant construction where adjacent to wet areas.
b) Kitchen Countertops
i) Install countertops (laminante/solid surface) with seamless backsplashes at height. Provide edge profiles and sealing per manufacturer.
c) Kitchen Plumbing
i) Replace sink, faucet (low-flow compliant), traps, supply lines; verify dishwasher connections; replace shut-off valves. Pressure test and code compliance.
d) Kitchen Electrical
i) Provide GFCI outlets, dedicated circuits as required, LED ceiling fixture, appliance receptacles per code.
e) Kitchen Flooring
i) Install vinyl floor planks with moisture barrier and transitions. Cove base where required.
ii) Slip-resistant; water-resistant; low-maintenance.
f) Kitchen Range Hood, verify clearance and ventilation
8) Cap and caulk will match color of new cabinets and walls
9) Drywall repair, Painting of new drywall and other areas appropriate areas worked on.
a) Walls/ceiling/trim: low-VOC; washable eggshell/satin for walls; semi-gloss for trim/doors; color options coordinated with the City.
10) Contractor to field verify all work, ensure fixtures and clearances meet applicable
ADA/UFAS/PHAs standards in units are designated accessible.
11) Contractor will submit product approval at contract signing with energy rated and warranty documentation (where appropriate) to be submitted prior to final pay request.
12) Complete cleanup of the job site, ensuring all debris and materials are removed and the site is left in good condition.
Project B – Restroom/Bathroom Remodel
1) Advising clients on material recommendations and options to maximize energy efficiency, while enhancing the aesthetic value.
2) Obtaining all necessary permits and ensuring work complies with building codes.
3) Implementing security measures on the job site to prevent theft, trespass, and damage.
4) Prep interior and exterior of site as needed, General Demolition to include removal and proper disposal of existing materials.
5) Inspection of structural components to identify and make necessary repairs, to include plumbing, structural framing and electrical.
6) Inspection and proper measurement, dimensions listed in this invitation to bid are approximate for reference only.
7) Fitting and installation of new fixtures, to include:
a) Bathroom Waterproofing
i) Provide ANSI A1 18.10-compliant waterproofing membranes for wet areas.
Coordinate with tile backer (cement board) and manufacturer’s system.
b) Bathroom Plumbing
i) Replace toilet (WaterSense)
ii) Sink and drainage, faucet (low-flow)
iii) Tub/shower valve and trim, drain assemblies, showerhead.
iv) New shut-offs, pressure testing.
c) Bathroom Shower/Tub Enclosure Tile & Finishes
i) Install tile to specified pattern (walls/floor).
ii) Provide grout per spec (epoxy or polymer - modified as specified).
iii) Shower pan, slopes to drains; expansion joints.
iv) Tile ceramic or porcelain, minimum 3”x6” or 12”x24” formats; water-resistant backer, mold-resistant grout; appropriate waterproofing membrane.
d) Bathroom Vanity & Tops
i) Install new vanity cabinet and countertop (laminated/solid surface). Provide mirror and accessories.
e) Bathroom Flooring
i) Install (Tile/LVT) with waterproof underlayment. Base per spec.
ii) Slip-resistant; water-resistant; low-maintenance.
f) Bathroom Electrical
i) Install GFCI outlet(s)
ii) Install LED ceiling light required
iii) Install exhaust fan (sone rating ≤ 50 CFU)
iv) Vacancy switches on separate circuit as required.
v) Verify dedicated circuits as required.
8) Cap and caulk will match colors of new bathroom features and walls.
9) Repair drywall where needed as per new bathroom redesign.
10) Painting of new drywall and other appropriate areas worked on.
a) Walls/ceiling/trim: low-VOC; washable eggshell/satin for walls; semi-gloss for trim/doors; color options coordinated with the City
11) Contractor to field verify all work, ensure fixtures and clearances meet applicable ADA/UFAS/PHAs standards in units are designated accessible.
12) Contractor will…
This is the start of the file's text. The full file is on GovTribe.