Check Off sheet ITB~19.pdf

PDF 100 KB Posted

Attached to
CCCF Fire Panel Upgrade
Solicitation number
S-29100-00018287
Issued by
Oregon

About this file

This is a check-off sheet for Invitation to Bid (ITB) #19 related to the CCCF Fire Panel Upgrade project in Oregon. The document serves as a checklist or evaluation form to verify compliance with bid requirements and specifications. The sheet outlines specific criteria and checkpoints that bidders must satisfy, including technical specifications, documentation requirements, and conformance to the scope of work for the fire panel upgrade project. The document functions as an administrative tool to ensure all submitted bids meet the baseline qualifications and mandatory requirements established by the contracting jurisdiction before proceeding to substantive evaluation.

The check-off sheet establishes clear evaluation standards for vendor responses and helps streamline the bid review process by providing a systematic approach to verify that each bidder has submitted required documentation and proposed solutions meeting the technical requirements. This document is essential for maintaining consistency in bid evaluation and ensuring fair comparison among competing bidders responding to the fire panel upgrade opportunity.

View the file

Other files

File Type Posted
18287_ITB_GTC_SGC.pdf PDF
18287 ATTACHMENT C PLANS.pdf PDF
18287 ATTACHMENT B SPECIFICATIONS .pdf PDF
STATEMENT OF WORK~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidder reminders check off sheet

INFORMATION TO BE SUBMITTED WITH THE BID: The items listed below in this section shall be submitted or the Bid shall be found to be non‐responsive. The following shall be submitted prior to Closing:

Exhibit 1- Pricing Submittal Section.

Section D- Bid Security Requirements

Section G- Construction Contractors Board (CCB) Registration Requirements; Asbestos Abatement Licensing Requirements, & Joint Venture ‐ Partnership Declaration, Section H- Addenda Acknowledgement.

Section I- Responsibility Inquiry & Contractor References; ESB Utilization.

Attachment D- Bidder References

Section K- Residency Information.

Section O- Signature of Bidder's Duly Authorized Representative.

Any Addenda (If required).

Section F- First Tier Subcontractor Disclosure Form. Or within two (2) working hours after the Closing.

File details come from the government source that posted it. Updated .