This is a set of construction plans and specifications issued for bid by the City of Thousand Oaks, California for the installation of electric vehicle charging infrastructure at the Hill Canyon Wastewater Treatment Plant. The scope of work includes installation of six single-port Level 2 EV chargers (Lite-On IC80A model, 80A, 19.2KW at 240V) with associated electrical distribution, power infrastructure, and civil site work. The project requires installation of a 50KVA transformer (480-120/240V, 1-phase, 3-wire), a new 200A panelboard (EV1), circuit breakers, underground and aboveground conduits, communication cables (CAT6), wheel stops, concrete foundation pads, and future-use conduits. The work encompasses trenching with minimum 24-inch burial depth for conduits, installation of metallic warning tape, and site restoration. Specific equipment includes six 100A circuit breakers at the new EV1 panel, one 125A circuit breaker at the existing MCC-9 panel, and communications infrastructure using both cellular network and daisy-chained Ethernet cables for load management. The chargers are designated for fleet vehicles only and are not available for public use.
The project must comply with the 2025 California Electrical Code, 2025 California Building Code, 2025 California Fire Code, and applicable City of Thousand Oaks codes and ordinances. All work and materials must be new unless otherwise specified and furnished by the contractor. The contractor must possess a valid Class A General Engineering License and maintain a clean worksite throughout construction. Contractor responsibilities include field verification of existing conditions, notification to the Underground Service Alert at least two working days prior to excavation, proper de-watering and compaction procedures, and concrete work meeting 4,000 PSI compressive strength specifications. The project location is at the Hill Canyon Wastewater Treatment Plant (APN: 552013001), 9600 Santa Rosa Road, Camarillo, California 93012, with conduit trenching within pavement areas to follow City of Thousand Oaks Plate 8-14 specifications. All electrical work must follow manufacturer installation instructions, and any deviations require written approval from the City Engineer. The document was issued for bid on April 7, 2026 and reviewed on April 20, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF THOUSAND OAKS DWG. _________
CITY OF THOUSAND OAKSCITY OF THOUSAND OAKS
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
26-05A
ISSUED FOR BID
SHEET INDEX
SHT. NO. DESCRIPTION
VICINITY MAP
NO SCALE
PUBLIC WORKS DEPARTMENT
101 FREEW
AY
FR
EEW
A Y
F R
E E
W A
Y
R D
RD.
R D
W
ES
TL
AK
E
RD.
OAKS
OLS
EN
RD.
E R
B E S
M O
O R
P A
R K
BLVD.
LYNN
RD.
LYN
N
HILLCREST
DR.
HILLCREST
D R
THOUSAND
BLVD.
BORCHARD
RD.
R
AN
C H
O
C O
N E J
O B
L V
D
KANAN
R D
J A
N S S
ARBOLES
AVENIDA
DE
LOS
R E
IN
O
R D
W E
N D
Y D
R
POTRERO
RD.
TITLE SHEET
PROJECT SITE
NO SCALE
SITE MAP
SINGLE LINE DIAGRAM AND PANEL SCHEDULE
GENERAL NOTES
7 CUTSHEET
CITY COUNCIL
CITY ENGINEER
PUBLIC WORKS DIRECTOR
CITY MANAGER
ANDREW P. POWERS
AL ADAM
C. TIE GUTIERREZ
BOB ENGLER
NADER HEYDARI
TED GERBER
PUBLIC UTILITIES WITHIN CITY OF THOUSAND OAKS
WATER:
WASTEWATER:
TELEPHONE:
GAS:
CABLE TV:
FIBER:
ELECTRICITY:
805- 432-5750
EMANUAL BARAJAS
NEWBURY PARK, CA 91320
2439 W HILLCREST DRIVE
CALIFORNIA AMERICAN WATER
805-449-5033
PATRICK McCULLOCH
THOUSAND OAKS, CA 91362
2100 EAST THOUSAND OAKS BOULEVARD
CITY OF THOUSAND OAKS
805-445-9116
CAMARILLO, CA 93012
201 FLYNN ROAD
JASON EISEL
FRONTIER
213-231-5629
BEN PENA
SIMI VALLEY, CA 93065
977 CHAMBERS LANE
SOUTHERN CALIFORNIA GAS COMPANY
805-494-7013
BOB MIGLIORE
THOUSAND OAKS, CA 91361
3589 FOOTHILL DRIVE
SOUTHERN CALIFORNIA EDISON COMPANY
800-654-3110
FIBER DIG
CANONSBURG, PA 15317
1500 CORPORATE DRIVE
CROWN CASTLE FIBER
805-626-8231
ERIC PINGREE
VENTURA, CA 93003
2525 KNOLL DRIVE
SPECTRUM
NOTICE TO CONTRACTOR:
NOTICE TO CONTRACTOR:
CONTRACTOR SHALL POSSES A VALID CLASS "A" GENERAL ENGINEERING LICENSE
LESS THAN TWO DAYS NOR MORE THAN SEVEN DAYS PRIOR TO CONSTRUCTION.
UNDERGROUND ALERT FOR LOCATION OF EXISTING UNDERGROUND UTILITIES NO
IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO CALL THE USA
TO EXISTING UTILITIES DURING CONSTRUCTION
THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ANY DAMAGE DONE
SITE PLAN
CONDUIT PLAN
SECTIONS AND DETAILS
N O
R T
H F
O R
K A
R R
O Y
O C
O N
E J O
H
IL
L C
A N
Y O
N F
IR
E R
O A D
W
IL
D W
O O
D C
A N
Y O
N T
R A
IL
L
IZ
A R
D R
O C
K T
R A
IL
8 STRUCTURAL DETAILS
CI 5709
HCTP LEVEL 2 EVSE PROJECT
SITE
PROJECT
MIKE TAYLOR, MAYOR
DAVID NEWMAN
SHEET 1 OF 8
TITLE SHEET
Clark Stanphill 04/07/2026
4/20/2026
04-21-2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
26-05A
ISSUED FOR BID
AREA
PROJECT
PROJECT AREA PROJECT DESCRIPTION PROPOSED EV CHARGERS
GENERAL NOTESPROPERTY INFORMATION
VICINITY MAP CODES AND STANDARDS
GENERAL
MATERIALS AND EQUIPMENT
INSTALLATION
CONDUIT
DAMAGING ANY UTILITY LINE.
INSTALLATION OF THE ELECTRICAL EQUIPMENT TO AVOID
HAND DIG ALL UTILITIES IN CLOSE PROXIMITY TO THE 29.
NATIVE BACKFILL OR 2-SACK SLURRY.
BACKFILL WITH 95% MINIMUM RELATIVE COMPACTED 28.
CONDUIT.
INSTALL METALLIC WARNING TAPE MINIMUM 12” ABOVE 27.
INSTALLATIONS AND RATED FOR 90°C CONDUCTORS.
UNLESS OTHERWISE NOTED, LISTED FOR UNDERGROUND
UNDERGROUND CONDUITS SHALL BE PVC SCHEDULE 40, 26.
CONDUIT BURIAL DEPTH SHALL BE 24”.
REQUIREMENTS PURSUANT TO CEC 300.5. MINIMUM
TRENCHING SHALL COMPLY WITH MINIMUM COVER 25.
ANY EXCAVATION.
ALERT (USA) TWO (2) WORKING DAYS PRIOR TO BEGINNING
CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE 24.
TRENCHING
AREA
PROJECT
TANK
TANK
TANK
TANK
TANK
TANK
TANK
TANKS
TANKS
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
PIPES
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
SHADOW
SHADOW
SHADOW
SHADOW
SHADOW
SHADOW
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
DENSE
TREES
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
DENSE
BRUSH
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH BRUSH
BRUSH
ROCKS
ROCKS
ROCKS
ROCKS
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
ASPH
DIRT
DIRT
DIRT
DIRT
DENSE
DENSE
TREES
BRUSH
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
ROCKS
ROCKS
ROCKS
ROCKS
ROCKS
ROCKS
TANK
TANK
TANK
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
BRUSH
SHADOW
SHADOW
SHADOW
SHADOW
SHADOW
SHADOW
SHADOW
CONC
CONC
ASPH
ASPH
ASPH
ASPH
ROCKS
DENSE
BRUSH
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
DENSE
TREES
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
BRUSH
BRUSH
BRUSH
DENSE
TREES
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
TREES
DENSE
BRUSH
DENSE
BRUSH
DENSE
BRUSH
DENSE
DENSE
BRUSH
ASPH
BRUSH
BRUSH
DISTRIBUTION AND BRANCH CIRCUITRY SYSTEM.
SHALL NOT EXCEED 5% WITHIN THE ENTIRE ELECTRICAL
BUILDING CODE. THE MAXIMUM FEEDER VOLTAGE DROP
VOLTAGE DROP MUST COMPLY WITH 2025 CEC AND LOCAL 23.
NOTED.
ALL CABLES SHALL BE THWN-2 90°C, UNLESS OTHERWISE 22.
NOTED.
BASED ON “THWN-2” COPPER CABLES, UNLESS OTHERWISE
ALL CONDUIT SIZES AND CONDUCTOR AMPACITIES ARE 21.
ALL NEW STUB CONDUITS SHALL HAVE BUSHING ON END.20.
CABLES.
NECESSARY TO FACILITATE PULLING AND INSTALLATION OF
INSTALL CONDULETS AND INTERMEDIATE PULLBOXES AS 19.
NOT SUBJECT TO PHYSICAL DAMAGE.
EMT CONDUITS ALLOWED FOR ALL OTHER EXPOSED AREAS
AREAS SUBJECT TO PHYSICAL DAMAGE, SHALL BE GRC.
EXPOSED CONDUITS ALONG FLOOR SURFACE, OR ANY 18.
INSTALLED BY THE CITY.
STRIPPING AND ADA SIGNAGES SHALL BE PROVIDED AND 17.
COORDINATED BETWEEN CONTRACTOR AND OWNER.
FINAL LOCATIONS OF EV CHARGERS SHALL BE
EV CHARGER LOCATIONS ARE SHOWN FOR REFERENCE. 16.
250.4.
ENCLOSURES, AND RACEWAYS IN ACCORDANCE WITH NEC
NON-CURRENT CARRYING CONDUCTIVE MATERIALS,
GROUND AND BOND ELECTRICAL SYSTEMS AND 15.
INSTALLED IN ACCORDANCE WITH NEC 240.
OVERCURRENT PROTECTION EQUIPMENT SHALL BE 14.
CALIFORNIA ELECTRICAL CODE.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH 2025 13.
INSTALLATION INSTRUCTIONS.
INSTALLED IN ACCORDANCE WITH MANUFACTURER’S
ELECTRIC VEHICLE CHARGING SYSTEM SHALL BE 12.
APN: 552013001
CAMARILLO, CA 93012
9600 SANTA ROSA RD
HILL CANYON WASTEWATER TREATMENT PLANT ADDRESS:
CITY OF THOUSAND OAKS MUNICIPAL CODE
COMPLY WITH SECTION 11B-228.3.2.
BY A DESIGNATED VEHICLE OR DRIVER SHALL NOT BE REQUIRED TO
EVCS NOT AVAILABLE TO THE GENERAL PUBLIC AND INTENDED FOR USE
CBC 11B-228.3.2. EXPECTION 1:
2023 NFPA 70 NATIONAL ELECTRIC CODE
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE PART 11
2025 CALIFORNIA FIRE CODE PART 9
2025 CALIFORNIA ELECTRICAL CODE (CEC) PART 3
2025 CALIFORNIA BUILDING CODE (CBC) PART 2
2025 BUILDING STANDARDS ADMINISTRATIVE CODE PART 1
CALIFORNIA CODE OF REGULATIONS, TITLE 24:
ORDERING ANY MATERIALS OR EQUIPMENT.
CONTRACTOR SHALL PROVIDE SUBMITTALS BEFORE 11.
OCCUPATIONAL SAFETY HEALTH ADMINISTRATION (OSHA).
LABORATORY (NRTL) ACCREDITED BY THE UNITED STATES
OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING
ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, 10.
OTHERWISE NOTED.
AND FURNISHED AND INSTALLED BY CONTRACTOR UNLESS
ALL WORK/MATERIALS SHOWN ON PLANS SHALL BE NEW 9.
CONTRACTOR SHALL MAINTAIN A CLEAN WORKSITE.8.
CONSTRUCTION.
STRUCTURES DAMAGED BY THE CONTRACTOR DURING
ATCONTRACTOR’S EXPENSE, ANY EQUIPMENT OR
CONTRACTOR SHALL REPAIR AND/OR REPLACE, 7.
JURISDICTION FOR ANY INSPECTIONS.
CONTRACTOR SHALL NOTIFY AUTHORITY HAVING 6.
ORDINANCES, AND REQUIREMENTS.
COMPLETED IN ACCORDANCE WITH APPLICABLE CODES,
CONTRACTOR SHALL ENSURE THAT ALL WORK IS 5.
PERMIT HAS BEEN ISSUED.
NOT AUTHORIZE ANY WORK TO BE PERFORMED UNTIL A
APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES 4.
IMPROVEMENTS.
PRIOR TO CONSTRUCTION OF THE PROPOSED
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS 3.
FOR THE FLITTING OF ALL EQUIPMENT AND MATERIALS.
CLEARANCES AND SHALL ASSUME FULL RESPONSIBILITY
AND VERIFY ALL DIMENSIONS, SIZES, AND REQUIRED
APPROXIMATE. CONTRACTOR SHALL CAREFULLY CHECK
ALL EQUIPMENT LOCATIONS ON DRAWINGS ARE 2.
REGULATIONS AND/OR BUILDING CODES.
CONTRACTOR FROM COMPLYING WITH THE LAWS,
AND/OR DESIGN INFORMATION THAT PREVENTS
THE DRAWINGS, SPECIFICATIONS, AND FIELD CONDITIONS;
ENGINEER OF RECORD OF ANY DISCREPANCIES BETWEEN
CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND 1.
EV CHARGERS ARE FOR DESIGNATED FLEET VEHICLES ONLY AND ARE NOT FOR PUBLIC USE.
INSTALL SIXTEEN (16) WHEEL STOPS PER PLAN.9.
INSTALL FUTURE POWER AND COMMUNICATION CONDUITS.8.
INSTALL, TEST & COMMISSION EVSES PER MANUFACTURER INSTRUCTIONS. 7.
INSTALL COMMUNICATION CONDUITS AND CAT6 CABLE BETWEEN EVSES.6.
FROM XFMR 'EV' TO PANELBOARD 'EV1', AND FROM PANELBOARD 'EV1' TO EVSES.
INSTALL POWER CABLES AND CONDUITS FROM EXISTING MCC-9 TO XFMR 'EV', 5.
INSTALL XFMR 'EV' 50KVA, 480-120/240V, 1PH, 3W.4.
INSTALL PANEL 'EV1' 120/240V, 1PH, 3W, 200A.3.
INSTALL SIX (6) 100A CIRCUIT BREAKERS AT NEW 200A 'EV1 'PANEL.2.
INSTALL ONE (1) 125A CIRCUIT BREAKER AT EXISTING MCC-9.1.
SCOPE OF WORK INCLUDES:
INSTALL SIX (6) SINGLE PORT LEVEL 2 EV CHARGERS AND ASSOCIATED MATERIALS.
SHEET 2 OF 8
GENERAL NOTES
Clark Stanphill 04/07/2026
BY OTHERS.
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
26-05A
ISSUED FOR BID
200A, 10KAIC, NEMA 3R
120/240VAC, 1PH, 3W
PANELBOARD "EV1"
EVSE EVSE EVSE EVSE EVSE EVSE
1PH, 3W
480-120/240V
XFMR 'EV' 50KVA
2P
125A
EVSE COMMS CAT6 S/FTP CMX.4.
2#2 + 1#8 GND.3.
3#4/0 + 1#2 GND.2.
2#1/0 + 1#6 GND.1.
CABLES
2P
200A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
PADLOCKING HANDLE LOCK.
EVSE CIRCUIT BREAKER SHALL BE INSTALLED WITH
EXISTING MCC-9, 480V, 3PH, 4W, INDOOR 4.
XFMR 'EV', 480-120/240V, 50KVA, 1PH, 3W, NEMA 3R.3.
HANDLE LOCK. SEE SHEET 6 DETAIL 1.
BREAKERS SHALL BE INSTALLED WITH PADLOCKING
MOUNT WITH UNISTRUT. NEW EVSE CIRCUIT
PANEL 'EV1' 240/120V, 1PH, 3W, 200A, SURFACE 2.
W/ CABLE MANAGEMENT SYSTEM, LOAD MANAGED.
SINGLE PORT, PEDESTAL MOUNT, 25FT CABLE
EVSE, LITE-ON IC80A, 80A, 19.2KW, @240V,1.
EQUIPMENT
ENSURE COMPATIBILITY.
PER MANUFACTURER'S INSTRUCTIONS TO
INSTALL AND CONFIGURE LITE-ON EVSE
IMPLEMENT EV GATEWAY LOAD MANAGEMENT. 4.
DAISY CHAINED ETHERNET CABLES.
CARD. REMAINING EVSES COMMUNICATE VIA
VIA CELLULAR NETWORK USING BUILT-IN SIM
THE FIRST EVSE SHALL ACCESS THE INTERNET 3.
THHN/THWN-2 OR XHHW-2.
ALL WIRING SHALL BE COPPER (CU), TYPE 2.
(CEC) AND APPLICABLE LOCAL CODES.
EDITION OF THE CALIFORNIA ELECTRICAL CODE
ALL WORK SHALL CONFORM TO THE LATEST 1.
GENERAL NOTES :
3W, 42KAIC
600A, 480V, 3PH
MCC-9-1
TO LC7/SWBD-3
ROOM
TO ELECTRICAL
SPD
SHEET 3 OF 8
SINGLE LINE DIAGRAM AND PANEL SCHEDULE
Clark Stanphill 04/07/2026
INSTALLED BY OTHERS.
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
26-05A
ISSUED FOR BID
(E) STRIPING
(E) LIGHT POLE
9'-0"
18'-0"
EV EV EV EV EV EV
WHEELSTOP 6' X 6" X 4".5.
NEMA 3R.
COMM PULL BOX FLOOR MOUNTED, 10"x10"x6" 4.
NEMA 3R.
XFMR 'EV' 480-120/240V, 50KVA, 1PH, 3W, 3.
DETAIL 1.
PADLOCKING HANDLE LOCK. SEE SHEET 6
BREAKERS SHALL BE INSTALLED WITH
MOUNT WITH UNISTRUT. NEW EVSE CIRCUIT
PANEL 'EV1' 240/120V, 1PH, 3W, 200A, SURFACE 2.
MANAGED.
W/ CABLE MANAGEMENT SYSTEM, LOAD
SINGLE PORT, PEDESTAL MOUNT, 25FT CABLE
EVSE, LITE-ON IC80A, 80A, 19.2KW, @240V,1.
EQUIPMENT
SHEET 4 OF 8
SITE PLAN
Clark Stanphill 04/07/2026
INSTALLED BY OTHERS.
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
26-05A
ISSUED FOR BID
(3) 1.5"C PWR
(1) 0.5"C COMM
(1) 1.5"C PWR
(E) LIGHT POLE
(1) 0.5"C COMM
(2) 1.5"C PWR
(1) 0.5"C COMM
(1) 0.5"C COMM
(1) 0.5"C COMM
(1) 1.5"C PWR
(1) 0.5"C COMM
(3) 1.5"C PWR
(1) 0.5"C COMM
(2) 1.5"C PWR
(1) 0.5"C COMM
(1) 1.5"C PWR
(1) 0.5"C COMM
(1) 1.5"C PWR
CONDUIT AS “FUTURE USE”.
CONCRETE, AND DEBRIS. CLEARLY LABEL EACH
ENDS WATERTIGHT TO PREVENT ENTRY OF WATER,
PULL STRING AND END CAPS. SEAL/TAPE ALL OPEN
PROVIDE FUTURE-USE CONDUITS COMPLETE WITH 4.
ZONES AND POLE FOUNDATIONS.
TO AVOID CONFLICTS AND DAMAGE TO ROOT
TREES, AND LIGHT POLES. ROUTE CONDUITS
FIELD VERIFY AND PROTECT EXISTING UTILITIES,3.
ELECTRICAL ROOM EQUIPMENT.
COORDINATE EXACT ENTRY ELEVATION WITH
ENTER ELECTRICAL ROOM THROUGH WALL.
1.5"C PWR AND 0.5"C COMM CONDUIT STUB UP AND 2.
(1) 0.5″C FROM COMM PB TO EVSE .1.
NOTES
WHEELSTOP 6' X 6" X 4".5.
NEMA 3R.
COMM PULL BOX FLOOR MOUNTED, 10"x10"x6" 4.
NEMA 3R.
XFMR 'EV' 480-120/240V, 50KVA, 1PH, 3W, 3.
DETAIL 1.
PADLOCKING HANDLE LOCK. SEE SHEET 6
BREAKERS SHALL BE INSTALLED WITH
MOUNT WITH UNISTRUT. NEW EVSE CIRCUIT
PANEL 'EV1' 240/120V, 1PH, 3W, 200A, SURFACE 2.
MANAGED.
W/ CABLE MANAGEMENT SYSTEM, LOAD
SINGLE PORT, PEDESTAL MOUNT, 25FT CABLE
EVSE, LITE-ON IC80A, 80A, 19.2KW, @240V,1.
EQUIPMENT
SHEET 5 OF 8
CONDUIT PLAN
Clark Stanphill 04/07/2026
INSTALLED BY OTHERS.
NOTE.
* CONDUIT TRENCHING WITHIN PAVEMENT AREA
SHALL BE PER CITY OF THOUSAND OAKS PLATE 8-14.
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
26-05A
ISSUED FOR BID
PLAN VIEW
1.5' X 1.5' X 1', 4000 PSI
CONCRETE FOUNDATION
2 3
M
IN
1.5"C PWR
0.5"C COMM
1.5"C PWR
SECTION VIEW
DETAIL 1
LITE-ON IC80A EVSE, PANELBOARD 'EV1', XFMR 'EV' | PLAN & SECTION VIEW
5'-2"
NOTE:
SECTION VIEW
DETAIL1
2.5"C PWR FLEX CONDUIT
0.5"C COMM
0.5"C COMM
WHEELSTOP 6' X 6" X 4".5.
NEMA 3R.
COMM PULL BOX FLOOR MOUNTED, 10"x10"x6" 4.
XFMR 'EV' 480-120/240V, 50KVA, NEMA 3R.3.
PADLOCKING HANDLE LOCK.
BREAKERS SHALL BE INSTALLED WITH
MOUNT WITH UNISTRUT. NEW EVSE CIRCUIT
PANEL 'EV1' 240/120V, 1PH, 3W, 200A, SURFACE 2.
MANAGED.
W/ CABLE MANAGEMENT SYSTEM, LOAD
SINGLE PORT, PEDESTAL MOUNT, 25FT CABLE
EVSE, LITE-ON IC80A, 80A, 19.2KW, @240V,1.
EQUIPMENT
SHEET 6 OF 8
SECTIONS AND DETAILS
CONTRACTOR SHALL INSTALL CONCRETE FOOTINGS AND PEDESTAL MOUNTS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THIS INCLUDES, BUT IS NOT LIMITED TO: ANCHORING REQUIREMENTS, CLEARANCES, CONDUIT ENTRY LOCATION, VENTILATION, ENVIRONMENTAL PROTECTION, AND TORQUE SPECIFICATIONS. ANY DEVIATION FROM THE MANUFACTURER'S INSTRUCTIONS SHALL REQUIRE WRITTEN APPROVAL FROM THE ENGINEER PRIOR TO INSTALLATION
EV CHARGERS TO BE MOUNTED BY OTHERS.
Clark Stanphill 04/07/2026
INSTALLED BY OTHERS.
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
26-05A
ISSUED FOR BID
1LITE-ON IC80A EV CHARGER | DATASHEET 2LITE-ON IC80A EV CHARGER PEDESTAL | DATASHEET
SHEET 7 OF 8
CUTSHEET
Clark Stanphill 04/07/2026
INSTALLED BY OTHERS
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
Know what'sbelow.
Callbefore you dig.
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
04/07/26
04/07/26
04/07/26
04/07/26
TED GERBER, CITY ENGINEER
CI 5709 HCTP LEVEL 2 EVSE PROJECT
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
No. C79923
LIVIC
26-05A
ISSUED FOR BID
SECTION VIEW
PLAN VIEW
FINISHED GRADE
1 3PEDESTAL BASE
EV CHARGER PEDESTAL
4x
1.5' X 1.5' X 1', 4000PSI
CONCRETE FOUNDATION
SECTION VIEW
PLAN VIEW
PANEL BOARD UNISTRUT
TRANSFORMER 'EV'
1'-6"
3.00
10.00
8.00
.0
.0
.0
5'-2"
SHOWN IN APPROVED DETAILS.
PROVIDE MINIMUM EMBEDMENT OF ANCHORS AS 3.
AND PER MANUFACTURER'S RECOMMENDATIONS.
INSTALLED IN ACCORDANCE WITH EVALUATION REPORT
ANCHORS INSTALLED INTO CONCRETE SHALL BE 2.
LOCATIONS PRIOR TO INSTALLING.
FIELD VERIFY AND MEASURE EXACT ANCHOR 1.
ANCHORS
PROVIDE SLIP RESISTANCE.
PEDESTRIAN SHALL HAVE HEAVY BROOM FINISH TO
SMOOTH TROWEL FINISH. CONCRETE SLAB FOR
CONCRETE SLAB FOR EQUIPMENT SHALL HAVE A 7.
115 PCF.
WEIGHT OF LIGHTWEIGHT CONCRETE NOT TO EXCEED
AGGREGATES SHALL CONFORM TO ASTM C-330. DRY
CONFORM TO ASTM C-33. LIGHT WEIGHT CONCRETE
NORMAL WEIGHT CONCRETE AGGREGATES SHALL 6.
TYPE I OR TYPE II, LOW ALKALI.
PORTLAND CEMENT SHALL CONFORM TO ASTM C-150, 5.
COMPRESSIVE STRENGTH of 4000 PSI AT 28 DAYS.
ALL STRUCTURAL CONCRETE SHALL HAVE A MINIMUM 4.
AND CONTRACT DOCUMENTS.
PLACEMENT OF CONCRETE SHALL CONFORM TO ACI 304 3.
TO C-94.
CONCRETE MIXING OPERATION, ETC., SHALL CONFORM 2.
ACI 318, WITH MODIFICATIONS AS NOTED.
CODE REQUIREMENTS FOR REINFORCED CONCRETE,
CONSTRUCTION SHALL CONFORM TO THE 'BUILDING
ALL PHASES OF WORK PERTAINING TO THE CONCRETE 1.
CONCRETE
LITE-ON IC80A EV CHARGER | TWO CHARGERS
TITEN HD SS, THDSS, ESR-2713
TITEN HD SS, THDSS, ESR-2713
TITEN HD SS, THDSS, ESR-2713
TITEN HD SS, THDSS, ESR-2713
TITEN HD SS, THDSS, ESR-2713
TITEN HD SS, THDSS, ESR-2713
#4@12" OC EW T&B
C O
V E
R C
O N
C
M
IN
C O
V E
R C
O N
C
M
IN
(f'c=4000PSI)
12" THICK CONCRETE FOUNDATION PAD
(f'c=4000PSI)
12" THICK CONCRETE FOUNDATION PAD
TABLE 1705.3 OF THE 2024 IBC.
REQUIRED IN ACCORDANCE WITH SECTION 1705.1.1 AND
INSPECTOR SHALL BE PRESENT AS OFTEN AS
FOLLOWING ESR-2713 REPORT SECTION 4.4. SPECIAL
CONTRACTOR SHALL PROVIDE SPECIAL INSPECTION 11.
CONDUIT ENTRY DIMENSIONS AND LOCATIONS.
MANUFACTURER DRAWINGS. FIELD VERIFY AND
DETAILS AND DIMENSIONS. VERIFY DIMENSIONS WITH
REFER TO EQUIPMENT MANUFACTURER DRAWINGS FOR 10.
REMOVED.
INTERFERE WITH NEW CONSTRUCTION SHALL BE
ALL ABANDONED FOOTINGS, UTILITIES, ETC., THAT 9.
DURING AND/OR AFTER CONSTRUCTION.
LOCATE AND PROTECT EXISTING UTILITIES TO REMAIN 8.
ACCORDING TO DEPTHS SHOWN ON DRAWINGS.
FOOTINGS SHALL BE PLACED AND ESTIMATED 7.
ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED.6.
COMPACTED AND LEVELED.
SOIL, MINIMUM 95% COMPACTION. BASE SHALL BE
INSTALL CRUSHED AGGREGATE BASE ON COMPACTED 5.
PLACING THE CONCRETE AND REINFORCING.
APPROVED BY THE GOVERNING AGENCY PRIOR TO
EXCAVATION AND COMPACTING IF REQUIRED SHALL BE 4.
PLACING CONCRETE.
WATER FROM FOUNDATION EXCAVATIONS PRIOR TO
OR SEEPAGE. REMOVE LOOSE SOIL AND STANDING
EXCAVATIONS FROM SURFACE WATER, GROUND WATER
CONTRACTOR SHALL PROVIDE DE-WATERING OF 3.
EXISTING CONSTRUCTION.
SHORING, UNDERPINNING AND PROTECTION OF
EXCAVATION PROCEDURES INCLUDING LAGGING,
CONTRACTOR IS SOLELY RESPONSIBLE FOR 2.
PRESSURE OF 1500PSF.
FOOTING DESIGN IS BASED ON ALLOWABLE SOIL 1.
FOUNDATIONS AND SITE WORK
WITHOUT OWNER'S REPRESENTATIVE'S APPROVAL.
CONSTRUCTION DOCUMENTS ARE NOT ALLOWED
PRODUCTS OR MATERIALS SPECIFIED ON THE
PROCEEDING WITH THE WORK. SUBSTITUTIONS OF
REPRESENTATIVE FOR REVIEW/APPROVAL BEFORE
DRAWINGS SHALL BE SUBMITTED TO THE OWNER'S
ANY DEVIATION FROM THE APPROVED SET OF 7.
WORK.
REPRESENTATIVE BEFORE PROCEEDING WITH THE
THE CONSTRUCTION DOCUMENTS WITH THE OWNER'S
THE CONTRACTOR SHALL RESOLVE ANY CONFLICTS ON 6.
SURROUNDINGS WILL IMPACT THE WORK.
TO WHICH THOSE CONDITIONS AND PHYSICAL
TO EXISTING CONDITIONS AND DETERMINE THE EXTENT
WORK. VISIT THE SITE TO RELATE THE SCOPE OF WORK
DRAWINGS TO IDENTIFY THE EXTENT OF THE SCOPE OF
CONTRACTOR SHALL CAREFULLY REVIEW THE 5.
AND OPENINGS.
MANUFACTURER EQUIPMENT DRAWINGS FOR LAYOUT
REFERENCE ELECTRICAL CONDUIT DRAWINGS AND 4.
DRAWINGS.
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED 3.
REPRESENTATIVE.
WITHOUT WRITTEN DIRECTION FROM THE OWNER'S
REPRESENTATIVE. DO NOT DEVIATE FROM THE DESIGN
CONTRACT DOCUMENTS TO THE OWNER'S
REPORT CONDITIONS THAT CONFLICT WITH THE
KNOWLEDGE, BUT WITHOUT GUARANTEE OF ACCURACY.
EXISTING CONDITIONS REPRESENTS THE PRESENT
INFORMATION SHOWN ON THE DRAWINGS RELATED TO 2.
INCONSISTENCIES.
SHALL BE NOTIFIED OF ANY DISCREPANCIES OR
CONSTRUCTION. THE OWNER'S REPRESENTATIVE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO 1.
GENERAL NOTES:
ASCE 7-22
2025 CALIFORNIA BUILDING CODE
CODE:
#4@12" OC EW T&B
PANELBOARD & TRANSFORMER
SHEET 8 OF 8
STRUCTURAL DETAILS
(TO BE SUPPLIED BY CITY)
Clark Stanphill 04/07/2026
| CI 5709 EV HCTP-260408-NoCloud |
| CI 5709 EV HCTP-260408-NoCloud |
| CI 5709 EV HCTP-260408-NoCloud |
| CI 5709 EV HCTP-260408-NoCloud |
| CI 5709 EV HCTP-260408-NoCloud |
| CI 5709 EV HCTP-260408-NoCloud |
| CI 5709 EV HCTP-260408-NoCloud |
| CI 5709 EV HCTP-260408-NoCloud |
File details come from the government source that posted it. Updated .