CIP Updates five year plan 2024-05-21.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Civic Campus and Parks Master Plan
Solicitation number
S-KY0010-00010596
Issued by
Klamath County, Oregon

About this file

The document provided is a five-year capital improvement plan for the City of Yachats, Oregon that outlines various water, wastewater, street, storm drain, city hall, parks and trails, library, and LLCM (unspecified) projects for fiscal years 2023-2024 through 2028-2029. The plan includes project descriptions, original estimated costs, adopted appropriations, spending to date, remaining funds, and projected spending for each fiscal year. Key water projects include plant backwash system, SCADA upgrades, water plant electrical control system, and various pipeline, pump station, and reservoir improvements. Major wastewater projects encompass submersible pump plug installation, main lift station improvements, and SBR, digester, and UV disinfection control upgrades. Street, storm drain, and city hall facility improvements are also detailed. The total projected capital improvement budget across all funds is $34,465,500.

The plan indicates funding will be provided through enterprise funds and the general fund. No specific pricing terms, set asides, incumbents, or funding sources are provided. The document appears to be an internal planning tool for the City of Yachats to manage its capital projects over the next five fiscal years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIP

CITY OF YACHATS4/29/24
CAPITAL IMPROVEMENT PROJECTS
CIP BUDGETFISCAL 2023-2024SPEND or CARRYCIP 5 YEAR PROJECTION
BILLINGPROJECTSORIGINAL ESTIMATED COSTADOPTED
APPROPAPPROPS

AFTER

RECLASS(ACTUAL)
SPEND TO DATE(REMAINING)
AVAILABLE TO YEAR ENDEstimated Spending Apr-JunCARRY
FORWARDFISCAL
CIP YR1FISCAL
CIP YR2FISCAL
CIP YR3FISCAL
CIP YR4FISCAL
CIP YR5FISCAL CIP >5YRSTOTAL CIPNOTES
FUND/CODEMASTERPLANDEPARTMENT / DETAIL2023-20243/13/24@3/13/24@3/13/24@3/13/242023-20242024-20252025-20262026-20272027-20282028-2029>20292024 >
ENTERPRISEWATER (WTP)
WTPBKWSHPlant Backwash Recycle System142,000140,000140,00092,74747,25347,2530------0
WTPSCADASCADA Upgrade60,00049,04449,04491348,131048,13130,00030,00030,00030,00030,00030,000180,000
WTPUPGRDM/P T-1 (1)WTP Upgrade CIP Annually30,00030,00030,00015,04414,95614,956030,00030,00030,00030,00030,00030,000180,000
M/P D-10 (1)Combs Circle Pressure Release Valve Rehab40,0000000----40,000---40,000
Watertank Design Development10,00010,00010,000010,0000-------0
WPCLRRHBM/P T-2 (2)Water Plant Clarifier - Rehabilitation of Drives ($641k)250,000150,000150,0000150,0000150,000250,000-----250,000Critical Path. System is operating at less than optimum functionality.
M/P T-1 (1)Water Plant Electrical Control Systems - MCC (Master Control)814,0000000---407,000407,000-814,000Motor Drives are breaking down. Operating only at 50%.
M/P D-2 (1)System Pressure Release Valve Rehab/ Update50,0000000---50,000----50,000
M/P S-5 (1)Reedy Creek Raw Water Pipeline Improvements208,0000000--104,000104,000----208,000
M/P D-3 (1)Windsong Street Service Reconnections11,0000000---11,000----11,000
M/P D-4 (1)New PRV at 7th Street & Radar Road101,0000000----101,000---101,000
M/P D-5 (1)New PRV on King Street Between 7th and Prospect Ave101,0000000---101,000---101,000
M/P D-6 (1)New 8" Water Main on Radar Road at Prospect Ave57,0000000-----57,000--57,000Lines are Asbestos Concrete. Pending resolution on tank placement. Not Looping Projects
M/P D-7 (1)New 8" Water Main on King Street at Prospect Ave86,0000000-----86,000--86,000Lines are Asbestos Concrete. Pending resolution on tank placement. Not Looping Projects
M/P S-4 (1)Yachats River Intake and Raw Water Pipeline2,893,0000----------2,893,0002,893,000Hold pending SWLCPUD Tie in Agreement Determination
M/P S-2 (1)Yachats River Dvlpt Planning Work - Long Term Water Rights50,0000----------50,00050,000Hold pending SWLCPUD Tie in Agreement Determination
M/P T-3 (2)WTP Mixed Media Filter Rehabilitation350,0000----------350,000350,000
M/P T-4 (2)WTP Pump and Compressor Upgrades402,0000----------402,000402,000
M/P T-5 (2)WTP Instrumentation Upgrades271,0000----------271,000271,000
M/P T-6 (2)WTP Chemical Feed System Improvements205,0000----------205,000205,000
M/P D-8 (2)New 8" Water Main on Third Street167,0000-------167,000---167,000
M/P D-9 (2)New 4" Water Main and PRV on Horizon Hill Road (hillside rock)737,0000----------737,000737,000
M/P D-11 (2)Yachats Ocean Road Service Reconnections20,0000----------20,00020,000
M/P D-15 (2)Pontiac Street Waterline - 3rd to 4th88,0000--------88,000--88,000
M/P D-16 (2)Shell Street Waterline79,0000----------79,00079,000
M/P D-17 (2)Gender Drive and Windy Way Waterlines254,0000----------254,000254,000
M/P D-18 (2)Pontiac Street Waterline - 2nd to 3rd105,0000----------105,000105,000
M/P D-19 (2)Hanley Drive Waterline47,0000----------47,00047,000
M/P P-1 (2)New Radar Road Pump Station767,0000----------767,000767,000
M/P P-2 (2)New Horizon Hill Pump Station & Reservoir1,079,0000----------1,079,0001,079,000
1,000,000-gallon Reservoir Replacement6,000,0000----------6,000,0006,000,000
M/P ST-1 (2)New 200,000-gallon Lower Radar Road Reservoir2,000,0000----------2,000,0002,000,000
M/P ST-3 (2)Upper Radar Road Reservoir Seismic Retrofit Improvements1,013,0000----------1,013,0001,013,000
M/P D-20 (3)Automated Water Meter Reading System318,0000----------318,000318,000
Annual Hydrant Replacements10,0008,0008,00008,0000010,00010,00010,00010,00010,00010,00060,000
WTPTRUCKService Truck w/Lift80,00080,00080,00079,04595500------0Heavy Duty Service Truck w/crane. Condition of Existing Trucks is poor.
WTPTRUCKService Truck - Ranger30,00030,00030,00029,04295800------0Standard Truck. Condition of Existing Trucks is poor.
M/P T-7 (2)WTP Building Seismic Retrofit270,000-----------270,000270,000
WELECGTPublic Works Slide Gate20,00020,00020,000020,000020,00020,000-----20,000
Property Acquisition, Surveys, Geotech250,000250,000250,0000250,0000250,000280,000-----280,000
M/P ST-2 (2)Water Tank Seismic Retrofit Engineering60,00060,00060,00023,44436,5566,55630,00030,000-----30,000
Water Treatment Plant Fence20,00020,00020,000
Blackstone 126 res Fence25,00025,00025,000
Water Booster Stations Gensets70,00070,00070,000
M/P S-3 (1)Analysis / Engineering SWLCWPUD75,00075,00075,000-75,00075,000070,000100,000100,000100,000100,000100,000570,000Analysis / Engineering of Prosp. Intertie Agreement w/SWLCPUD
E2PHS2WLM/P D-13 (1)2ND ST PH2 Prospect-Loma Waterline Construction154,375154,375154,375160,7750--0-----02nd Street Phase II Bid
2ND ST PH3 Loma to River Rd Engineering - Water15,00015,00015,000Engineering 45k, 15k water, 10k wastewater, 20k streets storms
E2PHS3WLM/P D-13 (1)2ND ST PH3 Loma to River Rd Waterline Construction150,000------75,00075,000----150,000
Water Unplanned / Contingency25,00025,00025,00025,00025,00025,000150,000
TOTAL WTP20,034,3751,056,4191,056,419401,010661,809143,765498,1311,054,000842,0001,011,000426,000195,00017,055,00020,583,00020,583,000
ENTERPRISEMASTERPLANWASTEWATER (WWTP)
PUMPPLGSM/P P-1 (1)Submersible Pump Plug Engineering & Installation371,000265,000265,00032,162232,83838,838194,000300,000-----300,000Pump Plugs - price increased to 371k, estimating 71k spending FY23-24 and another 300k FY24-25
MLSPUMP4Main Lift Station Improve405,00050,00050,000050,00050,0000166,000166,000----332,000
Annual Inflow and Infiltration (I&I) Rehabilitation40,00040,00040,000040,000040,00040,00040,00040,00040,00040,00040,000240,000
M/P G-4 (1)Hanley Drive Sewer Manholes40,00020,00020,000020,000020,00020,00020,000----40,000
M/P T-5 (1)Outfall Pipeline Improvements120,000000000----120,000-120,000
M/P P-6 (2)Riverside Lift Station Improvements250,00000000050,000200,000----250,000On list. Higher Priority Within next three years. Eng. Year 1. Install in year 2. MP $326k
Actuator Air Valve (Spare)8,0008,0008,0005,0722,9282,9280------0
Sequence Batch Reactor Waste Pump WWTP12,00012,00012,0005,6396,3616,3610------0
Multi-VFD Upgrades50,00025,00025,000025,00025,000025,000-----25,000
M/P T-12 (2)UV Disinfection Control Upgrades85,00030,00030,000030,000030,00085,000-----85,000Moved to higher priority.
M/P G-1 (1)Sewer Line from King Street to 3rd Street (Manhole D-220 to Manhole D-270)140,000000000----140,000-140,000King St & 3rd. Cure pipe in place. Revised M/P Priority.
M/P G-5 (1)Wastewater Collection System Design Standards5,0005,0005,0008,365000------0
M/P P-3 (1)Quiet Water Lift Station Improvements493,000000000-50,000250,000193,000--493,0005-10 Years Out. QW Pump Station is functioning well. Demand is stable. PW recommends review at 5 years - rehab vs. new installation.
M/P T-2 (1)SBR and Digester Diffuser Membrane Replacement15,000000000-----15,00015,000at 10 years. Just completed at MP.
M/P T-7 (2)New Biosolids Disposal Site Acquisition50,000000000-----50,00050,000Actively looking. Keep in year 1 as priority. Current removal costs are high. Landfill more expensive. Long term need a place to put biosolids.
M/P G-2 (1)Mainline A Manhole between A-040 to A-050141,000000000-----141,000141,000Not underperforming. Upgrade when expansion at Adobe Expansion occurs. Easement for properties south of Adobe.
M/P G-3 (1)Mainline D Manhole D-010 to D-030, Ocean View Drive263,000----------263,000-263,000Calculation issue. Is a 10" s/b 12" Currently performing for demand. 5-10 years out.
M/P P-5 (2)Parkside Lift Station Improvements218,000-----------218,000218,0005-10 years out. 'Current performance is acceptable. Pump plugs repair/upgrade to improve perf.
M/P P-7 (2)Pontiac Lift Station Improvements218,000-----------218,000218,0005-10 years out. 'Current performance is acceptable. Pump plugs repair/upgrade to improve perf.
M/P F-1 (2)Pontiac Lift Station Force Main Improvements121,000-----------121,000121,0005-10 years out. 'Current performance is acceptable. Pump plugs repair/upgrade to improve perf.
M/P T-6 (2)Biosolids Drying Beds158,000-----------158,000158,000PW is not hauling biosolids to dump. Drying Beds purchase contingent on land purchase.
M/P T-8 (2)Biosolids Manure Spreader100,000-----------100,000100,000Contingent on land purchase
M/P T-9 (2)Aerobic Digester and Sludge Storage Tank Air Supply System Imps.223,000-----------223,000223,0005-10 years out. Improvement will occur w/Air Valve Replacement, SCADA controls updates.
M/P T-10 (2)Aerobic Digester Tank Coating and Piping Improvements330,000-----------330,000330,0005-10 years out. Improvement anticipated with installed new lining.
M/P T-11 (2)SBR, EQ Basin, & Digester Control System Upgrades972,000-----------972,000972,00015-20 year plan
M/P T-13 (2)SBR Basin #31,236,000----------1,236,0001,236,000Expansion of SBR contingent on demand increasing. Currently at 30%. Potentially partner further North.
WWPRTGENPortable generator00044,122000------0
PWRLUPDRM/P T-4 (1)PW Rehab - Rollup Doors140,000140,000140,00066,91373,08773,0870-----0PW Bldg: Headworks Shelter, Solids Handling Building Rehab. Complete in phases.Siding 2.5" insulated panel. $700,000.
M/P T-4 (1)PW Rehab - Roofing200,000-00000--100,000100,000--200,000
M/P T-4 (1)PW Rehab Exterior Panels350,000-00000--100,000250,000--350,000
M/P T-4 (1)Shop Lighting Update10,00010,00010,00016,290000------0
Man Doors PW Bldg #215,00015,00015,000015,000015,00015,000-----15,000Fire Chief requested rated doors
WWELECGTM/P T-4 (1)Public Works Slide Gate25,00020,00020,000020,000020,00025,000-----25,000
GIS Mapping & Geolocation Utility Line Hardware25,00025,00025,000025,000025,00025,000-----25,000Utility Line / GIS Geolocates
2ND PH3 Loma to River Rd Wasteline Engineering10,00010,000-----10,000Engineering 45k, 15k water, 10k wastewater, 20k streets storms
E2PHS3WW2ND PH3 Loma to River Rd Wasteline Construction50,00000000050,000-----50,000
PW Fuel Tank & Trailer15,00015,00015,000
Wastewater Treatment Plant Upgrades240,000248,000248,000WWTP Generator Rehab, Heat Pump Rehab, PLC Upgrades, Conduit Rehab
Wastewater Unplanned / Contingency25,00025,0002,37522,62525,00025,00025,00025,00025,00025,000150,000
TOTAL WWTP7,144,000690,000690,000180,938562,839196,214344,0001,099,000501,000515,000608,000588,0003,847,0007,158,000CHECK SUM
TOTAL ENTERPRISE BEFORE CAPITALIZED LABOR27,178,3751,746,4191,746,419581,9481,224,648339,979842,1312,153,0001,343,0001,526,0001,034,000783,00020,902,00027,741,00027,741,000
GENERAL FUNDSTREETS
EAST 2nd Street PH 2 - Prospect to Loma 540'Grant Funding.Pending current FY install.
E2PHS2STProspect-Loma Sitework & General Construction152,000132,281132,281283,819000------0Bids complete
EAST 2nd Street PH 3 - Loma to River Rd 560'Grant Funding.Pending current FY install.
Loma to River Rd General Engineering13,00013,00013,000013,000013,00020,000-----20,000Year 2 Engineering
E2PHS3STLoma to River Rd General Construction187,000---180,000----180,000
STREET PROJECTS
GIMLETGTGimlet Gates70,00035,00035,000035,000035,00035,000-----35,000
OCEANVIEOceanview Drive50,000-----------50,00050,000Hold pending Road Transfer from LC
Hwy 101 Curve Delineators**40,00040,00040,0004,02735,97397335,00035,000-----35,000Delineator. Agreement with ODOT.
Street Repairs100,000100,000100,000100,000100,000100,000100,000600,000
MARINESDRMarine/101 Storm Drain60,000-------60,000---60,000120,000On taking ownership Ocean View/Marine; Locate Utilities
TOTAL GENERAL STREETS BEFORE CAPITALIZED LABOR672,000220,281220,281287,84683,97397383,000190,000340,000100,000100,000100,000210,0001,040,000
GENERAL FUNDSTORM DRAINS
E2PHS2DRProspect-Loma Storm Drains40,00030,34930,34912,39517,95400------0Complete
STDRMPLNStormwater Masterplan29,02229,02229,02233,000000------0
TOTAL STORMS BEFORE CAPITALIZED LABOR
69,02259,37159,37145,39517,954000000000
GENERAL FUNDCITY HALL
EMRGMNGTConex installation3,00020,00020,000020,000020,000------0
Emergency Preparedness20,00020,00020,00020,00020,00020,00020,000120,000
501 Gutters and Fascia, Building Repair20,00020,00020,0006,48613,51413,514020,000-----20,000
Exterior Rehabilitation; ADA Compliant/Code & Safety Review60,00060,00060,000120,000
Interior Security Remodel90,00030,00060,00090,000
Fake Police Car5,0005,0005,000
Security Upgrade10,00010,00010,0005,0644,93604,93620,000-----20,000Security Upgrade/Entry and Counters
TOTAL BEFORE CAPITALIZED LABOR208,00050,00050,00011,55038,45013,51424,936155,000140,00020,00020,00020,00020,000375,000
GENERAL FUNDPARKS & TRAILS
BOARDWLKBayside Boardwalk Engineering125,00050,00050,0001,85648,14448,144060,000----60,000Preliminary Engineering in 2021-2. CivilWest - Tim Gross. $6547 in previous fiscal year.
BOARDWLKExtension of Walkway to State Park750,000-00000--350,000400,000-750,000
BOARDWLKGateway Overlook and Improvements450,000-00000-350,000100,000-450,000
BOARDWLKBoardwalk Construction875,000-00000125,000500,000250,000---875,000Based On CivilWest Estimate
BOARDWLKUnderground Utilities200,000-00000-200,000----200,000
SKATEPKSkate Park Improvements25,00010,00030,990106,725000---0--0Being reimbursed by grants obtained by Polly Plumb Productions
TOTAL BEFORE CAPITALIZED LABOR2,425,00060,00080,990108,58148,14448,1440185,0001,050,000700,000400,000002,335,000
GENERAL FUNDCOMMONS
Gutters and Fascia and Roof Repair50,00035,00067,00057,7009,30009,30020,00025,000----45,000See CivilWest Review
M/E/P Updates25,00025,00025,00016,7598,24108,24120,000-----20,000Spending was coded as operations but is being changed
Fire & Safety Updates; Egress, Hardware and Lighting25,00025,00025,000025,000025,00020,000-----20,000Missing Fire Exit Lighting, Compliant Egress Pushbars, ADA Compliant Door Hardware. Building Code Updates.
Security Updates10,00010,00010,0005,9874,0134,01305,000-----5,000Door Access Hardware, Security Video Cameras
COMMSDLTSound / Lighting Updates25,00025,00025,0006,15818,842018,84220,000-----20,000Some spending was coded as operations but is being changed
Generator Rehousing and Relocation - Resiliency Measure15,00015,00015,000015,000015,00015,000-----15,000
Interior Remodel to Accommodate Childcare Facilities / Secure Area80,00080,00030,0004,96025,0405,04020,00015,000-----15,000
Brush Box Fence20,00014,5315,46900------Brush Box fence completed
Electronic Readerboard Sign30,000030,00030,0000-
Park Plan / Civic Plan / Masterplan-30,00030,000030,000030,000120,000-----120,000Masterplan.
Masterplan Project Implementations470,000000000-50,000150,000150,000150,000-500,000
Resiliency - Solar Energy175,00000000050,000100,00025,000175,000
Public Restroom150,000000000-25,000125,000150,000
COMMSTNEStairs NE Entrance30,0005,000025,00025,000
Commons NE Entrance105,000000000-25,00080,000105,000
Pavilion Upgrades40,00000000035,00035,000
Commons Storage Improvements14,50000000014,50014,500
TOTAL BEFORE CAPITALIZED LABOR1,214,500245,000277,000106,095170,90544,053126,383359,500225,000380,000150,000150,00001,264,500
GENERAL FUNDLIBRARY
LIBRYEXPLibrary Interior Design (Pellitier & Pellitier)06,226------0
LIBRYEXPLibrary Grant Writer6,0006,0006,0006,0006,000------0
LIBRYEXPLibrary Project Preparation/Storage3,0003,0003,0004002,6000------0
LIBRYEXPLibrary Architectural Design (M D Arch)32,0006,0006,00017,874000------0
LIBRYEXPLibrary Preconstruction, Permitting Fees and Prep5,0007,0007,00007,0000------0
LIBRYEXPLibrary Rehabilitation and Addition600,000236,000190,5100190,5100190,510------0
Website and Branding10,00010,000-----10,000
Evaluate Suitability of Site35,00035,000-----35,000
Preconstruction and Construction1,150,000550,000600,000----1,150,000
Site Preconstruction - Helical Piers85,000-85,000----85,000
Site Preconstruction - Soilwork Drainage45,000-45,000----45,000
Re-Engineer Design30,000-30,000----30,000
Interior Finishing100,000--100,000---100,000
Final Landscaping55,000--55,000---55,000
TOTAL BEFORE CAPITALIZED LABOR2,156,000258,000212,51024,500206,1100196,510595,000760,000155,0000001,510,000
GENERAL FUNDLLCM
LLCMRENOLLCM Rehabilitation500,000154,000154,0004,247149,75349,753100,000100,000100,000----200,000
TOTAL BEFORE CAPITALIZED LABOR500,000154,000154,0004,247149,75349,753100,000100,000100,0000000200,000
ENTERPRISE FUNDS TOTAL27,178,3751,746,4191,746,419581,9481,224,648339,979842,1312,153,0001,343,0001,526,0001,034,000783,00020,902,00027,741,000
GENERAL FUNDS TOTAL7,175,5001,046,6521,054,152588,214715,289156,437530,8291,584,5002,615,0001,355,000670,000270,000230,0006,724,500
GRAND TOTAL34,353,8752,793,0712,800,5711,170,1621,939,937496,4161,372,9603,737,5003,958,0002,881,0001,704,0001,053,00021,132,00034,465,500
7,500
NOTES:
* $100,000 approved Grant

File details come from the government source that posted it. Updated .