Change Order Notice Fairbanks V.20.1 2.pdf
PDF 2 MB Posted
- Solicitation number
- 21-494DOT-FINAD-B-17950
- Issued by
- Illinois
About this file
This document is a Change Order Notice from the Illinois Chief Procurement Office General Services for the Central Operations Fairbanks Maintenance and Repair of Highway Weighing Equipment contract with the Illinois Department of Transportation. The notice details the rationale for increasing the contract value by $228,811 to fund an additional, unanticipated scale improvement at the Marion Northbound scale location. The change order is necessary as the additional work was not reasonably foreseeable at the time the contract was originally signed, but is germane to the original contract scope.
The contract, which has a BBREFNO. of B-17950, requires the maintenance and repair of highway weighing equipment. The additional funding is advantageous to the Department of Transportation as it allows them to utilize the existing contract rather than solicit the requested improvement separately. This change order is being posted in accordance with state procurement regulations that require notice of renegotiated contracts and change orders exceeding $10,000 or 30 days.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office General Services v.20.1
44 Ill. Adm. Code 1.1525(h) requires notice of renegotiated contracts and change orders that increase the cost of a contract by more than $10,000 or the time of completion by a total of 30 days or more to be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| BBREFNO.: B-17950 |
| ProcurementTitle: Central Operations Fairbanks Maint. and Repair of Highway Weighing Equipment |
| DropDownList1: DOT - Transportation |
| thedetails: An additional, unanticipated scale improvement at the Marion Northbound scale location will deplete the spending allowed under the contract. It is advantageous to the Department to utilize the existing contract rather than to solicit the requested improvement. |
| CheckBox1: 1 |
| CheckBox2: 1 |
File details come from the government source that posted it. Updated .