Change Order Notice Renewal years 1 and 2 Elevator Repair and Maintenance.~1.pdf

PDF 2 MB Posted

Attached to
RENEWAL NOTICE DHS IFB-ISD AND ISVI ELEVATOR REPAIR AND MAINTENANCE SERVICES
Solicitation number
25-444DHS-ISDIS-B-40443
Issued by
Mercer County, Illinois

About this file

This document is a Change Order Notice from the Chief Procurement Office for General Services related to the renewal of a contract for Elevator Repair and Maintenance services for the Illinois School for the Deaf and the Illinois School for the Visually Impaired. The change order is for a 2-year renewal of the contract, with an increase in the yearly contract amounts due to inflation and increased costs of parts. The total increase will be $1,648.50 per year for the 2-year renewal period.

The contract is for providing Elevator Repair and Maintenance services at the two Illinois schools. This is a renewal of the existing contract, with no new solicitation. The renewal is for a 2-year term, with the option to renew for an additional 2 years. The change order is required due to increased costs that were not reasonably foreseeable at the time the original contract was signed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.23.2 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: DHS - Human Services
ProcurementTitle: Renewal years 1 and 2 for Elevator Repair and Maintenance FY25 and FY26
BBREFNO.: R-196663
thedetails: This contract is for the Repair and Maintenance services for Elevators at Illinois School for the Deaf and Illinois School for the Visually Impaired. This change order is for an increase in yearly contract amounts for years 1 and 2 of a 2 year renewal option, due to inflation and costs of parts are more. The total increase will be $1648.50 per year.
CheckBox1: 1
CheckBox2: 1

File details come from the government source that posted it. Updated .