Central_Library_Retrofit_Project_Building_and_Fire_Plan_Review_Services.pdf
PDF 468 KB Posted
- Solicitation number
- 2024-RFP-0566
- Issued by
- Los Angeles County, California
About this file
This is a Request for Proposals (RFP) issued by the City of Pasadena, California for Central Library Retrofit Project Building and Fire Plan Review Services. The City seeks qualified professionals to provide comprehensive building, fire, and related plan review services for the seismic retrofit and repair of the historic Pasadena Central Library located at 285 East Walnut Street. The project involves plan reviews for structural safety, life-safety compliance, emergency egress, accessibility, fire prevention, electrical, mechanical, plumbing, and energy conservation systems. The RFP was released on August 1, 2024, with proposal submissions due by 3:00 pm on August 14, 2024. The contract term is initially three years with two optional one-year extensions, subject to approval by the City Manager.
Proposers must submit detailed technical and price proposals electronically through the City's eProcurement Portal, with a total page limit of 50 pages for technical materials. The evaluation will be based on a weighted scoring system, with points allocated across six categories: proposed solution (10%), experience and references (35%), company staffing (25%), cost proposal (20%), local Pasadena business preference (5%), and small/micro-business certification (5%). Funding for the project will come from Bond Measures, and the selected consultant will be required to perform plan reviews in compliance with various California building codes, fire codes, and municipal regulations. Key requirements include having International Code Council certified plans examiners or licensed professional engineers, with a maximum 20-working-day turnaround for initial plan reviews.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
FURNISH AND DELIVER
CENTRAL LIBRARY RETROFIT PROJECT BUILDING AND
FIRE PLAN REVIEW SERVICES
FOR THE
PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF PASADENA, CALIFORNIA
Request for Proposals - Central Library Retrofit Project Building and Fire Plan Review Services Release Date: Thursday, August 1, 2024
Attachments:
A - Master Services Contract B - REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION (27)
D - DISQUALIFICATION_DISCLOSURE (4)
E - CONFLICT_OF_INTEREST (5)
F - Pasadena_Taxpayer_Protection_Amendment_Disclosure (2) H - DESIGNATED REPRESENTATIVESdocx
I - RELEVANT EXPERIENCE FORM
1. Introduction
1. Summary
The City of Pasadena is seeking qualified professionals to provide Building, Fire and related plan review services for the seismic retrofit and repair of the historic Pasadena Central Library located at 285 East Walnut Street.
2. Background
The City of Pasadena is an ethnically diverse community that is home to approximately 142,017 people. Pasadena is the ninth-largest city in Los Angeles County. It is one of the primary cultural centers of the San Gabriel Valley. The City covers approximately 22.5 square miles, with an average of ten residents per acre. The median age of its residents is approximately 36.9 years.
There are over 100,000 jobs in a wide variety of industries in the City of Pasadena.
This project will be funded through Bond Measures and the proposal seeks a fixed cost for a multi-year project related to the seismic retrofit and repair of the historic Pasadena Central Library. For additional background information for this project visit:
https://www.cityofpasadena.net/library/central-library-earthquake-retrofit/
3. Contact Information
Deadline for Questions
The deadline to submit questions related to this solicitation is Wednesday, August 7, 2024, prior to 4:00 pm.
Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered.
Procurement Contact:
Antonio Watson awatson@cityofpasadena.net
(626) 744-8382
Lauren Tessier Management Analyst I Email: ltessier@cityofpasadena.net Phone: (626) 744-6833 Department:
Planning & Community Development Department
4. Timeline https://www.cityofpasadena.net/library/central-library-earthquake-retrofit/ mailto:ltessier@cityofpasadena.net tel:(626)744-6833
Release Project Date August 1, 2024
Question Submission Deadline August 7, 2024, 4:00pm
Proposal Submission Deadline August 14, 2024, 3:00pm
2. General Instructions
1. NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT
All responses to this Request for Proposal (RFP) accepted by the City of Pasadena (City) shall become the exclusive property of the City. At such time as the City Manager recommends a contractor to the City Council, and such recommendation, with any recommended contract appears on the Council agenda, all proposals accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof.
2. Eligibility Requirement
Proposer must possess and provide the following licenses or certifications to be deemed qualified to perform the work specified:
PE - Professional Engineer
3. Electronic Submission and Delivery Instructions
Parties interested in responding are required to submit proposals electronically through the City of Pasadena's eProcurement Portal no later than 3:00 pm on Wednesday, August 14, 2024.
Please upload sufficiently early electronically through the city's eProcurement Portal before the time and day listed in the Notice Inviting Proposals. Proposals must be received in the system prior to the deadline.
The entire proposal must be formatted on standard-size 8½”x11” pages; 12 point font only. The "Technical Proposal," "Additional Data," and "Statement of Qualifications" can be no more than 50 grand total pages.
The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “#Proposer's Submittals/Checklist.”
The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments, and #Proposer's Submittals/Checklist. No Pricing shall be included in this part.
Proposals received after the Proposal Deadline may not be accepted by the City.
4. Separation of Technical, and Price Proposals https://procurement.opengov.com/portal/pasadena https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=969246 https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=969252 https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=969246
The proposal must be prepared in two parts: a "Technical Proposal" and a "Price Proposal." Each of the parts shall be separate and complete in itself so evaluation of one may be accomplished separate from the evaluation of the other.
1. The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “Submittals/Checklist.”
Parties interested in responding are required to submit their Price Proposal with their Technical proposal through the City's eProcurement Portal.
The pricing must include the total price proposed to accomplish all the performance and deliverables requested in this RFP, and offered by your firm. Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The price proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The price proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for all materials and supplies.
The fee information is relevant to a determination of whether the fee is fair and reasonable in light of the services to be provided. Costs shall include the proposed costs and, if necessary, the approximate number of hours to provide the services as described in your proposal. Any additional fees outside the scope of the agreement must be approved in writing before commencing services for said fees. Vendor’s RFP response must be inclusive of all costs and expenses associated with travel, lodging, and any other incidental costs. The City will not separately reimburse costs not included in the proposal.
2. The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments, and Submittals/Checklist. No Pricing shall be included in this part.
Reference SAMPLE PRICE PROPOSAL.
Reimbursable cost schedules shall depict only those expenditures that are exclusive to and in support of the scope of services. The proposed reimbursable cost schedule shall include a detailed list of reimbursables.
A contract will not be awarded to a consultant without an adequate financial management and accounting system as required by 48 CFR Part 31 and 2 CFR Part 200.
Each Proposer must submit a PRICE Proposal containing all costs associated with the technical proposal. Using the attached Price Proposal in this RFP, provide Proposer’s lump-sum price for performing all services and work called for in the SCOPE OF WORK. The Proposer’s lump-sum price shall include, without limitation:
• all designs, equipment, materials, labor, insurance and bond premiums, home office, jobsite, and other overhead, profit and services relating to the Proposer’s performance of its obligations under the Contract (including all work, equipment, materials, labor, and services provided by subcontractors and intellectual property rights necessary to perform the work);
performance of each and every portion of the work https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=969246 https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=969252 https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=969246
• all costs of obtaining Government approvals other than Government approvals that are the responsibility of the City of Pasadena;
• all costs of compliance with Government rules, except to the extent such compliance is the responsibility of the City of Pasadena;
• all taxes, duties, permits, and other fees or royalties incident to the performance of the
SCOPE OF WORK;
payment of all salaries, wages, benefits, and expenses of the Proposer’s employees;
compensation for all risks, liabilities, and contingencies assigned to the Proposer; and
• all other costs needed or incurred to complete the Project.
5. Pre-Proposal Meeting
See the "Timeline" in the Introduction section (#Introduction). If there is a Mandatory pre-proposal meeting, bidders/proposers are required to attend at the time, date, and location included in the Timeline. If there is a Non-Mandatory pre-proposal meeting, bidders/proposers are not required to attend.
Each bidder/proposer will have the opportunity to clarify and ask questions regarding the Specifications. The Pre-Proposal Meeting will be held at the time, date, and location in the Timeline of this solicitation.
6. Definitions
The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this RFP, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract.
https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=969248
3. Scope of Work
1. Objective
The City of Pasadena Planning & Community Development Department, Building and Safety Division is seeking the services of qualified consulting firms to submit proposals to provide plan review and supplemental services for the Pasadena Central Library seismic retrofit project. The objective includes responsibility for conducting plan reviews in compliance with the California Building Standard Codes, Pasadena Municipal Code, California Fire Code and other Fire and Life Safety provisions, and all other State, local, and applicable laws; in order to meet plan review turnaround times.
This project includes, but is not limited to, the seismic retrofit, structural strengthening, building repairs, building code compliances, and programmatic improvements to the Pasadena Central Library. The project will address safety compliance of the unreinforced masonry (URM) elements of the library, provide enhanced fire safety and emergency egress, current accessibility compliance for Persons-With-Disabilities, and upgrades to the building’s electrical-mechanical-plumbing systems – all encompassing with historic preservation importance.
2. Scope of Work
Overview
The City of Pasadena Planning & Community Development Department, Building and Safety Division is seeking the services of a plan review consulting firm to submit proposals to provide peer review during the design consultation phase, and building and fire plan review services for the Pasadena Central Library seismic retrofit project. The Consulting firm must show substantial knowledge and experience in Building and Fire plan review verifying compliance with the California Building Standards Code, California Fire Code and Life and Safety provisions, Pasadena Municipal Code, and other related codes and ordinances applicable to the Central Library seismic retrofit project. The successful consultant will be dependable, cost-effective, and have expertise in building construction and building codes, high quality plan review services, and the ability to meet expected plan review turnaround times.
The selected Consultant will be required to receive electronic plans within 24 hours of notification by the City. The selected consultant must have capabilities to accept and perform electronic plan checks.
Upon completing each initial or subsequent review, the selected consultant shall notify all corrections directly to the applicant with a copy of the transmittal and corrections list sent to the City’s Building Official, and other designated City staff electronically (email). Upon final review and approval, two sets of the approved construction plans bearing the consultants seal and dated signature, shall be returned to the City for permit issuance.
Requirements
Consultants responding to this RFP shall propose a solution to the City of Pasadena Central Library complex seismic retrofit project. The proposal shall provide clear examples of successful plan review services for public development projects; demonstrating, at a minimum, the ability to provide the qualifications, experience, and knowledge outlined within this RFP.
The selected Consultant will be expected to review architectural, structure, electrical, mechanical, plumbing, drainage, accessibility, energy, green building, landscape, fire and life safety plan reviews and reports for compliance with the California Building Standards Codes, California Fire Code, Pasadena Municipal Code, and other applicable Federal, State and local laws, polices, ordinances and regulations, which is including but not limited to the:
• 2022 California Building Code (Volume 1 & 2)
• 2022 California Residential Code
• 2022 California Electrical Code
• 2022 California Mechanical Code
• 2022 California Plumbing Code
• 2022 California Energy Code
• 2022 California Green Building Standards Code
• 2022 California Fire Code including other Fire and Life Safety provisions
• Pasadena Municipal Code
• All related State and Local codes adopted by the City of Pasadena and future adopted codes and ordinances during the contract term.
• All California adopted Codes
The selected plan review consultant shall be qualified to review and provide comments for design consultation and the building and fire plan review of the following building and fire systems for compliance with the Pasadena Building and Fire codes and other applicable State and national standards:
A. Structural safety - including seismic retrofit of URM elements
B. General life-safety compliance
C. Egress / emergency exit
D. Accessibility for Persons-With-Disabilities
E. Fire prevention compliance including sprinkler, alarm, water supply, and Emergency Responder Radio Coverage (DAS)
F. Electrical code compliance including coordination with Pasadena Water & Power (PWP)
G. Mechanical code compliance including the proposed ducting system
H. Plumbing code compliance including all drain, waste, venting systems
I. Energy conservation for new lighting, heating & cooling equipment, and zone controls
J. Green Building compliance as required for existing buildings
K. Drainage and Low-Impact Development (LID) compliance
L. California Historical Building Code compliance where applicable
Qualifications/Expectations
All plan review services shall be performed by International Code Council (ICC) certified plans examiners and/or licensed professional engineers (State of California), with extensive experience in plan review. Seismic review services shall be performed by a California licensed Structural professional engineer. All staff utilized by the selected Consultant shall be appropriately licensed, registered, and certified as required by the State of California and the City to perform the scopes of work.
Consultant shall work closely with the applicant/design team during design consultation phase providing Code consultation. The maximum hours allotted shall include, and not exceed the approximate hours noted in the price proposal for both design consultation and plan review services. All plan review correction materials including marked up plans, documents, and plan check correction lists shall be provided in the City desired format to the City representative immediately upon completion of the plan review. This process includes delivery of a hard copy of the reviewed plan, correction list and a soft copy emailed to the City, at no extra cost.
Provide plan check status reports, statistical reports, and performance and management reports, on a regular basis or upon request of the City in the format type requested by the City (electronic). Consultant shall maintain a log available to the City in electronic format using software approved by the City (for example, Microsoft Excel, or company’s electronic file), of the plan review. The electronic plan review log shall contain the following information, at a minimum:
• The dates plans were received, reviewed, and checked;
• Reviewers name, title, rates, and contact information;
• All comments/corrections made to the applicant; and
• The dates the applicants were notified.
In order to meet established standards, the expected turnaround time for this "large" project, is as follows:
• Twenty (20) working days for large projects from the date of notification to perform initial plan reviews.
The selected plan review consultant shall be available to the applicant and City personnel for meetings upon request. The consultant shall have the capability to perform and/or conduct meetings in person, via teleconferencing, virtual or other means of communication.
Consultant may perform other services such as: peer design review, meetings prior to plan review submission, consultation to the Building Official, and other related tasks as requested by the Building Official. Such services shall be billed on an hourly basis.
4. City Requirements
There are forms included in the section named Submittal/Checklist of these specifications which a bidder or proposer must complete to establish compliance with a number of City Requirements, including, but not limited to, equal employment opportunity and affidavit of non-collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them may be grounds, in the sole discretion of the city, for rejection of any bidder or proposer.
1. Pasadena Operating Companies
If this solicitation is issued by an Operating Company of the City of Pasadena including the Pasadena Center Operating Company; or Rose Bowl Operating Company; or Pasadena Community Access Corporation: In this solicitation, any reference to the City, shall actually refer to the PCOC, PRHB, or RBOC, or PCAC, e.g. "City" shall refer to the Operating Company, "City Council" to its Board of Directors, and "City Manager" to its Chief Executive Officer.
2. Equal Employment Opportunity in Contracting
Policy - The City of Pasadena is committed to a policy of Equal Employment:
• Contracting. Contractors expressly agree to comply with the City’s ordinances and regulations regarding Equal Opportunity Employment as well as regulations that may be mandated by the source of the funds supporting this contract.
Compliance – To the extent permitted by law, Contractor expressly agrees to establish compliance with the Equal Employment Opportunity Practices Provisions of Chapter 4.08 of the Pasadena Municipal Code, and the Rules and Regulations adopted pursuant to said ordinance.
The successful bidder or proposer may be required to submit documentation during the term of the contract to evidence on going compliance with the City’s Equal Opportunity Practices Provisions. Such documentation may include, but not be limited to certified payroll records and Current Permanent Workforce Utilization reports.
Required Forms – Each bidder or proposer must submit a completed Form AA-1. Failure to submit this form will result in automatic disqualification with no exceptions unless bidder or proposer has an approved Form on file with the City.
Questions regarding Chapter 4.08 of the Pasadena Municipal Code and regulations adopted pursuant thereto should be directed to the Department of Finance, Purchasing Division 626.744.6755.
3. Declaration of Non-Collusion by Contractor
This form is only applied for formal solicitations $75,000 or more. The City requires that each bidder or proposer executes and submits to the City with the Bid/Proposal, the attached Declaration of Non Collusion in the #Bidder's Submittals/Checklist.
4. SAMPLE CONTRACT
A sample of the contract the successful vendor will be required to enter into with the City is attached hereto and by this reference incorporated herein and made part of this solicitation.
5. CHANGE ORDER MANAGEMENT
Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City in writing before work is started.
6. Local Preferences
The City of Pasadena is committed to promoting the economic health and well being of its residents. To this end, contractor agrees to recruit Pasadena residents initially and to give them preference, if all other factors are equal, for any new positions that result from the performance of this contract and which are performed within the City.
7. Pasadena Business License
Awarded bidder or proposer may be required to obtain and pay for any required business license under Title 5 of the Pasadena Municipal Code.
• If the business will not come into the City for the purpose of providing services for this contract they are not required to obtain a business license.
• If the business will only be coming into the city no more than 10 times to work on projects, they are charged 33% of the annual tax (5.04.130C)
• If they come into the City more than 10 times they are required to pay the annual fee.
• Any subcontractors used by the awarded bidder or proposer will be required to obtain a license if they will be coming into the City to perform services.
For further information contact Municipal Services Department at (626) 744-4166, Monday- Friday between 7:15 am and 5:15 pm. Additional Information regarding business license fees can be found here: https://www.cityofpasadena.net/finance/licenses/business-licenses/
8. Invoice Submission Portal
Invoice Submission Portal https://procurement.opengov.com/governments/portal/pasadena/projects/106560/document?section=undefined https://www.cityofpasadena.net/finance/licenses/business-licenses/
The invoice submission process is activated when an invoice is submitted through the Vendor Invoice Portal. Invoices submitted are automatically sent to the department being invoiced for review. Once the city department verifies its accuracy, the department will submit the invoice to Accounts Payable for payment processing. One final review and approval by the department who was invoiced is needed in order for a check to be issued. Checks are issued on Tuesday and Thursday.
How to submit invoices to the City of Pasadena?
Create an account: Visit the City’s Invoice Submission website:
https://invoice.cityofpasadena.net/ and select “Create Account”
Refer to the "Invoice Submission Portal - Vendor User Guide" for detailed instructions.
9. Acceptance of Conditions
By submitting a bid or proposal, each bidder or proposer expressly agrees to and accepts the following conditions:
• All parts of the Instructions to bidder or proposer and Specifications will become part of the Contract between the selected bidder or proposer and the City;
• The City may require whatever evidence is deemed necessary relative to the bidder or proposer financial stability and ability to complete this project;
• The City reserves the right to request further information from the bidder or proposer, either in writing or orally, to establish any stated qualifications;
• The City reserves the right to solely judge the bidder or proposer representations, and to solely determine whether the bidder or proposer is qualified to undertake the project pursuant to the criteria set forth herein. The bidder or proposer, by submitting a bid, expressly acknowledges and agrees that the judgment of the City as to whether or not the bidder or proposer is qualified to perform the project, shall be final, binding and conclusive;
• The City reserves the right to reject all bids, waive any irregularity in any of the bids, or cancel or delay the project at any time;
• This bidding process does not commit the City to award any contract, and the City is not liable for any costs incurred by the bidder or proposer in the preparation and submission of a bid.
10. Pasadena Living Wage Ordinance
If this purchase includes a service, and the contract total is at $25,000 or more, it is then subject to the City of Pasadena's Living Wage Ordinance, Pasadena Municipal Code Chapter 4.11. The ordinance requires that contractors providing labor or services to the City under contracts in excess of $25,000 pay no less than the City’s Living Wage to all employees who spend any of their time providing labor or delivering services to the City.
https://invoice.cityofpasadena.net/PortalGuide.pdf
The selected contractor will be required to evidence compliance with the Living Wage Ordinance by submitting payroll records as requested by the City. Each record shall include the full name of each employee performing labor or providing services under the contract; job classification; rate of pay and benefit rate.
Failure to comply with the provisions of the Pasadena Living Wage Ordinance is grounds for termination of the contract and a basis for penalties as stated in Pasadena Municipal Code Chapter 4.11. Questions concerning the Pasadena Living Wage Ordinance should be directed to:
Finance Department Purchasing Division 626-744-6755 - phone 626-744-6757 – fax
Please visit https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ for the current calendar year Pasadena Living Wage rate.
11. PAYMENT OF A CITY-WIDE MINIMUM WAGE
If a vendor is providing labor for any subsequent contract resulting from this solicitation, they must comply with the City of Pasadena Minimum Wage as set forth in Chapter 5.02 of the Pasadena Municipal Code. Vendors are encouraged to review the City’s minimum wage information guide at (https://bit.ly/3o3SHMh). The minimum wage ordinance may be found at Pasadena Municipal Code.
12. Errors and Omissions
Bidders or Proposers shall not be allowed to take advantage of any errors or omissions in the Instructions to Bidders/General Instructions or Specifications/Scope of Work. Full instructions will be given if such error or omission is discovered and timely called to the attention of the City.
13. Patent Fees; Patent, Copyright, Trade Secret, and Trademark Fees
Each bidder or proposer shall include in the price bid any patent fees, royalties and charges on any patented article or process to be furnished or used in the prosecution of the Work.
14. Taxes
Price bid or Price Proposals shall include all federal, state, local and other taxes.
15. Certificate of Insurance
Proof of insurance is not required to be submitted with your bid/proposal, but will be required prior to the City's award of the contract. Refer to the Insurance requirements in the "Insurance Requirements" section of this document.
16. REQUEST FOR TAXPAYER IDENTIFICATION NUMBER AND CERTIFICATION (IRS Form W-9) https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fbit.ly%2F3o3SHMh&data=05%7C02%7Cawatson%40cityofpasadena.net%7Cbb892f95fde0404d371508dc9bbbf790%7C82d9fc002c664402a28fc6bcdc32e491%7C1%7C0%7C638556478819490734%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=zhx6795nsAtQnJvmzYHL5q2Lzw%2FdOCl95da3qPj4Duw%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Flibrary.municode.com%2Fca%2Fpasadena%2Fcodes%2Fcode_of_ordinances%3FnodeId%3DTIT5BULIRE_ARTIGE_CH5.02PACIDEMIWA&data=05%7C02%7Cawatson%40cityofpasadena.net%7Cbb892f95fde0404d371508dc9bbbf790%7C82d9fc002c664402a28fc6bcdc32e491%7C1%7C0%7C638556478819500215%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=AX1DEPBi2FxNNRsdiRGGB1whWvtl2jG%2FQ7SO5QsB%2Fac%3D&reserved=0
The winning proposal/bid may be required to submit a completed and signed IRS Form W-9.
Failure to submit this form may result in the response being deemed non-responsive.
Link: https://www.irs.gov/pub/irs-pdf/fw9.pdf
17. LIMITATIONS ON LIABILITY
Bidders acknowledge that they shall provide the goods and/or services without monetary limitations on liability. If Bidders take exception to this requirement, Bidders shall expressly state any exceptions, including the proposed limits of liability, (a) in detail; (b) as a separate line item;
and (c) not part of any form documents submitted. Bidders acknowledge that any exceptions may result in a finding of non-responsivness.
18. Recycled Product Procurement Mandates Pertaining to Local Governments [22150 - 22154]
This section is only applied when buying paper products.
Beginning January 1, 2022, SB 1383 requires jurisdictions (cities, counties, cities and counties, or special districts that provide solid waste collection services) to purchase recycled-content paper products that are recyclable.
SB 1383 builds upon existing laws that require jurisdictions to purchase products that contain minimum recycled content, and adds additional requirements on product recyclability and recordkeeping.
All vendors providing Paper Products and Printing and Writing Paper shall:
• Provide products that contain no less than 30% minimum recycled content and recyclability (described in further detail in State of California, PCC Sections 22150-22154, under the sections “Recycled-Content Requirements” and “Recyclability Requirements”.
• Provide a written certification and other verification from product vendors, as applicable, certifying that the products meet the recycled-content and recyclability requirements.
19. Compliance with the Levine Act (Government Code Section 84308)
The Levine Act precludes an officer of a local government agency, including an elected official, from participating in the award of a contract if he or she receives any political contributions totaling more than $250 in the 12 months preceding the pendency of the contract award, and for 12 months following the final decision, from the person or company awarded the contract.
Proposers should ensure their employees, agents, and consultants are aware of the requirements of the Levine Act before the proposal is submitted, so as to avoid inadvertent violations.
20. AVAILABILITY OF FUNDS
https://www.irs.gov/pub/irs-pdf/fw9.pdf https://www.irs.gov/pub/irs-pdf/fw9.pdf https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fleginfo.legislature.ca.gov%2Ffaces%2Fcodes_displayText.xhtml%3FlawCode%3DPCC%26division%3D2.%26title%3D%26part%3D3.%26chapter%3D3.5.%26article%3D&data=05%7C01%7Cawatson%40cityofpasadena.net%7C307f17457fcb49d363c108dbba309d38%7C82d9fc002c664402a28fc6bcdc32e491%7C1%7C0%7C638308490511442074%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=kSzPLWUdh6HYJTjfSaMqzITXO6TDf1tcUTo%2BcAV5SJw%3D&reserved=0
The provisions of this Contract relating to payment for products or services shall become effective when funds assigned for the purpose of compensating the Contractor as herein provided are actually available to for disbursement. The City shall be the sole judge and authority in determining the availability of funds under this Contract. If any action is taken by the City, any state agency, Federal department or any other agency to suspend, decrease, or terminate its fiscal obligations under, or in connection with, this Contract, the City may amend, suspend, decrease, or terminate its obligations under, or in connection with, this Contract. In the event of termination, The City shall be liable for payment only for products provided or services rendered prior to the effective date of the termination, provided that such products or services were provided or performed in accordance with the provisions of this Contract.
21. Addenda
If any person contemplating submitting a proposal of the items or services listed herein is in doubt as to the true meaning of any part of this RFP, he/she may submit a question through the City's eProcurement Portal Q&A section for an interpretation or correction thereof.
Any interpretation or correction of City specifications will be made only by addendum, duly issued by the City representative(s) identified in this solicitation, above. Addenda (if any) shall be made available on the City's eProcurement system, and sent to each vendor included on the "Followers" list in the City's eProcurement system. A vendor's failure to address the requirements of any and all addenda may result in the response (proposal or bid, or alike) not being considered. If the City determines that a time extension is required for the proposal, the City will issue an addendum that will give the new submission date. The vendor is responsible to register on the City's eProcurement Portal and follow the project named Central Library Retrofit Project Building and Fire Plan Review Services in order to be included in the "Followers" list in the City's eProcurement system to insure they receive all documents including addendums which are available as a download.
The City reserves the right to change any part of these Instructions to PROPOSERS and Specifications any time prior to Deadline for Submissions. Any changes shall be in the form of addenda and will become a part of the Proposal documents and of the contract.
https://procurement.opengov.com/portal/pasadena
5. Insurance Requirements
1. Insurance Requirements https://www.cityofpasadena.net/finance/wp-content/uploads/sites/27/Professional- Services.pdf?v=1623280176766 https://www.cityofpasadena.net/finance/wp-content/uploads/sites/27/Professional-Services.pdf?v=1623280176766 https://www.cityofpasadena.net/finance/wp-content/uploads/sites/27/Professional-Services.pdf?v=1623280176766
6. Sample Price Proposal
Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The cost proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The table(s) below is intended to be a sample. Proposers may add necessary line items provided they are in compliance with instructions in this RFP for "Cost Proposals." The cost proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for materials and supplies.
INSTRUCTIONS:
Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. Using the attached Price Proposal in this RFP, provide Proposer’s lump-sum price and/or unit price for performing all services and work called for in the SCOPE OF WORK. The Proposer’s price shall include, without limitation:
A. all designs, equipment, materials, labor, insurance and bond premiums, home office, jobsite, and other overhead, profit and services relating to the Proposer’s performance of its obligations under the Contract (including all work, equipment, materials, labor, and services provided by subcontractors and intellectual property rights necessary to perform the work);
B. performance of each and every portion of the work
C. all costs of obtaining Government approvals other than Government approvals that are the responsibility of the City of Pasadena;
D. all costs of compliance with Government rules, except to the extent such compliance is the responsibility of the City of Pasadena;
E. all taxes, duties, permits, and other fees or royalties incident to the performance of the
SCOPE OF WORK;
F. payment of all salaries, wages, benefits, and expenses of the Proposer’s employees;
G. compensation for all risks, liabilities, and contingencies assigned to the Proposer; and
H. all other costs needed or incurred to complete the Project.
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 Structural Engineer 300 hourly rate
2 Architectural Building Plans Examiner 300 hourly rate
3 Fire Prevention Plans Examiner / Engineer
150 hourly rate
4 Electrical, Mechanical, Plumbing Plans Examiner / Engineer
225 hourly rate
5 Accessibility / CASp Plans Examiner 100 hourly rate
6 Drainage, LID Civil Engineer 60 hourly rate
TOTAL
7. Review and Award Recommendation Process
1. Review and Award
A screening committee will determine which proposals are responsive to City requirements and needs. The technical portions of responsive proposals will be evaluated by a selection panel consisting of personnel from the City. The selection may be based solely on the written proposals submitted.
PROPOSERS may be invited to a meeting to provide additional clarification of the content of their proposal. The City reserves the right to invite all of the PROPOSERS for an oral clarification OR only the top three (3) ranked firms based on the initial written proposal review. The meeting will not alter the selection criteria but will be used to clarify content of the proposal. The final scoring and ranking will be made after the meetings. Proposals shall consist of the sections named in the “Contents of Proposal” outlined below.
The weighted scoring in the Evaluation Criteria prioritizes the factors most important for this solicitation. A winner will be chosen based on the Total Average points of all evaluators across all scoring factors.
Once an agreement is reached with a Proposer, staff will recommend award of a contract. The City reserves the right to select the firm which, in its sole judgment, best meets the needs of the City.
For City Departments: Any contract resulting from this RFP, if more than $75,000, shall not be effective until approved by the City Manager. Any contract resulting from this RFP, if more than $250,000 shall not be effective until approved by the City Council.
For Operating Companies (such as the Rose Bowl): Any contract resulting from this RFP, if $250,000 or less, shall not be effective until approved by the top executive official of the Operating Company. Any contract resulting from this RFP, if more than $250,000, shall not be effective until approved by the Board of the Operating Company (including the Pasadena Rental Housing Board, Rose Bowl Operating Company, Pasadena Center Operating Company, or Pasadena Media).
2. Separate Review of Technical, and Price Proposals
The Technical Proposal and the Price Proposal will be evaluated separately. First will be all non-price qualifications including but not limited approach, experience, all Required Forms, litigation history, responsiveness, and all elements related to the non-price evaluation factors in the Evaluation Criteria (#Evaluation Criteria). The City may utilize separate evaluation committees to review the Technical and Price elements.
https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=undefined https://procurement.opengov.com/portal/pasadena/projects/106560/document?section=undefined
8. Public Contract Claims Procedure
PUBLIC CONTRACT CODE SEC. 9204 PUBLIC WORKS CLAIMS PROCEDURE
AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities.
For this legislation, a “public works project” is defined as “the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.” This definition is not as broad as in the Prevailing Wage Law.
A “claim” is defined as “a separate demand by a contractor sent by registered mail or certified mail with return receipt requested…” and is limited to three types of contract disputes:
1. “A time extension…for relief from damages or penalties for delay assessed by a public entity….”
2. “Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled”, and/or
3. “Payment of an amount that is disputed by the public entity.”
Upon receipt of a claim, a public entity must "conduct a reasonable review" and provide a written statement to the contractor within 45 days of receipt of the claim. Failure of a public entity to respond to a claim within the time periods described in Section 9204 "shall result in the claim being deemed rejected in its entirety."
For any undisputed portion of a claim, a public entity must make payment within 60 days of the public entity's issuance of the written statement.
If the contractor disputes the public entity's written statement, or if the public entity fails to respond, the contractor may demand "an informal conference to meet and confer for settlement of the issues in dispute." The public entity must schedule the meet and confer conference within 30 days of the demand.
Within 10 business days following the meet and confer conference, the public entity must provide a written statement identifying the portion of the claim that remains in dispute.
Any payment due on an undisputed portion of the claim must be made within 60 days of the meet and confer conference. Amounts not paid in a timely manner shall bear interest at 7 percent per year.
After the meet and confer conference, any disputed portion of the claim "shall be submitted to non-binding mediation." If mediation fails to resolve the dispute, the parts of the claim that remain in dispute shall be subject to applicable procedures outside Section 9204 (statutory and contractual).
The full text of this new legislation is set forth below:
THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:
SECTION 1.
Section 9204 is added to the Public Contract Code, to read:
9204.
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
The Department of Water Resources as to any project under the jurisdiction of that department.
The Department of Transportation as to any project under the jurisdiction of that department.
The Department of Parks and Recreation as to any project under the jurisdiction of that department.
The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
The Military Department as to any project under the jurisdiction of that department.
The Department of General Services as to all other projects.
The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim.
(C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .