Chill Box Repair.doc
DOC document 28 KB Posted
- Attached to
- Walk-In Chill Box Repair
- Solicitation number
- RFQ - 18P - 09081800000000000156
- Issued by
- Penobscot County, Maine
About this file
This is a Scope of Work document for the State of Maine, specifically the Department of Corrections or related state facility located in Bangor, Penobscot County. The project involves comprehensive repair of a 200-square-foot chill box (10' X 20') at the DDPC facility located at 656 State Street. The scope requires dismantling interior stainless steel floor, wall, and ceiling panels; removing saturated insulation material; installing new blown insulation; and installing new panels with epoxy sealant sealing of all joints and seams. Work tasks include demolition and temporary protection of the space, removal and reinstallation of bumper rails and corner guards, installation of temporary suspension lighting, spray insulation application with core-bond material, framing with 1 5/8" metal studs, installation of FRP liner panels with adhesive and riveted fasteners, and coordination of electrical, mechanical, and plumbing disconnection and reconnection. The project contact is Paul Ducharme, Director of Facilities, Institutional Safety and Maintenance, reachable at 941-4050 or paul.ducharme@maine.gov.
The document does not specify pricing information, bid submission deadlines, site visit requirements, bidder conference dates, contract award dates, contract term, renewal options, set-asides, incumbent contractor information, or funding sources and amounts. The contractor is responsible for all demolition debris removal and must provide temporary protection measures for the kitchen area during construction to minimize operational disruption.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Conditions and Instructions to Bidders.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chill Box Repair
SCOPE
Project Description:
Repair requires dismantling of interior stainless steel floor, wall, and ceiling panels, removal of saturated insulation material, replacement with new blown insulation, and installation of new panels. Once new panels are installed, all joints and seams will be sealed with new epoxy sealant.
Project Dimensions: 10' X 20'(200 sq ft)
Project Location: Name of Buliding: DDPC
Street Address: 656 State St
Municipality: Bangor
County: Penobscot
Contact Person: Name: Paul Ducharme
Title: Director of Facilities, Institutional Safety and Maintenance Phone Number: 941-4050 Email Address paul.ducharme@maine.gov 1- Demolition and Temporary Protection
- Demolish interior tile, substrate and insulation
- Remove all bumper rails and corner guards, reinstall after rework
- Install temporary suspension interior lights
- Establish work zone and provide protection for kitchen during construction
2- Spray insulation over interior walls
- Provide temporary protection of refrigerator walls for insulating
- Spray with core-bond insulation
3- Frame, sheath, and install FRP walls
- Frame all walls with 1 5/8” metal studs
- Insulate all walls as specified in #2 above
- Install FRP liner panels and trim with adhesive and riveted fasteners
- Reinstall bumper rails and corner guards
4- Electrical, Mechanical, Plumbing, Waste Disposal
- All plumbing and electrical systems to be disconnected by contractor prior to demolition and reconnected after installation of new materials
- All demolition debris to be removed by contractor
File details come from the government source that posted it. Updated .