Chiller IFB Question and Answer B38914.docx

DOCX document 14 KB Posted

Attached to
IFB - IRCC - 60 Ton Chiller Rental - 1239 - JSW
Solicitation number
24-426DOC-ILRIV-B-38914
Issued by
Fulton County, Illinois

About this file

This document is a Question and Answer document related to an Invitation for Bid (IFB) for a 60 ton chiller rental contract issued by an Illinois state agency. The IFB requests a 60 ton chiller rental, and the questions and answers address logistics such as the availability of a forklift on-site, the need for a technician for setup and startup, and details about the electrical and water connections for the chiller. The chiller will be placed on a concrete pad, and the agency will utilize their existing house pumps rather than requiring the vendor to provide a separate pump.

The pricing terms, set asides, incumbent, funding sources, and other financial details are not provided in this document. The focus is on the technical and logistical requirements for the chiller rental.

View the file

Other files

File Type Posted
Blank IPG Active Registered Vendor Disclosure~1.docx DOCX document
Chiller IFB Question and Answer 2 B38914~1.docx DOCX document
Notice of Award Form Chiller Rental B38914~3 (1).pdf PDF
IFB Chiller Rental B38914~2.docx DOCX document
Vendor Disclosure~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chiller IFB Question and Answer B-38914

1. Do you have the forklift available on-site or would you us to arrange the forklift to offload & place the equipment on the concrete pad?

No, there is not a forklift on-site for use.

2. Do you require a technician for set up / start up & strike / off-rent?

Yes

3. Are there any space/equipment footprint restrictions we need to know about?

No Chiller:

1. Are we using the house pumps, or do you need us to provide a pump?

House pumps

2. Distance between the chiller and the Breaker/electrical supply?

Electrical service is approximately 15 feet within where the chiller will be placed.

3. What is the distance to the water connections for the supply and return hose from concrete pad placement?

Same as the electrical service.

4. Are we using the plant / system pumps or am I supplying a separate pump?

Please see answer to question one.