Checklist_-Vendor_Checklist.pdf
PDF 202 KB Posted
- Attached to
- LARGE MACHINE MOWING SERVICES
- Solicitation number
- 26-8620
- Issued by
- Collier County, Florida
About this file
This is a vendor checklist document issued by the Collier County Board of County Commissioners Procurement Services Division for the Large Machine Mowing Services Invitation to Bid 26-8620. The County seeks qualified contractors to provide mowing services throughout Collier County, Florida, encompassing roadway medians, side rights-of-way, retention ponds, pond sites, swales, canals, and other county-maintained properties on both bi-monthly and 30-day rural cycles. All mowing unit prices must be submitted on a per-acre basis and include labor, equipment, materials, supervision, fuel, weed removal, edging, trimming, blowing, litter and debris removal, slope mowing as applicable, and traffic control measures. Bidders must possess valid Maintenance of Traffic (MOT) or Temporary Traffic Control (TTC) Intermediate Level Certification and, if using herbicides, a Florida Department of Agriculture and Consumer Services Certified Commercial Pesticide Applicator License. All bids must be submitted electronically through https://procurement.opengov.com/portal/collier-county-fl by April 13, 2026, with pricing remaining firm for 180 calendar days from bid opening. The contract term is three years with two one-year renewal options, and the County intends to identify Primary, Secondary, and Tertiary awardees to ensure service continuity.
The vendor checklist requires submission of 18 specific items, including the Vendor Declaration Statement, Conflict of Interest Certification, Immigration Certification with E-Verify enrollment proof, local business certification if applicable, reference questionnaires, W-9 Form, proof of Florida business status, required licenses and certifications, and acknowledgment of insurance requirements and County terms and conditions. Award will be made to the lowest responsive and responsible bidder offering best value. Historical spending data indicates annual expenditures of approximately $252,133.64 in FY 2022, $239,286.10 in FY 2023, $262,794.45 in FY 2024, and $351,391.07 in FY 2025. Vendors may certify local business status if they maintain a physical business address within Collier County limits and possess a current local Business Tax Receipt. Comprehensive insurance requirements include Worker's Compensation at statutory limits, Commercial General Liability with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate, and Employer's Liability coverage with Collier County named as additional insured. For projects potentially exceeding $200,000, a bid bond equal to 5 percent of the cost proposal must accompany the submission, with Performance and Payment Bonds required upon award.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 2 9.2.25
Procurement Services Division
Vendor Checklist
IMPORTANT: PLEASE REVIEW CAREFULLY AND SUBMIT WITH YOUR PROPOSAL/BID. ALL APPLICABLE
DOCUMENTS SHALL BE SUBMITTED ELECTRONICALLY THROUGH OPENGOV. VENDOR SHOULD
CHECKOFF EACH OF THE FOLLOWING ITEMS. ALL DOCUMENTS REQUIRING EXECUTION SHOULD BE EITHER BY WET SIGNATURES OR VERIFIABLE ELECTRONIC SIGNATURES. FAILURE TO PROVIDE THE
APPLICABLE DOCUMENTS MAY DEEM YOU NON-RESPONSIVE/NON-RESPONSIBLE.
General Instructions have been acknowledged and accepted.
Collier County Purchase Order Terms and Conditions have been acknowledged and accepted.
Form 1: Vendor Declaration Statement
Form 2: Conflict of Interest Certification
Proof of status from Division of Corporations - Florida Department of State (If work performed in the State) -http://dos.myflorida.com/sunbiz/ should be attached with your submittal.
Vendor MUST be enrolled in the E-Verify - https://www.e-verify.gov/ at the time of submission of the proposal/bid.
Form 3: Immigration Certification MUST be signed and attached with your submittal.
E-Verify Memorandum of Understanding or Company Profile page should be attached with your submittal.
Form 4: Certification for Claiming Status as a Local Business, if applicable, has been executed and returned. Collier or Lee County Business Tax Receipt should be attached with your submittal to be considered.
Form 5: Reference Questionnaire form must be fully completed for each requested reference, if applicable, are executed and should be included with your submittal.
Form 6: Grant Provisions and Assurances package in its entirety, if applicable, are executed and should be included with your submittal.
Vendor W-9 Form.
Vendor acknowledges Insurance Requirements and is prepared to produce the required insurance certificate(s) within five
(5) days of the County’s issuance of a Notice of Recommend Award.
The Bid Schedule has been completed and attached with your submittal, applicable to bids.
Copies of all requested licenses and/or certifications.
All addenda have been signed and attached.
County’s IT Technical Architecture Requirements have been acknowledged and accepted, if applicable.
Any and all supplemental requirements and terms have been acknowledged and accepted, if applicable.
http://dos.myflorida.com/sunbiz/ https://www.e-verify.gov/
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
File details come from the government source that posted it. Updated .