Change Order Notice~59.pdf

PDF 1 MB Posted

Attached to
CHANGE ORDER NOTICE: (FY27) Wood Posts (Subject to SBSA)
Solicitation number
27-494DOT-FINAD-B-54507
Issued by
Illinois

About this file

This Change Order Notice is issued by the Illinois Chief Procurement Office for General Services to modify contract P-102244, which was executed on October 7, 2026, for the annual purchase of wood sign posts used by the Department of Transportation (DOT). The contract, referenced as B-54507, covers wood posts with MCA Preservative Treatment that are utilized by district sign shops for installing new traffic signs and replacing or repairing existing signs along state-maintained roadways. The change order notice is being posted on the Bulletin/BidBuy for the required 14-day period in accordance with procurement regulations mandating public posting of change orders exceeding $25,000 or extending completion schedules by 180 days or more.

The vendor has requested a price adjustment due to increased pricing for Southern Yellow Pine with MCA Preservative Treatment materials. The change order is deemed necessary to maintain continuity of supply and prevent disruptions to sign installation and maintenance operations, as inadequate wood post inventory could compromise the timely completion of necessary sign installations and repairs, potentially affecting roadway safety and traffic control. The procurement supports ongoing district operations and roadway maintenance responsibilities essential to protecting public safety on state-maintained roadways. This change order is subject to the Small Business Set-Aside (SBSA) as indicated in the contract title.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: DOT - Transportation
ProcurementTitle: CHANGE ORDER NOTICE: (FY27) Wood Posts (Subject to SBSA)
BBREFNO.: B-54507
thedetails: This contract was executed on October 7, 2026 (P-102244). The vendor notified us that increased pricing for Southern Yellow Pine with MCA Preservative Treatment would necessitate a request for a price adjustment. This procurement supports the annual purchase of wood sign posts used by district sign shops to install new traffic signs and replace or repair existing signs along state-maintained roadways. These posts are essential materials for maintaining the integrity, visibility, and effectiveness of roadway traffic control signage.

The timely procurement of these materials is critical to ensuring that district sign shops can respond to damaged or deteriorated sign posts, replace missing or compromised signs, and install new traffic signs as needed. Without an adequate supply of wood posts, the districts may be unable to complete necessary sign installations and repairs in a timely manner. Such delays could result in missing, damaged, or improperly supported traffic signs, potentially affecting motorists' ability to recognize roadway regulations, warnings, and guidance. This could compromise roadway safety, disrupt traffic control, and increase the risk of accidents or other hazardous conditions for the traveling public.

Given the essential role these materials play in maintaining safe roadway conditions, addressing the vendor's requested price increase is important to ensuring continuity of supply and minimizing potential disruptions to sign installation and maintenance operations. Maintaining access to these materials is necessary to support district operations, fulfill ongoing roadway maintenance responsibilities, and protect the safety of the motoring public.

CheckBox1: 0
CheckBox2: 1

File details come from the government source that posted it. Updated .