Attachment 1 -Performance Work Statement DC 08212026 Ver 2 updated mod to PWS.docx
DOCX document 97 KB Posted
- Attached to
- Aircraft Polishing, Corrosion Prevention, and Cleaning Services U. S. Coast Guard Air Station Washington
- Solicitation number
- CGSS26-COCO41-018
About this file
This is a Performance Work Statement (PWS) for Aircraft Polishing, Corrosion Prevention, and Cleaning Services at U.S. Coast Guard Air Station Washington. The Contractor shall provide all personnel, supervision, labor, tools, equipment, materials, and quality control necessary to perform exterior metallic-surface polishing (brightwork), corrosion-protection coating application, exterior dry washing and ceramic-coating upkeep, interior deep cleaning, and carpet cleaning on three Gulfstream aircraft: C-37A (CG-101), C-37B (CG-102), and C-39A (CG-103 and CG-104). Work must be performed in accordance with current Gulfstream Computerized Maintenance Program (CMP), Aircraft Maintenance Manual (AMM), Aircraft Outfitting Cleaning Manual, and manufacturer application instructions. The contract period consists of a 12-month Base Period (September 15, 2026–September 14, 2027) with four optional 12-month renewal periods through September 14, 2031. Performance will take place at U.S. Coast Guard Air Station Washington, Hangar 6, Ronald Reagan Washington National Airport, Washington, DC.
Key performance requirements include conducting joint pre-work condition surveys, polishing authorized metallic surfaces to uniform finish free of oxidation and contamination, applying Granitize Aviation Xzilon 3 or approved equal for corrosion protection, performing complete exterior dry wash with ceramic-coating inspection and upkeep, deep cleaning interior surfaces and carpets while protecting floor-heating elements, and maintaining Foreign Object Debris (FOD) and tool control. Performance standards require 100 percent visual inspection of brightwork, documentation of coating application with lot numbers and cure conditions, verification of carpet condition and floor-heating system integrity, and completion documentation including quality control sign-off submitted within one business day of service completion. The Contractor must designate a Program Manager, provide personnel qualifications evidence, attend a kickoff meeting within three business days of award, and submit detailed quality-control and work plans at least five business days before each service event. Government-furnished property includes facility access and a scissor lift when identified in service requests, while the Contractor furnishes all other tools, equipment, polishing supplies, cleaning products, protective coatings, and safety equipment. The Contractor may utilize subcontractors subject to FAR 52.244-2 compliance, with the prime Contractor retaining full responsibility for all subcontractor performance and qualifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED SYNOPSIS Ver 2 updated 8212026 Mod to Solicitation.docx | DOCX document | |
| Vendor Evaluation Questions Guide.docx | DOCX document | |
| Attachment 1 -Performance Work Statement DC 08072026.pdf | ||
| COMBINED SYNOPSIS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES COAST GUARD
AIR STATION WASHINGTON
PERFORMANCE WORK STATEMENT
Aircraft Polishing, Corrosion Prevention, and Cleaning Services C-37A, C-37B, and C-39A Aircraft
PERFORMANCE WORK STATEMENT FINAL
Document Status
August 03 , 2026
Revision Date
U.S. Coast Guard Air Station Washington
Requiring Activity
Hangar 6, Ronald Reagan Washington National Airport, Washington, DC
Place of Performance
CONTENTS
1.0 General
2.0 Performance Requirements
3.0 Performance Standards, Inspection, and Acceptance
4.0 Contract Administration
5.0 Deliverables
6.0 Applicable References
7.0 Acronyms and Definitions Appendix A - Maintenance Task Matrix Appendix B - Contractor-Furnished Tools, Equipment, and Materials Appendix C - Government Pre-Issuance Validation Checklist (Not a Contract Requirement)
1.0 GENERAL
1.1 Scope
The Contractor shall provide all qualified personnel, supervision, labor, tools, equipment, materials, consumables, transportation, quality control, and documentation necessary to perform exterior metallic-surface polishing (brightwork), corrosion-protection coating application, exterior dry washing and ceramic-coating upkeep, interior deep cleaning, and carpet cleaning for the U.S. Coast Guard Air Station Washington aircraft listed below, except for Government-furnished property expressly identified in this PWS:
· C-37A (Gulfstream V), aircraft CG-101;
· C-37B (Gulfstream G550), aircraft CG-102; and
· C-39A (Gulfstream G700), aircraft CG-103 and CG-104, subject to Government confirmation of designation and aircraft identifiers before solicitation release.
All work shall be performed in accordance with the current, Government-approved Gulfstream Computerized Maintenance Program (CMP), Aircraft Maintenance Manual (AMM), Aircraft Outfitting Cleaning Manual, manufacturer application instructions, applicable Coast Guard maintenance directives, and this PWS. Where a conflict exists, the Contracting Officer (CO) shall obtain technical direction from the designated Government engineering or maintenance authority before the Contractor proceeds.
1.2 Background
Air Station Washington provides safe, reliable, worldwide long-range command-and-control air transportation for the Secretary of Homeland Security, the Commandant of the Coast Guard, and other senior Government officials. Periodic surface preservation and cleaning are required to support corrosion prevention, appearance, cabin condition, and aircraft mission readiness.
1.3 Objective
The objective is to restore and maintain clean, corrosion-resistant, serviceable exterior metallic and coated surfaces and a clean, undamaged passenger cabin while protecting aircraft finishes, components, systems, furnishings, floor-heating elements, and adjacent Government property. The Contractor shall complete each service event within the Government-approved schedule and provide objective evidence that the applicable tasks and acceptance standards were met.
1.4 Performance-Based Approach
This PWS describes the required results, performance standards, and acceptance methods. Except where compliance with approved aircraft technical data requires a specific method, the Contractor is responsible for selecting and managing its work methods. The Contractor shall not deviate from approved maintenance data or substitute products without prior written approval through the CO.
1.5 Order of Precedence for Technical Requirements
For technical performance only, the following order applies unless the CO issues have written directions otherwise:
1. Airworthiness directives, approved Coast Guard engineering instructions, and other mandatory Government technical direction applicable to the aircraft;
2. Current Gulfstream CMP, AMM, Aircraft Outfitting Cleaning Manual, and approved manufacturer instructions applicable to the aircraft and task;
3. This PWS and task order or service request; and
4. The Contractor’s approved work plan and quality-control procedures.
Contract terms, conditions, and clauses control over the Contractor’s work plan. Only the CO may change the contract.
2.0 PERFORMANCE REQUIREMENTS
2.1 General Requirements
The Contractor shall perform only the tasks authorized in writing by the CO or COR within the scope of the contract. The Government will identify the aircraft, required task(s), technical-data revision, service window, and any mission-driven restrictions for each event. The Contractor shall protect all adjacent surfaces, openings, sensors, static ports, antennas, windows, seals, painted areas, composite structures, and interior components from contamination, abrasion, chemical exposure, and impact damage.
2.2 Maintenance Task Matrix
Appendix A reproduces and reorganizes the CMP task numbers supplied in the original PWS. Before each service event, the Government shall identify the applicable current task number and revision. The Contractor shall not rely on an obsolete task number or perform a task for an aircraft model where the applicable task number is not provided.
2.3 Pre-Work Coordination and Condition Survey
Before beginning work on each aircraft, the Contractor and COR or designated Government aircraft-maintenance representative shall conduct and document a joint condition survey. The survey shall record pre-existing scratches, dents, corrosion indications, coating defects, damaged trim, carpet condition, floor-heating system status, loose furnishings, inoperative components, and other observable discrepancies in the work areas. Photographs may be taken only when specifically authorized by the Government.
The Contractor shall submit a written work plan identifying task sequence, personnel, estimated duration, tools, materials, chemical products, Safety Data Sheets (SDS), aircraft-protection methods, foreign object debris (FOD) controls, and quality-control inspections.
2.4 Brightwork Polishing
Brightwork means exposed aircraft metallic surfaces that are maintained in a polished finish. The Contractor shall polish the authorized exterior metallic surfaces in accordance with the applicable current Gulfstream procedure. Required areas may include:
· Left and right engine inlet cowl lip skins;
· Left and right wing leading edges;
· Left and right pylon leading edges;
· Left and right horizontal stabilizer leading edges; and
· Vertical stabilizer leading edge.
The completed surfaces shall be clean, uniformly polished, free of visible oxidation, staining, polish residue, haze, swirls, buffer burns, scratches caused by the work, and contamination. The Contractor shall use the least aggressive approved process necessary and shall not remove material beyond the limits permitted by the applicable technical data.
2.5 Corrosion-Protection Coating
After surface preparation and polishing, the Contractor shall apply Granitize Aviation Xzilon 3, or an approved equal meeting the salient characteristics below, to the surfaces identified by the applicable Gulfstream task. An equal product is acceptable only when the Contractor provides documentation demonstrating that the product:
· Is expressly accepted by Gulfstream or the Government’s designated engineering authority for the exact aircraft model, substrate, and application;
USCG AIR STATION WASHINGTON | AIRCRAFT POLISHING, CORROSION PREVENTION & CLEANING PWS
· Provides an additional protective layer intended to inhibit corrosion in corrosion-prone environments;
· Is chemically compatible with adjacent polished, painted, sealed, composite, acrylic, glass, and elastomeric surfaces;
· Has documented preparation, application, coating, cure, inspection, and maintenance instructions; and
· Provides performance equal to or greater than the reference product for the required service interval. The Contractor shall not use a substitute product until the CO provides written approval following technical review. If the Government elects to restrict competition to a specific brand name, the CO shall complete the applicable acquisition justification outside this PWS before solicitation or award.
2.6 Exterior Dry Wash and Ceramic-Coating Upkeep
The Contractor shall clean the complete authorized exterior using an aircraft-approved dry-wash or other Government-approved process. The Contractor shall inspect existing ceramic-protective coating for water spotting, contamination, loss of hydrophobic performance, streaking, chemical residue, and localized coating degradation. Reapplication or touch-up shall be performed only when authorized and in accordance with approved technical data. The Contractor shall prevent cleaner, polish, or coating material from entering drains, vents, static ports, probes, openings, or unprotected components.
2.7 Interior Deep Cleaning
The Contractor shall deep clean authorized interior surfaces, including seating surfaces, sidewalls, tables, galley and lavatory non-sensitive surfaces, storage areas, trim, flooring, and other areas identified by the Government. Cleaning products and methods shall be compatible with the materials being cleaned and shall not discolor, shrink, delaminate, stain, scratch, soften, or leave residue or objectionable odor.
Removal of flooring, carpet, furnishings, panels, or other aircraft-installed items shall occur only when authorized and under the coordination of designated Government aircraft-maintenance personnel. The Contractor shall not independently inspect for or disposition corrosion, perform maintenance sign-off, approve deviations, determine airworthiness, or return the aircraft to service. Observable discrepancies shall be protected from further disturbance and reported immediately.
2.8 Carpet Cleaning and Floor-Heating Protection
When directed, the Contractor shall remove aircraft carpets for cleaning and shall clean accessible areas around the floor-heating pad system without damaging wiring, connectors, insulation, heating elements, attachment points, flooring, or carpet materials. The Contractor shall use controlled temperature, moisture, chemical concentration, agitation, extraction, drying, handling, and storage methods that prevent shrinkage, distortion, dye transfer, delamination, mildew, or other damage.
The Contractor and Government representative shall verify carpet identification, orientation, pre-existing condition, and floor-heating system status before removal and after reinstallation. Any suspected damage, abnormal condition, or system discrepancy shall be reported immediately. Damage resulting from the Contractor’s failure to exercise reasonable care shall be corrected in accordance with the contract and the CO’s direction.
2.9 FOD, Tool Control, and Aircraft Protection
The Contractor shall maintain positive tool, equipment, consumable, and material accountability. At a minimum, the Contractor shall:
· Inventory tools and loose items before and after each work period;
· Use protective covers, mats, barriers, and masking approved for aircraft use;
· Keep cords, hoses, ladders, lifts, and equipment clear of aircraft surfaces and emergency routes;
· Immediately contain spills and notify the COR;
· Perform a FOD inspection of all work areas before Government acceptance; and
· Remove all waste, residue, masking, protective coverings, and Contractor property after completion.
2.10 Environmental, Safety, and Emergency Requirements
The Contractor is responsible for the safety and health of its employees and shall comply with applicable Federal, District of Columbia, airport, DHS, Coast Guard, and facility requirements, including applicable OSHA standards. The Contractor shall provide required personal protective equipment, hazard communication, SDS, fall protection, respiratory protection when applicable, chemical handling, spill response, and employee training.
At the kickoff meeting or before on-site performance, the Government will identify site emergency alarms, evacuation routes, assembly points, reporting procedures, restricted areas, and facility-specific hazards known to the Government. The Contractor shall brief its employees, maintain accountability for its personnel, and comply with Government emergency instructions. Nothing in this paragraph relieves the Contractor of responsibility for its own employees, equipment, chemicals, and work methods.
2.11 Damage and Discrepancy Reporting
The Contractor shall immediately stop the affected work and notify the COR of any damage, spill, suspected corrosion, loose or damaged component, abnormal system condition, or deviation from approved technical data. The Contractor shall submit a written incident or discrepancy report no later than the end of the workday, unless the CO or COR requires an earlier report. The Contractor shall not conceal, polish over, coat over, repair, or otherwise alter a discrepancy without written Government direction.
3.0 PERFORMANCE STANDARDS, INSPECTION, AND ACCEPTANCE
3.1 Contractor Quality Control
The Contractor shall establish and maintain a quality-control process sufficient to ensure that all services conform to the contract. The Contractor shall identify a quality-control representative who is independent of the person performing the final task inspection whenever staffing permits. Quality-control records shall be available to the CO and COR upon request.
3.2 Government Surveillance
The Government will inspect services in accordance with the contract and the QASP. Government surveillance does not relieve the Contractor of responsibility for quality control, safety, damage prevention, or full compliance. The COR may inspect work in progress, witness critical application steps, review documentation, and perform final acceptance inspections within the limits of the written COR designation. Only the CO may change contract requirements or authorize an equitable adjustment.
| Performance Area |
| Required Standard |
| Surveillance Method |
| Remedy for |
Nonconformance
| Pre-work condition survey |
| Completed jointly before work; documents existing condition, protected areas, and floor-heating status. |
| 100% document review and observation. |
| Do not begin affected work until accepted. |
Brightwork polishing
| Authorized metal surfaces are uniformly polished and free of visible oxidation, residue, haze, swirls, buffer burns, and Contractor-caused damage. |
| 100% visual inspection under normal hangar lighting; tactile check where appropriate. |
| Reclean or repolish using approved methods; repair damage as directed by CO. |
Corrosion-protection coating
| Correct approved product, lot, preparation, coverage, cure, and application conditions are documented and comply with approved technical data. |
| Witness critical steps as designated; 100% record review and visual inspection. |
| Remove/reapply only under approved technical direction; correct documentation. |
| Exterior dry wash / coating upkeep |
| Exterior is clean, dry, streak-free, and free of residue; openings and adjacent surfaces are uncontaminated and undamaged. |
| 100% visual inspection of serviced areas. |
| Reclean and correct before acceptance. |
Interior deep cleaning
| Serviced interior areas are clean, dry, odor-controlled, residue-free, and undamaged; no unauthorized disassembly. |
| 100% visual and functional inspection of affected areas. |
| Reclean, dry, reinstall, or repair as directed. |
Carpet and floor-heating protection
| Carpets retain correct size, shape, color, orientation, and attachment; floor-heating components and adjacent systems remain undamaged. |
| Joint before/after condition check; functional verification by authorized Government personnel. |
| Correct deficiencies; Contractor-caused damage handled under contract. |
| FOD (Foreign Object Debris)/ tool control |
| No tools, loose items, masking, residue, waste, or Contractor property remain in or around aircraft work areas. |
| 100% final FOD walkdown and tool inventory reconciliation. |
| Work area not accepted until cleared and reconciled. |
Completion documentation Complete, accurate, legible, and submitted by the due date, including materials, lot numbers, task references, personnel, discrepancies, and QC sign-off.
100% document review.
Correct and resubmit within two business days or sooner if directed.
3.3 Inspection and Acceptance
Acceptance will be documented by the CO or authorized COR after the Government determines that the required services and deliverables conform to the contract. Rejected work shall be corrected at no additional cost to the Government within the time directed by the CO. Acceptance does not waive latent defects, fraud, gross mistakes amounting to fraud, or rights provided by the contract.
4.0 CONTRACT ADMINISTRATION
4.1 Contractor Program Manager
The Contractor shall designate a Program Manager or on-site supervisor with authority to manage personnel, schedule work, coordinate access, resolve routine performance issues, and communicate with the CO and COR. The Program Manager shall be available during active work periods and shall provide current telephone and email contact information.
4.2 Personnel Qualifications
Contractor personnel shall be trained and experienced in aircraft brightwork polishing, aircraft-safe cleaning methods, chemical handling, FOD control, and the specific coating application tasks assigned. Personnel operating lifts or other powered equipment shall hold the training or certification required by applicable law, manufacturer instructions, and facility policy. The Government may request evidence of qualifications before work begins.
4.3 Identification and Facility Access
Contractor employees shall display Government-, airport-, or Contractor-issued identification as directed. Contractor identification shall, at a minimum, display the employee’s name, photograph, and employer. Access is limited to the areas and times necessary for contract performance. Contractor personnel shall comply with escort, screening, vehicle, tool, photography, electronic-device, and restricted-area requirements. Recurring access, information-resource access, or access to Controlled Unclassified Information (CUI), if later required, is subject to the applicable HSAR clauses and DHS security requirements included in the contract.
4.4 Employee Conduct
Contractor personnel shall maintain a professional appearance and conduct and comply with applicable Government, airport, fire, safety, sanitation, environmental, security, smoking, weapons, and restricted-area rules. The Contractor shall ensure that its personnel identify themselves as Contractor employees when their status is not otherwise apparent.
4.5 Removal of Contractor Personnel
The Government may deny access to or require removal of Contractor personnel for misconduct, safety violations, security concerns, lack of qualifications, or failure to comply with facility rules, consistent with the contract. Removal does not relieve the Contractor of its obligation to provide uninterrupted qualified performance. Only the CO may direct contractual remedies.
4.6 Organizational and Personal Conflicts of Interest
The Contractor shall avoid actual or apparent conflicts of interest and shall promptly disclose any potential conflict to the CO. The Contractor shall comply with applicable FAR conflict-of-interest requirements and shall not use nonpublic Government information for any purpose other than contract performance.
4.7 Place of Performance
Primary place of performance:
U.S. Coast Guard Air Station Washington 1 Aviation Circle, Hangar 6 Ronald Reagan Washington National Airport Washington, DC 20001 The Government shall confirm the official delivery, vehicle-access, and employee-reporting address before performance.
4.8 Period of Performance
| Performance Period |
| Dates From Source Document |
| Base Period |
| September 15, 2026- September 14, 2027 |
| Option Period 1 |
| September 15, 202- September 14 2028 |
| Option Period 2 |
| September 15, 2028 - September 14 2029 |
| Option Period 3 |
| September 15, 2029 - September 14 2030 |
| Option Period 4 |
| September 15, 2030- September 14 2031 |
4.9 Service Scheduling and Aircraft Availability
The COR will issue a written service request identifying the aircraft, authorized tasks, and required completion window. Unless otherwise established in the contract, the Contractor shall be prepared to complete the requested work within the 30-calendar-day service window specified by the Government. Aircraft availability is mission dependent. The Government may reschedule access; only the CO may authorize changes affecting price, scope, or period of performance.
4.10 Security and Escort
Access to classified systems, CUI, secure communications equipment, or restricted mission systems is not anticipated under this PWS. Contractor access shall be limited to the work areas necessary to perform the authorized services and shall be escorted when required by Air Station Washington or airport security procedures. The Contractor shall not photograph, record, copy, connect to, operate, or inspect Government information systems or mission equipment unless specifically authorized in writing.
4.11 Kickoff Meeting
The Contractor shall attend a kickoff meeting with the CO and COR no later than three business days after award, unless the CO approves a later date in writing. The meeting may be held by teleconference or in person. Topics shall include scope, schedule, points of contact, technical data, security and access, emergency procedures, aircraft protection, FOD control, Government-furnished property, deliverables, inspection, invoicing, and COR authority limitations.
4.12 Status Communications and Meetings
During active service events, the Contractor shall provide status updates at the frequency specified in the service request. Updates shall identify completed work, schedule status, planned next steps, discrepancies, safety issues, Government actions required, and potential schedule impacts. The Contractor shall attend progress meetings requested by the CO or COR when reasonably necessary to resolve performance issues.
4.13 Government-Furnished Property and Information
Subject to availability and contract authorization, the Government will provide:
· Access to the aircraft and authorized work areas;
· Current applicable Government-approved technical data or access to such data;
· Facility emergency and access information; and
· A scissor lift in safe, operable condition with current required inspections or certifications, when identified in the service request.
Before using Government-furnished equipment, the Contractor shall verify that its operator is qualified, perform required pre-use inspections, follow manufacturer and facility instructions, and immediately report deficiencies. The Contractor shall not use defective equipment. Government-furnished property shall be managed in accordance with the applicable contract clauses and the CO’s written direction.
4.14 Contractor-Furnished Property
Except for Government-furnished items expressly identified in the contract or service request, the Contractor shall furnish everything necessary to perform the work. Contractor-furnished equipment shall be suitable for aircraft use, maintained in safe condition, and protected against leakage, contamination, sharp edges, loose parts, and contact damage. Appendix B identifies the minimum anticipated categories of tools and materials.
4.15 Contracting Officer and COR Authority
The CO is the only Government official authorized to bind the Government, change contract terms, authorize out-of-scope work, modify price or schedule, or waive requirements. The COR may perform technical monitoring, inspection, coordination, and acceptance functions only within the written COR designation.
Contractor reliance on direction from any other person is at the Contractor’s risk unless confirmed by the CO.
4.16 Non-Inherently Governmental Functions
The services in this PWS are not intended to include inherently governmental functions. The Contractor shall not make final Government decisions, exercise command authority, direct Government personnel, approve technical deviations, accept services on behalf of the Government, determine airworthiness, or authorize aircraft return to service. These responsibilities remain with authorized Government officials.
4.17 Subcontracting
The Contractor may utilize subcontractors to perform the requirements of this PWS, subject to compliance with the applicable FAR clause 52.244-2 (Subcontracts). The prime Contractor remains fully responsible for all work performed by its subcontractors and shall ensure that all subcontractor personnel meet the exact same qualifications, security, conduct, and performance standards required of the prime Contractor's employees. The prime Contractor shall manage all subcontractor performance, quality control, and deliverables. The Government will interface primarily with the prime Contractor's Program Manager, who shall be responsible for resolving any subcontractor performance or administrative issues.
5.0 DELIVERABLES
| ID |
| Deliverable / Event |
| Minimum Content |
| Due Date |
| Recipient |
| D-1 |
| Kickoff Meeting |
| Attend and provide names/contact information for key personnel. |
| NLT 3 business days after award. |
| CO/COR |
D-2
| Quality-Control and Work Plan |
| Task sequence, staffing, schedule, protection, FOD/tool control, QC inspections, safety controls, and points of contact. |
| NLT 5 business days before each service event, unless otherwise approved. |
COR
D-3
Personnel/Access Roster
| Names, employer, role, access information, and qualification evidence as requested. |
| NLT 10 business days before initial facility access or as directed. |
| COR/Securit y |
| D-4 |
| Material List and SDS Package |
| Products, manufacturers, part numbers, lot/expiration information when available, SDS, and substitution requests. |
| NLT 5 business days before use. |
| COR/Techni cal Reviewer |
| D-5 |
| Pre-Work Condition Report |
| Joint survey of aircraft and affected systems, including photos only when authorized. |
| Before starting work on each aircraft. |
| COR |
| D-6 |
| Status Report |
| Progress, schedule, discrepancies, safety issues, and Government actions required. |
| Daily during active work or as specified in service request. |
| COR |
D-7
Incident/Discrepancy Report
Description, location, time, personnel, immediate actions, photos if authorized, and recommended next step.
Immediate verbal notice; written report by end of workday unless sooner directed.
CO/COR
D-8
| Completion and QC Report |
| Aircraft/task, technical-data revision, products and lot numbers, areas serviced, dates, personnel, QC results, discrepancies, and certification of FOD/tool reconciliation. |
| NLT 1 business day after completing each service event. |
D-9
Corrected Deliverable
Correct deficiencies identified by Government review.
Within 2 business days of rejection or sooner if directed.
Deliverable acceptance does not authorize payment unless all invoicing and acceptance requirements in the contract are satisfied. Electronic format shall be searchable PDF or Microsoft Office format unless the COR specifies otherwise.
6.0 APPLICABLE REFERENCES
The following references informed this revision or may apply to performance and administration. The CO shall determine which provisions and clauses are included in the solicitation and contract. Contractors are bound only by the contract, incorporated requirements, and applicable law—not by this reference list alone.
| Reference |
| Application to This Requirement |
FAR 7.503
Official source Policy concerning inherently governmental functions.
FAR 11.104
Official source Use of brand name or equal purchase descriptions and salient characteristics.
FAR 11.105
Official source Items peculiar to one manufacturer; brand-name restrictions require supporting justification.
FAR 37.601-37.604
Official source Performance-based service requirements, measurable standards, PWS content, and QASP.
FAR Subpart 46.4 Official source Government contract quality assurance and surveillance planning.
FAR 52.237-2
Official source Protection of Government Buildings, Equipment, and Vegetation, when included by the CO.
| FAR 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements |
| FAR 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab |
| FAR 52.204-25 |
| Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment |
| 52.244-2 |
| Subcontracts. |
HSAR 3052.204-71
Official source Contractor Employee Access, when applicable and included in the contract.
HSAR 3052.242-72
Official source Contracting Officer’s Representative.
| DHS Security and Training Requirements for Contractors Official source |
| DHS contractor security policies and training resources, when applicable. |
COMDTINST M5100.47D, Change 1 Official source Coast Guard Safety and Environmental Health Manual.
| COMDTINST M13020.1 (series) |
| Coast Guard Aeronautical Engineering Maintenance Management Manual, current applicable edition. |
| Current Gulfstream technical data |
| Applicable CMP, AMM, Aircraft Outfitting Cleaning Manual, and product application instructions supplied or approved by the Government. |
29 CFR Part 1910 Official source OSHA general industry safety and health standards, as applicable.
7.0 ACRONYMS AND DEFINITIONS
| Term |
| Definition |
| AMM |
| Aircraft Maintenance Manual |
| CMP |
| Computerized Maintenance Program |
| CO |
| Contracting Officer |
| COR |
| Contracting Officer’s Representative |
| CUI |
| Controlled Unclassified Information |
| FAR |
| Federal Acquisition Regulation |
| FOD |
| Foreign Object Debris |
| GFP |
| Government-Furnished Property |
| HSAR |
| Homeland Security Acquisition Regulation |
| IAW |
| In Accordance With |
| NLT |
| No Later Than |
| Term |
| Definition |
| O/C |
| On Condition |
| PWS |
| Performance Work Statement |
| QASP |
| Quality Assurance Surveillance Plan |
| QC |
| Quality Control |
| SDS |
| Safety Data Sheet |
| USCG |
| United States Coast Guard |
APPENDIX A - MAINTENANCE TASK MATRIX
| CMP Nomenclature |
| Interval |
| CG-101 / C-37A |
| CG-102 / C-37B |
| CG-103/104 / C-39A |
| Wing leading-edge Xzilon coating application |
| 12 months |
| 510012 |
| 510012 |
| 510012.024 |
| External metallic surfaces - polish |
| On condition |
| 510013 |
| 510013 |
| 512413.024 |
| Pylon leading edge (left) - polish |
| 12 months |
| 545003 |
| 545003 |
| Not provided |
| Pylon leading edge (right) - polish |
| 12 months |
| 545004 |
| 545004 |
| Not provided |
| Horizontal stabilizer leading edge (left) - polish |
| 12 months |
| 551113 |
| 551113 |
| 551117.024 |
| Horizontal stabilizer leading edge (right) - polish |
| 12 months |
| 551114 |
| 551114 |
| 551118.024 |
| Vertical stabilizer leading edge - polish |
| 12 months |
| 553013 |
| 574013 |
| 553101.024 |
| Wing leading edge (left) - polish |
| 12 months |
| 574013 |
| 574013 |
| 573200.024 |
| Wing leading edge (right) - polish |
| 12 months |
| 574014 |
| 574014 |
| 573201.024 |
| Inlet cowl lip skin (left) - polish |
| 12 months |
| 711109 |
| 711109 |
| 711110.024 |
| Inlet cowl lip skin (right) - polish |
| 12 months |
| 711110 |
| 711110 |
| 711111.024 |
| Complete airframe dry wash / ceramic upkeep |
| 6 months |
| 510014 |
| 510014 |
| 510014.024 |
| Interior detail - IAW Aircraft Outfitting Cleaning Manual |
| 12 months |
| 122609 |
| 122609 |
| 122609.024 |
| Carpet cleaning - IAW Aircraft Outfitting Cleaning Manual |
| 12 months |
| 122602 |
| 122602 |
| 122602.024 |
APPENDIX B - CONTRACTOR-FURNISHED TOOLS, EQUIPMENT, AND MATERIALS
The Contractor shall provide the following minimum categories, plus any additional items required by the approved technical data. Brand names and part numbers are reference products only unless the solicitation includes an approved brand-name restriction. Products shall be those specified by the current approved technical data or an approved equal accepted in writing.
| Category |
| Minimum Anticipated Items |
| Performance / Control Requirement |
| Polishing equipment |
| Cyclo-orbital/orbital polisher; rotary buffer; approved cotton, wool, foam, or other pads required by technical data. |
| Equipment shall be clean, maintained, and configured to prevent heat, abrasion, impact, or contamination damage. |
Access and protection
| Contractor access equipment unless GFP is authorized; aircraft-safe ladders/platforms; masking tape; plastic/paper protective covering; mats; barriers. |
| No sharp edges or unprotected contact points; comply with facility and aircraft-clearance limits. |
Cleaning equipment
| Spray bottles, extraction equipment, brushes, applicators, lint-free cloths/wipers, synthetic cloths, terry cloths, and red felt applicators as required. |
| Clean and dedicated to compatible materials to prevent cross-contamination. |
Water and solvents
| Distilled water; isopropyl alcohol meeting applicable technical requirements such as TT-I-735 or ASTM D770; alternate solvents meeting AMS 1530 when authorized. |
| Use only products permitted by current approved technical data; control ignition and ventilation hazards. |
| Category |
| Minimum Anticipated Items |
| Performance / Control Requirement |
Exterior cleaners and polish
Aircraft-approved detergent, dry-wash cleaner, metal polish, residue remover, and surface-preparation materials.
Examples from the source draft included Simple Green Extreme and Granitize/Nuvite products; any brand-specific use requires technical approval and applicable acquisition treatment.
| Protective coating |
| Granitize Aviation Xzilon 3 kit and associated products, or approved equal meeting Section 2.5. |
| Document product, part number, lot number, expiration, storage, preparation, application, and cure. |
Interior products
| Aircraft-approved leather cleaner/protectant, hard-surface cleaner, carpet detergent, odor treatment, and extraction/rinse products. |
| Products shall be compatible with aircraft materials and shall not leave harmful residue or odor. |
| Safety and environmental |
| PPE, spill kit, chemical containers, labels, SDS, waste containers, ventilation/respiratory equipment as applicable, and fire-safe storage. |
| Comply with OSHA, facility, airport, DHS, Coast Guard, and product requirements. |
| Tool and FOD control |
| Tool inventory system, parts/consumable accountability, bags/containers, and FOD inspection materials. |
| Positive accountability required before final Government acceptance. |
| Address verification |
| Confirm official street, delivery, vehicle-gate, and employee-reporting addresses for Hangar 6. |
| COR / Facility |
| Open |
GOVERNMENT APPROVAL
The undersigned confirm that the technical requirements, task numbers, aircraft identifiers, schedule, security requirements, Government-furnished property, performance standards, and deliverables have been reviewed and are accurate for solicitation release.
DAVIS.GARRETT.B Digitally signed by
+ENJAMIN.13939178 DAVIS.GARRETT.BENJAMIN.1393917896
04AUG26
| 96 | Date: _2026.08.04 12:45:17 -04'00' |
| Technical/Aviation Engineering Reviewer | Date |
Contracting Officer’s Representative Date Domingo Cruz Jr.
Digitally signed by Domingo Cruz Jr. Date: 2026.08.07 14:55:20 -04'00'
Contracting Officer Date image1.png image2.png
File details come from the government source that posted it. Updated .