About this file

This is a proposal pricing document for transmission and distribution construction assembly units submitted to Cape Hatteras Electric Cooperative (CHEC) for five separate schedules of work. The project encompasses Sandy Bay Line Hardening (Structures 178-192), Salvo and Waves Pole Changeouts (Structures 250, 333, 349), Avon and Salvo Wood Pole Changeout, 115kV Transmission Line Insulator Changeout, and Avon Stub Poles. The work includes pole installation and removal, pole top construction assembly units, conductor work, guy and anchor assembly units, miscellaneous construction assembly units, and erosion and sediment control. Schedule 1 involves 15 concrete poles embedded in prestressed concrete cylinder piles and permanent steel cans with 9-foot and 20-foot embedment depths, installation of 13 TP-69G transmission pole top units and one TP-69GB unit, removal of 15 wood poles, and removal of multiple guy and anchor assemblies. Schedule 2 requires installation of two concrete poles with 18-foot and 20-foot embedment depths and two permanent steel cans, plus removal of three wood poles and associated equipment. Schedule 3 involves installation of 25 wood poles and removal of 25 existing wood poles with associated transmission equipment. Schedule 4 includes installation and removal of ten TP-115(M)SS transmission pole top units. Schedule 5 requires removal of 11 topped poles. The bid closing date is July 14, 2026 at 2:00 p.m., with specifications available through the VendorLink system at www.myvendorlink.com.

All pricing line items are currently shown as zero dollars pending contractor bid submission. The proposal summary indicates a total transmission and distribution construction cost across all five schedules of $1,046,744.00, with Schedule 1 totaling $718,372.97, Schedule 2 totaling $49,857.79, Schedule 3 totaling $259,065.56, Schedule 4 totaling $19,447.68, and Schedule 5 totaling zero dollars. Owner-furnished materials costs are broken out separately within each schedule, with Schedule 1 including $668,218.11 for transmission materials and $50,154.86 for distribution materials. The document notes that the owner will supply concrete poles, concrete cylinder piles, and wood poles, while contractors must supply all other materials including stabilization materials for excavated pole holes, steel cans, dumpsters for pole disposal, erosion and sediment control materials, and compost socks. Contractors are required to submit written pole installation methods and lump sum pricing for erosion and sediment control work, with optional unit pricing provided for change order items including installation of compost sock, temporary and permanent stabilization, timber matting installation, and weekly erosion control inspection and maintenance.

View the file

Other files

File Type Posted
CHECRUS830ContractIFB20260616.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trans-Pt 1-Sch 1 (Pg.1) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 1
W.O. #109639
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 1
Concrete Poles - Embedded in Prestressed Concrete Cylinder Pile
178*60/C-06.510,9249'-0"1$ - 0$ - 0$ - 0$ - 0
179*70/C-07.413,4749'-0"1$ - 0$ - 0$ - 0$ - 0
180*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
181*65/C-07.412,1739'-0"1$ - 0$ - 0$ - 0$ - 0
182*65/C-07.412,1739'-0"1$ - 0$ - 0$ - 0$ - 0
183*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
184*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
185*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
186*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
187*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
188*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
189*65/C-06.512,1739'-0"1$ - 0$ - 0$ - 0$ - 0
190*70/C-07.412,1739'-0"1$ - 0$ - 0$ - 0$ - 0
191*70/C-09.013,4749'-0"1$ - 0$ - 0$ - 0$ - 0
192*70/C-12.016,8109'-0"1$ - 0$ - 0$ - 0$ - 0
GCH15$ - 0$ - 0$ - 0$ - 0
LCH15$ - 0$ - 0$ - 0$ - 0
Note: The Contractor shall provide all materials required to maintain the stability of an excavated pole hole. Material shall be designed and built to withstand all loads caused by earth movement or pressure and shall maintain shape of the excavated hole under all circumstances. The Bidder shall include cost of all materials, equipment, and time associated with the above variables in Construction Assembly Unit prices. The Bidder must provide a written pole installation method with their bid.
**Prestressed Concrete Cylinder Piles With Permanent Steel Caisson (Contractor Supplied)
178*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
179*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
180*TMF-PCP-PC

(5'-6" x 24'-0") (7'-0" x 25'-0") 29,280 20'-0" 1 $ - 0 $ - 0 $ - 0 $ - 0

* Note: Owner will supply concrete cylinder pile and concrete pole. Contractor to supply all other materials.

** Note: Concrete Pile and Steel Can units are indicated as (Minimum Required Diameter x Length). For TMF-PCP-PC Line 1 is for Concrete Pile, Line 2 is for Steel Caisson.

SUB TOTAL Part 1 - Pole Units $ - 0

18-8888-9009/111 Copyrighted September 2018 41 &G

18-8580-9009/111, 18-8836-9009/111, 18-8995-9009/111, 18-8996-9009/111, 18-9010-9009/111, 18-9033-9009/111, 19-9134-9009/111 May 2019 42 &G

P.095443.T.TE.9009/111

(c) 2026 Booth & Associates, LLC. All rights reserved. 49 &G

20-9739-9009/111, 20-9740-9009/111 April 2023 34

Trans-Pt 1-Sch 1 (Pg.2) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 1
W.O. #109639
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 1 (Continued)
**Permanent Steel Cans - Direct Embedded - Contractor Supplied
181*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
182*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
183*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
184*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
185*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
186*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
187*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
188*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
189*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
190*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
191*TMF-PCP-PC

(5'-6" x 24'-0") (7'-0" x 25'-0") 29,280 20'-0" 1 $ - 0 $ - 0 $ - 0 $ - 0

* Note: Owner will supply concrete cylinder pile and concrete pole. Contractor to supply all other materials.

** Note: Concrete Pile and Steel Can units are indicated as (Minimum Required Diameter x Length). For TMF-PCP-PC Line 1 is for Concrete Pile, Line 2 is for Steel Caisson.

SUB TOTAL Part 1 Page 2 - Pole Units $ - 0

P.0954443.T.TE.9009/111

(C) 2026 Booth & Associates, LLC. All rights reserved. 50 &G

April 2023 34

Trans-Pt 1-Sch 1 (Pg.3) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 1
W.O. #109639
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 1 (Continued)
**Permanent Steel Cans - Direct Embedded - Contractor Supplied
192*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
* Note: Owner will supply concrete cylinder pile and concrete pole. Contractor to supply all other materials.

** Note: Concrete Pile and Steel Can units are indicated as (Minimum Required Diameter x Length). For TMF-PCP-PC Line 1 is for Concrete Pile, Line 2 is for Steel Caisson.

1.2 - Transmission Removal - Schedule No. 1
Wood Poles
17865/1N/A-1$ - 0$ - 0$ - 0$ - 0
17975/1N/A-1$ - 0$ - 0$ - 0$ - 0
18065/1N/A-1$ - 0$ - 0$ - 0$ - 0
18170/H2N/A-1$ - 0$ - 0$ - 0$ - 0
18260/1N/A-1$ - 0$ - 0$ - 0$ - 0
18365/1N/A-1$ - 0$ - 0$ - 0$ - 0
18465/1N/A-1$ - 0$ - 0$ - 0$ - 0
18565/1N/A-1$ - 0$ - 0$ - 0$ - 0
18665/1N/A-1$ - 0$ - 0$ - 0$ - 0
18765/1N/A-1$ - 0$ - 0$ - 0$ - 0
18865/1N/A-1$ - 0$ - 0$ - 0$ - 0
18965/1N/A-1$ - 0$ - 0$ - 0$ - 0
19180/H1N/A-1$ - 0$ - 0$ - 0$ - 0
19280/H2N/A-1$ - 0$ - 0$ - 0$ - 0
TOP POLEN/A-15$ - 0$ - 0$ - 0$ - 0
Wood Poles - Salvage
19080/H1N/A-1$ - 0$ - 0$ - 0$ - 0

Note: Old poles must be removed promptly (saw pole to place in dumpster). Contractor to supply the dumpster for pole disposal and disposal of old poles are the responsibility of the Contractor. The bidder shall include the cost of poles disposal in the Construction Assembly Unit Prices.

Note: Salvage existing pole 190. Owner will communicate to Contractor if removal plan changes.

SUB TOTAL Part 1 Page 3- Pole Units$ - 0
TOTAL Part 1 - Pole Units$ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 51 &G

April 2023 34

Trans-Pt 2-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 2 - POLE TOP CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1
W.O. #109639
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
2.1 - Transmission Install - Schedule No. 1
TP-69G(CX)M13$ - 0$ - 0$ - 0$ - 0
TP-69GB(CX)1$ - 0$ - 0$ - 0$ - 0
TS-5GA1$ - 0$ - 0$ - 0$ - 0
2.2 - Transmission Removal - Schedule No. 1
TP-115M13$ - 0$ - 0$ - 0$ - 0
TPS1-1151$ - 0$ - 0$ - 0$ - 0
TS-5AA1$ - 0$ - 0$ - 0$ - 0

TOTAL Part 2 - Pole Top Construction Assembly Units $ - 0

18-8580-9009/111, 18-8836-9009/111, 18-8995-9009/111, 18-8996-9009/111, 18-9010-9009/111, 18-9033-9009/111 19-9134-9009/111 May 2019 43 &G

(c) 2026 Booth & Associates, LLC. All rights reserved. 52 &G

Trans-Pt 3-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 3 - CONDUCTOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1
W.O. #109639
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITS (mft)Labor/mftMaterials/mftLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 3 - Conductor Construction Assembly Units N/A

18-8995-9009/111, 18-8996-9009/111, 18-9010-9009/111, 18-9033-9009/111 19-9134-9009/111 May 2019 44 &G

(c) 2026 Booth & Associates, LLC. All rights reserved. 53 &G

Trans-Pt 4-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 4 - GUY CONSTRUCTION ASSEMBLY UNITS (TG UNITS)
SCHEDULE NO. 1
W.O. #109639
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
4.1 - Transmission Install - Schedule No. 1
TG-27D(SS)1$ - 0$ - 0$ - 0$ - 0
4.2 - Transmission Removal - Schedule No. 1
TG-25C2$ - 0$ - 0$ - 0$ - 0
TG-25D7$ - 0$ - 0$ - 0$ - 0
TG-4016$ - 0$ - 0$ - 0$ - 0
TG-21A2$ - 0$ - 0$ - 0$ - 0
TG-11A(SS)14$ - 0$ - 0$ - 0$ - 0
TG-GM16$ - 0$ - 0$ - 0$ - 0

TOTAL Part 4 - Guy Construction Assembly Units (TG Units) $ - 0

18-8995-9009/111, 18-8996-9009/111, 18-9010-9009/111, 18-9033-9009/111, 19-9034-9009/111 May 2019 45 &G

(c) 2026 Booth & Associates, LLC. All rights reserved. 54 &G

Trans-Pt 5-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 5 - ANCHOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1
W.O. #109639
UNITNO. OF UNITSUnit PriceEXTENDED PRICE
NO.LaborMaterialsLabor & MaterialsLabor & Materials
5.1 - Transmission Install - Schedule No. 1
Not Applicable - N/A
5.2 - Transmission Removal - Schedule No. 1
TA-2S15$ - 0$ - 0$ - 0$ - 0

TOTAL Part 5 - Anchor Construction Assembly Units $ - 0

18-8995-9009/111, 18-8996-9009/111, 18-9010-9009/111, 18-9033-9009/111 19-9134-9009/111 May 2019 46 &G

(c) 2026 Booth & Associates, LLC. All rights reserved. 55 &G

Trans-Pt 6-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 6 - MISCELLANEOUS CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1
W.O. #109639
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
6.1 - Transmission Install - Schedule No. 1
TM-2B2$ - 0$ - 0$ - 0$ - 0
TM-4GM2$ - 0$ - 0$ - 0$ - 0
TM-813$ - 0$ - 0$ - 0$ - 0
TM-8-DDE2$ - 0$ - 0$ - 0$ - 0
TM-9D14$ - 0$ - 0$ - 0$ - 0
TM-9DX1$ - 0$ - 0$ - 0$ - 0
TM-9X13$ - 0$ - 0$ - 0$ - 0
TM-9R*15$ - 0$ - 0$ - 0$ - 0
TM-D11$ - 0$ - 0$ - 0$ - 0
TM-D27$ - 0$ - 0$ - 0$ - 0
TMS-115$ - 0$ - 0$ - 0$ - 0
TM-AFS (34.5kV)180$ - 0$ - 0$ - 0$ - 0
EXTENSION LINK*3$ - 0$ - 0$ - 0$ - 0
HPI-BOLTS45$ - 0$ - 0$ - 0$ - 0

*Estimated

6.2 - Transmission Removal - Schedule No. 1
TM-9B**15N/AN/AN/AN/A
TM-2B**2N/AN/AN/AN/A
TM-4GM2$ - 0$ - 0$ - 0$ - 0

**Ground wire is removed with pole, so no labor price for ground wire. Removal for accounting purposes only.

TOTAL Part 6 - Miscellaneous Construction Assembly Units $ - 0

18-8995-9009/111, 18-8996-9009/111, 18-9010-9009/111, 18-9033-9009/111 19-9134-9009/111 May 2019 47 &G

(c)2026 Booth & Associates, LLC. All rights reserved. 56 &G

Trans-Pt 7-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 7 - RIGHT-OF-WAY CLEARING UNITS (Continued)
SCHEDULE NO. 1
W.O. #109639
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 7 - Right-of-Way Clearing Units N/A

18-8995-9009/111, 18-8996-9009/111, 18-9010-9009/111, 18-9033-9009/111, 19-9134-9009/111 May 2019 48 &G

(c) 2026 Booth & Associates, LLC. All rights reserved. 57 &G

Pt 8 - Erosion and Sediment Con TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 8 - EROSION AND SEDIMENT CONTROL UNITS (Continued)
SCHEDULE NO. 1
W.O. #109639

Description No. Of Units Unit Type Unit Price Extended Price Labor & Materials

LaborMaterialsLabor & Materials
EROSION AND SEDIMENT CONTROL WORK*1LS$ - 0$ - 0$ - 0$ - 0
*Contractor will provide a lump sum price for completion of all work shown within the Erosion and Sediment Control Plan, including furnishing all materials.

This shall include placement of timber matting, installation of compost sock, temporary and permanent stabilization, maintanence and inspections, etc.

TOTAL Part 8 - Erosion and Sedimental Control Units $ - 0

CHANGE ORDER PRICING**
**The Contractor will provide the below optional unit prices for work functions inherent to the work contained in the base Contract. These unit prices will be used to account for additional work not originally foreseen (or for credit for work deleted from the original scope of the project)
Install 12" Compost Sock1LF$ - 0$ - 0$ - 0$ - 0
Temporary Stabilization/Seeding1SF$ - 0$ - 0$ - 0$ - 0
Permanent Stabilization/Seeding1SF$ - 0$ - 0$ - 0$ - 0
Install Timber Matting1SF$ - 0$ - 0$ - 0$ - 0
Erosion Control Inspection and Maintanence1Wk$ - 0$ - 0$ - 0$ - 0

NOTE: Refer to the Project Details - Schedule No. 1 for Erosion and Sediment Control details.

(c) 2026 Booth & Associates, LLC. All rights reserved. 58 &G

LCR - Changes-Sch 1

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1
W.O. #109639
UNITNO. OFUnit Price
NO.UNITSUnit PriceExtended Price
Pole Top Assembly Units
C1.41P(M)12$ - 0$ - 0
C2.52(AA)M1$ - 0$ - 0
C6.21L(10)1$ - 0$ - 0
C6.31L(10)1$ - 0$ - 0
Conductors (mft.)
336AAC "TULIP"12.988$ - 0$ - 0
Guy and Anchor Assemblies
TG-25C1$ - 0$ - 0
TG-401$ - 0$ - 0
TG-21A1$ - 0$ - 0
TA-2H1$ - 0$ - 0
Grounding Assemblies
M2-3A15$ - 0$ - 0
Miscellanous Assemblies
A1.011P9$ - 0$ - 0
M52-313$ - 0$ - 0

TOTAL Part LCR - Total Removal Construction Units $ - 0

(C) 2026 Booth & Associates, LLC. All rights reserved. 61 &G

LCR TableC -Removal-Sch 1 DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES (Continued)

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS (Continued)
SCHEDULE NO. 1
W.O. #109639

Table C. Unit Material Values of LCR Units Chargeable to Bidder (Continued)

UNIT NO. NO. OF UNITS UNIT MATERIAL VALUE* EXTENDED VALUE

* Unit values are based on item values from Table D.

P.095443.T.TE.9009/111

June 2026 62 &G

LCR TableC-1 - Removal-Sch 1 DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES (Continued)

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS (Continued)
SCHEDULE NO. 1
W.O. #109639
SCHEDULE NO. 4
Table C-1. Material Items to be Reused
RUS ITEM LETTERDESCRIPTION OF MATERIAL ITEMNUMBER OF ITEMS
DESIGNATION*
* See RUS Informational Publication 202-1, "List of Materials Acceptable for Use on Systems
of RUS Electrification Borrowers"

(c) 2026 Booth & Associates, LLC. All rights reserved. 63 &G

LCR TableD - Removal-Sch 1 DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES (Continued)

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS (Continued)
SCHEDULE NO. 1
W.O. #109639

Table D. Values of Material Items Creditable to Bidder (Continued)

RUS ITEM LETTERDESCRIPTION OF MATERIAL ITEMITEM VALUE
DESIGNATION*
* See RUS Informational Publication 202-1, "List of Materials Acceptable for Use on Systems of RUS
Electrification Borrowers"

(c) 2026 Booth & Associates, LLC. All rights reserved. 64 &G

LCN-New-Sch 1

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES

PART LCN - INSTALL CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1
W.O. #109639
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Pole Top Assembly Units
C1.41P(M)12$ - 0$ - 0$ - 0$ - 0
C2.52P1$ - 0$ - 0$ - 0$ - 0
C6.21LA (P)(M)2$ - 0$ - 0$ - 0$ - 0
Conductors (mft.)
556AAC "Dahlia"9.741$ - 0$ - 0$ - 0$ - 0
336 AAC "Tulip"3.247$ - 0$ - 0$ - 0$ - 0
Grounding Assemblies
M2-3A15$ - 0$ - 0$ - 0$ - 0
Miscellaneous Assemblies
A1.011P6$ - 0$ - 0$ - 0$ - 0
M52-315$ - 0$ - 0$ - 0$ - 0
TM-AFS (12.5kV)180$ - 0$ - 0$ - 0$ - 0
TM-AFS
(N)(12.5kV)60$ - 0$ - 0$ - 0$ - 0

TOTAL Part LCN - Install Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 66 &G

Trans-Pt 1-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 2
W.O. #109778
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 2
Concrete Poles - Direct Embedment
250*80/C-10.018,00018'-0"1$ - 0$ - 0$ - 0$ - 0
333*100/C-06.525,00020'-0"1$ - 0$ - 0$ - 0$ - 0
GCH2$ - 0$ - 0$ - 0$ - 0
LCH2$ - 0$ - 0$ - 0$ - 0

NOTES

* Owner will supply concrete pole. Contractor to supply all other materials.

** Contractor to supply steel can. Steel can units are indicated as (Minimum Required Diameter x Length).

Refer to the Project Details - Schedule No. 2 for access and erosion control details.

1.1 - Transmission Install - Schedule No. 2
Permanent Steel Cans - Direct Embedded - Contractor Supplied
250**TMF-EMB-PC
(5'0"x25'0")1$ - 0$ - 0$ - 0$ - 0
333**TMF-EMB-PC
(5'0"x25'0")1$ - 0$ - 0$ - 0$ - 0
1.2 - Transmission Removal - Schedule No. 2
Wood Poles
25070/H31$ - 0$ - 0$ - 0$ - 0
33390/H31$ - 0$ - 0$ - 0$ - 0
34985/H31$ - 0$ - 0$ - 0$ - 0
TOP POLE3$ - 0$ - 0$ - 0$ - 0

TOTAL Part 1 - Pole Units $ - 0

(C) 2026 Booth & Associates, LLC. All rights reserved. 68 &G

April 2023 34

Trans-Pt 2-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 2 - POLE TOP CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2
W.O. #109778
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
2.1 - Transmission Install - Schedule No. 2
TP-115M1$ - 0$ - 0$ - 0$ - 0
TP-115-B21$ - 0$ - 0$ - 0$ - 0
2.2 - Transmission Removal - Schedule No. 2
TP-115M2$ - 0$ - 0$ - 0$ - 0
TPS1-1151$ - 0$ - 0$ - 0$ - 0

TOTAL Part 2 - Pole Top Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 69 &G

Trans-Pt 3-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 3 - CONDUCTOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2
W.O. #109778
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITS (mft)Labor/mftMaterials/mftLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 3 - Conductor Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 70 &G

Trans-Pt 4-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 4 - GUY CONSTRUCTION ASSEMBLY UNITS (TG UNITS)
SCHEDULE NO. 2
W.O. #109778
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
4.1 - Transmission Install - Schedule No. 2
TG-27C(SS)2$ - 0$ - 0$ - 0$ - 0
TG-21A2$ - 0$ - 0$ - 0$ - 0
TG-GM2$ - 0$ - 0$ - 0$ - 0
4.2 - Transmission Removal - Schedule No. 2
TG-25C2$ - 0$ - 0$ - 0$ - 0
TG-21A2$ - 0$ - 0$ - 0$ - 0
TG-GM2$ - 0$ - 0$ - 0$ - 0

TOTAL Part 4 - Guy Construction Assembly Units (TG Units) $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 71 &G

Trans-Pt 5-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 5 - ANCHOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2
W.O. #109778
UNITNO. OF UNITSUnit PriceEXTENDED PRICE
NO.LaborMaterialsLabor & MaterialsLabor & Materials
5.1 - Transmission Install - Schedule No. 2
TA-2H1$ - 0$ - 0$ - 0$ - 0
5.2 - Transmission Removal - Schedule No. 2
TA-2S1$ - 0$ - 0$ - 0$ - 0

TOTAL Part 5 - Anchor Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 72 &G

Trans-Pt 6-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 6 - MISCELLANEOUS CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2
W.O. #109778
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
6.1 - Transmission Install - Schedule No. 2
TM-3B6$ - 0$ - 0$ - 0$ - 0
TM-82$ - 0$ - 0$ - 0$ - 0
TM-9D2$ - 0$ - 0$ - 0$ - 0
TM-9R*2$ - 0$ - 0$ - 0$ - 0
TM-9X2$ - 0$ - 0$ - 0$ - 0
HPI-BOLTS6$ - 0$ - 0$ - 0$ - 0

*Estimated Quantity

6.2 - Transmission Removal - Schedule No. 2
TM-9B**3N/AN/AN/AN/A

**Ground wire is removed wit pole, so no labor price for ground wire. Removal for accounting purposes only.

TOTAL Part 6 - Miscellaneous Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 73 &G

Trans-Pt 7-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 7 - RIGHT-OF-WAY CLEARING UNITS (Continued)
SCHEDULE NO. 2
W.O. #109778
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 7 - Right-of-Way Clearing Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 74 &G

LCR - Changes-Sch 2

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2
W.O. #109778
UNITNO. OFUnit Price
NO.UNITSUnit PriceExtended Price
Pole Top Assembly Units
A5.1P1$ - 0$ - 0
A5.1P1$ - 0$ - 0
C1.41SP1$ - 0$ - 0
C2.52(AA)FB1$ - 0$ - 0
C5.21P1$ - 0$ - 0
Grounding Assemblies
M2-3A2$ - 0$ - 0
Transformer Assemblies
G1.2(25)1$ - 0$ - 0
Secondary Assemblies
J2.14$ - 0$ - 0
Miscellanous Assemblies
A1.011FB1$ - 0$ - 0
M52-32$ - 0$ - 0
S1.12$ - 0$ - 0
S1.012$ - 0$ - 0
Single-Phase Riser Pole Assemblies
UA21$ - 0$ - 0

TOTAL Part LCR - Total Removal Construction Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 77 &G

LCR TableC -Removal-Sch 2 DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES (Continued)

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS (Continued)
SCHEDULE NO. 2
W.O. #109778

Table C. Unit Material Values of LCR Units Chargeable to Bidder (Continued)

UNIT NO.NO. OF UNITSUNIT MATERIAL VALUE*EXTENDED VALUE
G1.2(25)1$1,919.92$1,919.92

* Unit values are based on item values from Table D.

(C) 2026 Booth & Associates, LLC. All rights reserved. 78 &G

LCR TableC-1 - Removal-Sch 2 DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES (Continued)

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS (Continued)
SCHEDULE NO. 2
W.O. #109778
SCHEDULE NO. 4
Table C-1. Material Items to be Reused
RUS ITEM LETTERDESCRIPTION OF MATERIAL ITEMNUMBER OF ITEMS
DESIGNATION*
an25kva, Transformer, 7.2kV self-protected1
* See RUS Informational Publication 202-1, "List of Materials Acceptable for Use on Systems
of RUS Electrification Borrowers"

(c) 2026 Booth & Associates, LLC. All rights reserved. 79 &G

LCR TableD - Removal-Sch 2 DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES (Continued)

PART LCR - REMOVAL CONSTRUCTION ASSEMBLY UNITS (Continued)
SCHEDULE NO. 2
W.O. #109778

Table D. Values of Material Items Creditable to Bidder (Continued)

RUS ITEM LETTERDESCRIPTION OF MATERIAL ITEMITEM VALUE
DESIGNATION*
an25kva, Transformer, 7.2kV self-protected$1,919.92
* See RUS Informational Publication 202-1, "List of Materials Acceptable for Use on Systems of RUS
Electrification Borrowers"

(c) 2026 Booth & Associates, LLC. All right reserved. 80 &G

LCN - New-Sch 2

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS - LINE CHANGES

PART LCN - INSTALL CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2
W.O. #109778
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Pole Top Assembly Units
A5.2P(M)2$ - 0$ - 0$ - 0$ - 0
C1.41P(M)1$ - 0$ - 0$ - 0$ - 0
C2.52(AA)(M)1$ - 0$ - 0$ - 0$ - 0
C5.21P(M)1$ - 0$ - 0$ - 0$ - 0
Grounding Assemblies
M2-3A2$ - 0$ - 0$ - 0$ - 0
Transformer Assemblies
G1.2(25)1$ - 0$ - 0$ - 0$ - 0
Secondary Assemblies
J2-14$ - 0$ - 0$ - 0$ - 0
Miscellaneous Assemblies
M52-32$ - 0$ - 0$ - 0$ - 0
S1.14$ - 0$ - 0$ - 0$ - 0
S1.011$ - 0$ - 0$ - 0$ - 0
Single-Phase Riser Pole Assemblies
UA21$ - 0$ - 0$ - 0$ - 0

TOTAL Part LCN - Install Construction Aseembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 82 &G

Trans-Pt 1-Sch 3 (Pg.1) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 3
W.O. #109786
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 3
Wood Poles
44565/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
44665/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
44765/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
45065/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
45165/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
45270/H2N/A11'-0"1$ - 0$ - 0$ - 0$ - 0
45365/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
45465/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
45665/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
45765/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46265/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46365/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46465/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46565/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46665/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46765/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46865/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
46965/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
47065/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
47165/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
47365/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
47465/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
47565/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
47865/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
47965/H4N/A10'-6"1$ - 0$ - 0$ - 0$ - 0
Note: Owner will supply wood poles. Contractor to supply all other materials.
Note: The Contractor shall provide all materials required to maintain the stability of an excavated pole hole. Material shall be designed and built to withstand all loads caused by earth movement or pressure and shall maintain shape of the excavated hole under all circumstances. The Bidder shall include cost of all materials, equipment, and time associated with the above variables in Construction Assembly Unit prices. The Bidder must provide a written pole installation method with their bid.

NOTE: Refer to the Project Details - Schedule No. 3 for access and erosion control details.

SUB TOTAL Part 1 - Pole Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 84 &G

April 2023 34

Trans-Pt 1-Sch 3 (Pg.2) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 3
W.O. #109786
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.2 - Transmission Removal - Schedule No. 3
Wood Poles
44555/1N/A1$ - 0$ - 0$ - 0$ - 0
44655/1N/A1$ - 0$ - 0$ - 0$ - 0
44755/1N/A1$ - 0$ - 0$ - 0$ - 0
45055/1N/A1$ - 0$ - 0$ - 0$ - 0
45155/1N/A1$ - 0$ - 0$ - 0$ - 0
45260/2N/A1$ - 0$ - 0$ - 0$ - 0
45355/1N/A1$ - 0$ - 0$ - 0$ - 0
45455/1N/A1$ - 0$ - 0$ - 0$ - 0
45655/1N/A1$ - 0$ - 0$ - 0$ - 0
45755/1N/A1$ - 0$ - 0$ - 0$ - 0
46255/1N/A1$ - 0$ - 0$ - 0$ - 0
46355/1N/A1$ - 0$ - 0$ - 0$ - 0
46455/1N/A1$ - 0$ - 0$ - 0$ - 0
46555/1N/A1$ - 0$ - 0$ - 0$ - 0
46655/1N/A1$ - 0$ - 0$ - 0$ - 0
46755/1N/A1$ - 0$ - 0$ - 0$ - 0
46855/1N/A1$ - 0$ - 0$ - 0$ - 0
46955/1N/A1$ - 0$ - 0$ - 0$ - 0
47055/1N/A1$ - 0$ - 0$ - 0$ - 0
47155/1N/A1$ - 0$ - 0$ - 0$ - 0
47355/1N/A1$ - 0$ - 0$ - 0$ - 0
47455/1N/A1$ - 0$ - 0$ - 0$ - 0
47555/1N/A1$ - 0$ - 0$ - 0$ - 0
47855/1N/A1$ - 0$ - 0$ - 0$ - 0
47955/1N/A1$ - 0$ - 0$ - 0$ - 0
TOP POLEN/A25$ - 0$ - 0$ - 0$ - 0

Note: Old poles must be removed promptly (saw pole to place in dumpster). Disposal of old poles are the responsibility of the Contractor. The bidder shall include the cost of old poles disposal in the Construction Assembly Units. Dumpster is the responsibility of the Contractor.

SUB TOTAL Part 1 Page 2 - Pole Units$ - 0
TOTAL Part 1 - Pole Units$ - 0

(C) 2026 Booth & Associates, LLC. All rights reserved. 85 &G

April 2023 34

Trans-Pt 2-Sch 3 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 2 - POLE TOP CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 3
W.O. #109786
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
2.1 - Transmission Install - Schedule No. 3
TP-115(M)SS24$ - 0$ - 0$ - 0$ - 0
TP-115B21$ - 0$ - 0$ - 0$ - 0
2.2 - Transmission Removal - Schedule No. 3
TP-115M9$ - 0$ - 0$ - 0$ - 0
TP-115(M)SS15$ - 0$ - 0$ - 0$ - 0
TP-115B21$ - 0$ - 0$ - 0$ - 0

TOTAL Part 2 - Pole Top Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 86 &G

Trans-Pt 3-Sch 3 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 3 - CONDUCTOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 3
W.O. #109786
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITS (mft)Labor/mftMaterials/mftLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 3 - Conductor Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 87 &G

Trans-Pt 4-Sch 3 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 4 - GUY CONSTRUCTION ASSEMBLY UNITS (TG UNITS)
SCHEDULE NO. 3
W.O. #109786
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
4.1 - Transmission Install - Schedule No. 2
TG-17BD9$ - 0$ - 0$ - 0$ - 0
TG-11ASS2$ - 0$ - 0$ - 0$ - 0
TG-11A(SS)22$ - 0$ - 0$ - 0$ - 0
TG-27CSS2$ - 0$ - 0$ - 0$ - 0
TG-21A2$ - 0$ - 0$ - 0$ - 0
TG-GM24$ - 0$ - 0$ - 0$ - 0
4.2 - Transmission Removal - Schedule No. 3
TG-GM4$ - 0$ - 0$ - 0$ - 0

TOTAL Part 4 - Guy Construction Assembly Units (TG Units) $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 88 &G

Trans-Pt 5-Sch 3 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 5 - ANCHOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 3
W.O. #109786
UNITNO. OF UNITSUnit PriceEXTENDED PRICE
NO.LaborMaterialsLabor & MaterialsLabor & Materials
5.1 - Transmission Install - Schedule No. 3
TA1-6M26$ - 0$ - 0$ - 0$ - 0
TA-2H1$ - 0$ - 0$ - 0$ - 0
5.2 - Transmission Removal - Schedule No. 3
N/A

TOTAL Part 5 - Anchor Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 89 &G

Trans-Pt 6-Sch 3 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 6 - MISCELLANEOUS CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 3
W.O. #109786
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
6.1 - Transmission Install - Schedule No. 3
TM-825$ - 0$ - 0$ - 0$ - 0
TM-9BSS25$ - 0$ - 0$ - 0$ - 0
TM-9X25$ - 0$ - 0$ - 0$ - 0
TM-9R*25$ - 0$ - 0$ - 0$ - 0
TM-D212$ - 0$ - 0$ - 0$ - 0
TMS-123$ - 0$ - 0$ - 0$ - 0

*Estimated

6.2 - Transmission Removal - Schedule No. 3
TM-9B**N/AN/AN/AN/A

**Ground wire is removed with pole, so no labor price for ground wire. Removal for accounting purposes only.

TOTAL Part 6 - Miscellaneous Construction Assembly Units $ - 0

(c)2026 Booth & Associates, LLC. All rights reserved. 90 &G

Trans-Pt 7-Sch 3 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 7 - RIGHT-OF-WAY CLEARING UNITS (Continued)
SCHEDULE NO. 3
W.O. #109786
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 7 - Right-of-Way Clearing Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 91 &G

Trans-Pt 1-Sch 4 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 4
W.O. #109684
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

(C) 2026 Booth & Associates, LLC. All rights reserved. 93 &G

April 2023 34

Trans-Pt 2-Sch 4 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 2 - POLE TOP CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 4
W.O. #109684
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
2.1 - Transmission Install - Schedule No. 4
TP-115(M)SS10$ - 0$ - 0$ - 0$ - 0
2.2 Transmission Removal - Schedule No. 4
TP-115(M) SS10$ - 0$ - 0$ - 0$ - 0

NOTE: Refer to the Project Details - Schedule No. 4 for access and erosion control details.

TOTAL Part 2 - Pole Top Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 94 &G

Trans-Pt 3-Sch 4 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 3 - CONDUCTOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 4
W.O. #109684
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITS (mft)Labor/mftMaterials/mftLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 3 - Conductor Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 95 &G

Trans-Pt 4-Sch 4 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 4 - GUY CONSTRUCTION ASSEMBLY UNITS (TG UNITS)
SCHEDULE NO. 4
W.O. #109684
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 4 - Guy Construction Assembly Units (TG Units) N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 96 &G

Trans-Pt 5-Sch 4 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 5 - ANCHOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 4
W.O. #109684
UNITNO. OF UNITSUnit PriceEXTENDED PRICE
NO.LaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 5 - Anchor Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 97 &G

Trans-Pt 6-Sch 4 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 6 - MISCELLANEOUS CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 4
W.O. #109684
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
6.1 - Transmission Install - Schedule No. 4
HPI-BOLTS30$ - 0$ - 0$ - 0$ - 0
6.2 - Transmission Removal - Schedule No. 4
N/A

TOTAL Part 6 - Miscellaneous Construction Assembly Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 98 &G

Trans-Pt 7-Sch 4 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 7 - RIGHT-OF-WAY CLEARING UNITS (Continued)
SCHEDULE NO. 4
W.O. #109684
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 7 - Right-of-Way Clearing Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 99 &G

Trans-Pt 1-Sch 5 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 1 - POLE UNITS
SCHEDULE NO. 5
W.O. #109829
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 5
Not Applicable - N/A
1.2 - Transmission Removal - Schedule No. 5
Wood Poles
608-2Topped Pole1$ - 0$ - 0$ - 0$ - 0
609Topped Pole1$ - 0$ - 0$ - 0$ - 0
611Topped Pole1$ - 0$ - 0$ - 0$ - 0
612Topped Pole1$ - 0$ - 0$ - 0$ - 0
614Topped Pole1$ - 0$ - 0$ - 0$ - 0
615Topped Pole1$ - 0$ - 0$ - 0$ - 0
616Topped Pole1$ - 0$ - 0$ - 0$ - 0
617Topped Pole1$ - 0$ - 0$ - 0$ - 0
620Topped Pole1$ - 0$ - 0$ - 0$ - 0
622Topped Pole1$ - 0$ - 0$ - 0$ - 0
641Topped Pole1$ - 0$ - 0$ - 0$ - 0

Note: Refer to the Project Details - Schedule No. 5 for access and erosion control details.

SUB TOTAL Part 1 - Pole Units $ - 0

(c) 2026 Booth & Associates, LLC. All rights reserved. 101 &G

April 2023 34

Trans-Pt 2-Sch 5 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 2 - POLE TOP CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 5
W.O. #109829
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 2 - Pole Top Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 102 &G

Trans-Pt 3-Sch 5 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 3 - CONDUCTOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 5
W.O. #109829
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITS (mft)Labor/mftMaterials/mftLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 3 - Conductor Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 103 &G

Trans-Pt 4-Sch 5 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 4 - GUY CONSTRUCTION ASSEMBLY UNITS (TG UNITS)
SCHEDULE NO. 5
W.O. #109829
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 4 - Guy Construction Assembly Units (TG Units) N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 104 &G

Trans-Pt 5-Sch 5 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 5 - ANCHOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 5
W.O. #09829
UNITNO. OF UNITSUnit PriceEXTENDED PRICE
NO.LaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 5 - Anchor Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 105 &G

Trans-Pt 6-Sch 5 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 6 - MISCELLANEOUS CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 5
W.O. #109829
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Application - N/A

TOTAL Part 6 - Miscellaneous Construction Assembly Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 106 &G

Trans-Pt 7-Sch 5 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

PART 7 - RIGHT-OF-WAY CLEARING UNITS (Continued)
SCHEDULE NO. 5
W.O. #109829
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 7 - Right-of-Way Clearing Units N/A

(c) 2026 Booth & Associates, LLC. All rights reserved. 107 &G

Summary

PROPOSAL SUMMARY

SANDY BAY LINE HARDENING STR. 178 - 192
SCHEDULE NO. 1 - W.O. #109639
TRANSMISSION CONSTRUCTION ASSEMBLY UNITS
Part – 1. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 2. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 3. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 4. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 5. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 6. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 7. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 8. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0

TOTAL TRANSMISSION CONSTRUCTION ASSEMBLY UNITS $ - 0

TOTAL TRANSMISSION CONSTRUCTION - OWNER
FURNISHED MATERIALS - LUMP SUM COST$ 668,218.11

TOTAL TRANSMISION $ 668,218.11

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS
NEW CONSTRUCTION

OVERHEAD - Part 1, A - Y N/A

UNDERGROUND - Part UD - UR N/A

TOTAL NEW DISTRIBUTION LINE CONSTRUCTION N/A

SCHEDULE NO. 1 LINE CHANGES - W.O. #109639
Part LCC. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCR. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part LCN. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
TOTAL LINE CHANGES$ - 0

TOTAL DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS $ - 0

TOTAL DISTRIBUTION CONSTRUCTION - OWNER
FURNISHED MATERIALS - LUMP SUM COST$ 50,154.86

TOTAL DISTRIBUTION $ 50,154.86

TOTAL SCHEDULE NO. 1 (W.O. #109639) $ 718,372.97

PROPOSAL SUMMARY

SALVO AND WAVES POLE CHANGEOUTS STRS. 250, 333, 349
SCHEDULE NO. 2 - W.O. #109778
TRANSMISSION CONSTRUCTION ASSEMBLY UNITS
Part – 1. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 2. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 3. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 4. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 5. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 6. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 7. . . . . . . . . . . . . . . . . . . . . . . . . .N/A

TOTAL TRANSMISSION CONSTRUCTION ASSEMBLY UNITS $ - 0

TOTAL TRANSMISSION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST $ 44,583.98

TOTAL TRANSMISION SCHEDULE $ 44,583.98

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS
NEW CONSTRUCTION

OVERHEAD - Part 1, A - Y N/A

UNDERGROUND - Part UD - UR N/A

TOTAL NEW DISTRIBUTION LINE CONSTRUCTION N/A

SCHEDULE NO. 2 LINE CHANGES - W.O. #109778
Part LCC. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCR. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part LCN. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
TOTAL LINE CHANGES$ - 0
TOTAL DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS$ - 0

TOTAL DISTRIBUTION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST $ 5,273.81

TOTAL DISTRIBUTION $ 5,273.81

TOTAL SCHEDULE NO. 2 (W.O. #109778) $ 49,857.79

PROPOSAL SUMMARY

AVON AND SALVO WOOD POLE CHANGEOUT
SCHEDULE NO. 3 - W.O. #109786
TRANSMISSION CONSTRUCTION ASSEMBLY UNITS
Part – 1. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 2. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 3. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 4. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 5. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 6. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 7. . . . . . . . . . . . . . . . . . . . . . . . . .N/A

TOTAL TRANSMISSION CONSTRUCTION ASSEMBLY UNITS $ - 0

TOTAL TRANSMISSION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST $259,065.56

TOTAL TRANSMISION SCHEDULE $ 259,065.56

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS
NEW CONSTRUCTION

OVERHEAD - Part 1, A - Y N/A

UNDERGROUND - Part UD - UR N/A

TOTAL NEW DISTRIBUTION LINE CONSTRUCTION N/A

SCHEDULE NO. 3 LINE CHANGES - W.O. #109786
Part LCC. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCR. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCN. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
TOTAL LINE CHANGESN/A
TOTAL DISTRIBUTION CONSTRUCTION ASSEMBLY UNITSN/A

TOTAL DISTRIBUTION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST N/A

TOTAL DISTRIBUTION N/A

TOTAL SCHEDULE NO. 3 (W.O. #109786) $ 259,065.56

PROPOSAL SUMMARY

115kV TRANSMISSION LINE INSULATOR CHANGEOUT
SCHEDULE NO. 4 - W.O. #109684
TRANSMISSION CONSTRUCTION ASSEMBLY UNITS
Part – 1. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 2. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 3. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 4. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 5. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 6. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 7. . . . . . . . . . . . . . . . . . . . . . . . . .N/A

TOTAL TRANSMISSION CONSTRUCTION ASSEMBLY UNITS $ - 0

TOTAL TRANSMISSION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST $19,447.68

TOTAL TRANSMISION SCHEDULE $ 19,447.68

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS
NEW CONSTRUCTION

OVERHEAD - Part 1, A - Y N/A

UNDERGROUND - Part UD - UR N/A

TOTAL NEW DISTRIBUTION LINE CONSTRUCTION N/A

SCHEDULE NO. 4 LINE CHANGES - W.O. #109684
Part LCC. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCR. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCN. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
TOTAL LINE CHANGESN/A
TOTAL DISTRIBUTION CONSTRUCTION ASSEMBLY UNITSN/A

TOTAL DISTRIBUTION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST N/A

TOTAL DISTRIBUTION N/A

TOTAL SCHEDULE NO. 4 (W.O. #109684) $ 19,447.68

PROPOSAL SUMMARY

AVON STUB POLES
SCHEDULE NO. 5 - W.O. #109829
TRANSMISSION CONSTRUCTION ASSEMBLY UNITS
Part – 1. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 2. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 3. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 4. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 5. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 6. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part – 7. . . . . . . . . . . . . . . . . . . . . . . . . .N/A

TOTAL TRANSMISSION CONSTRUCTION ASSEMBLY UNITS $ - 0

TOTAL TRANSMISSION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST N/A

TOTAL TRANSMISION SCHEDULE $ - 0

DISTRIBUTION CONSTRUCTION ASSEMBLY UNITS
NEW CONSTRUCTION

OVERHEAD - Part 1, A - Y N/A

UNDERGROUND - Part UD - UR N/A

TOTAL NEW DISTRIBUTION LINE CONSTRUCTION N/A

SCHEDULE NO. 5 LINE CHANGES - W.O. #109829
Part LCC. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCR. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
Part LCN. . . . . . . . . . . . . . . . . . . . . . . . . .N/A
TOTAL LINE CHANGESN/A
TOTAL DISTRIBUTION CONSTRUCTION ASSEMBLY UNITSN/A

TOTAL DISTRIBUTION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST N/A

TOTAL DISTRIBUTION N/A

TOTAL SCHEDULE NO. 5 (W.O. #109829 $ - 0

TOTAL TRANSMISSION AND DISTRIBUTION
SCHEDULE NOS. 1 - 5$ 1,046,744.00

P.0954443.T.TE.9009

(c) 2026 Booth & Associates, LLC. All rights reserved. &P &G image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .