Central_Creek_Pedestrian_Bridge_Specifications_11_17_26.pdf

PDF 152 KB Posted

Attached to
WTRBA Central Creek Pedestrian Bridge - UPDATED
Solicitation number
Event 32701-14044 V2
Issued by
Marion County, Tennessee

About this file

This is a specification document for a pedestrian bridge procurement issued by the West Tennessee River Basin Authority, a state agency. The project involves the design, fabrication, and installation of a fifty-five-foot-long by six-foot-wide pedestrian bridge spanning Central Creek in Jackson, Tennessee. The bridge shall be designed by a Tennessee-licensed engineer and constructed to match the character and style of an existing pedestrian bridge located downstream at Jackson Walk, utilizing existing abutments already constructed on-site. The scope of work includes bridge approaches, appurtenances necessary for trail connectivity, all federal, state, and local permitting, utility coordination, traffic control, landowner coordination, survey work, site repair, and an as-built survey upon completion. The contract quantity is one pedestrian bridge unit. The document does not specify bid submission deadlines, award dates, or contract term duration. Points of contact are Kris Gordon or Crystal McCaslin at the West Tennessee River Basin Authority office in Humboldt, Tennessee, (731) 784-8173.

Respondents and all applicable subcontractors must possess active Tennessee Contractor Licenses prior to bid submission and must provide the Tennessee-licensed engineer's license number, with all licenses subject to verification through the Tennessee Commerce and Insurance database before award. The contract is on a firm fixed-price basis as noted in the terms and conditions. The contractor assumes full responsibility for obtaining all necessary rights-of-way, easements, and access arrangements, as well as coordinating with utility line owners and managing utility relocation at their own expense. No separate payment will be made for utility line alterations. The contractor must establish and maintain quality control records throughout construction and provide copies to the engineer. The document does not specify funding sources, amounts, or any set-asides for small businesses or disadvantaged groups.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Central Creek Pedestrian Bridge

Specifications for the Procurement of a Pedestrian Bridge (55’L x 6’W) over

Central Creek

Jackson, Tennessee

November 2026

Sponsor: West Tennessee River Basin Authority

Table of Contents

Bid Information & Requirements 3

General Specifications 4

1. Explanation 4

2. Definitions 4

3. Examinations and Investigations 5

4. Direction of Work 5

5. Inspection of Work 6

6. Determination of Quantities and Measurements 6

7. Changes and Alterations 6

8. Defective Work and Materials 7

9. Time and Order of Completion 7

10. Extension of Time 8

11. Payment 8

12. Terms and Conditions 8

13. Conduct of Work 9

Detail Specifications 9

1. Description of Work 9

2. Quality Control 9

3. Right of Way 10

3.1 General 10

3.2 Utility Lines in Right of Way 10

Bid Information & Requirements

This contract consists of procuring the services for the design, fabrication, and installation of a fifty-five (55) foot long by six (6) foot-wide pedestrian bridge over Central Creek in Jackson, Tennessee (35.6211, -88.8181). An engineer licensed in the state of Tennessee shall design the pedestrian bridge and oversee the fabrication and installation of the pedestrian bridge. The pedestrian bridge shall be designed to utilize the existing abutments, already constructed in the field. The pedestrian bridge shall be similar in style to an existing bridge located downstream in

Jackson Walk at approximate coordinates 35.6179, -88.8211. Similarity consists of materials, color, and dimensions of the existing pedestrian bridge to match the character of the existing infrastructure. Installation of the pedestrian bridge shall include the pedestrian bridge walking surface, pedestrian bridge approaches, and other appurtenances that may not be listed but are required for connectivity with the existing trail. The points of contact for this project shall be Kris

Gordon or Crystal McCaslin at the office of the West Tennessee River Basin Authority in

Humboldt, Tennessee, (731) 784-8173.

Estimated quantities are as follows:

Description Estimated

Quantity

Unit

Pedestrian Bridge 1 Each

Requirements

The Respondent shall provide the license number for the State of Tennessee Licensed Engineer that will work on this project.

The Respondent and applicable subcontractors (subcontractors, vendors, independent (1099) contractors, trade partners, installers, or any other term) shall possess an active Tennessee

Contractor License prior to submitting a bid. Failure of the contractor and applicable subcontractors to provide copies of their appropriate license(s) shall result in the disqualification of the bid. All licenses shall be verified via Tennessee Commerce and Insurance database before project award.

General Specifications

1. Explanation

The Specifications are divided into General Specifications and Detail Specifications. The

General Specifications pertain, for the most part, to the relations between the Contractor and the State. The Detail Specifications describe each class of construction work, define and classify materials involved in the work, and explain the way each class of work shall be done and how it will be measured and paid for. Please review Attachment A Bridge

Abutment Plans and Attachment B Report of Geotechnical Exploration.

2. Definitions

Whenever the words herein defined or pronouns used in their stead occur in the Contract and Specifications, they shall have the meaning here given. The word "State" shall mean

Department of General Services as related to bid and award and the West Tennessee

River Basin Authority as related to work performance and payment. The word

"Commissioner" shall mean either the Commissioner of General Services or the Executive

Director of the West Tennessee River Basin Authority or their properly authorized agents acting severally within the scope of the duties entrusted to them as described under the above definition of "State.” The word "Engineer" shall mean West Tennessee River Basin

Authority or its authorized representative.

The word "Contractor” shall mean the person, partnership, or corporation entering into a contract for the performance of work or the agent appointed to act for the Contractor in the performance of the work.

The word "Surety" or "Sureties" shall mean the corporation or corporations which have executed a Surety Bond for the Contractor, and whose signatures are affixed to the Bond.

The words "Directed," "Required," "Ordered," "Instructed," "Considered Necessary," or words of like import, shall mean that the direction, requirement, order, instruction, etc., of the Engineer is intended; similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import, shall mean approved or acceptable or satisfactory to the Engineer.

Whenever the figures are given in the Specifications after the word "Elevation" or where figures representing elevations are given, they shall mean distance in feet above the U.

S. Geological Survey Sea Level Datum or a locally established job site datum, if noted as such on the plans.

3. Examinations and Investigations

The submission of a bid by the Contractor shall constitute a full and sufficient declaration that the Contractor has examined, to their complete satisfaction, the project site, adjacent premises, and the various means of approach to the work. It further affirms that the

Contractor has conducted all necessary investigations to fully understand the character and magnitude of all work required for a complete execution of the Contract, including the facilities for delivering and handling materials, local conditions, and other circumstances that may be encountered. Submission of the bid shall constitute a waiver by the Contractor of any claims for additional compensation arising from their failure to make such examinations and investigations.

4. Direction of Work

Prior to the start of construction, the Contractor shall call a pre-construction conference, including his Project Superintendent and his Foreman, the Engineer, the Soils Engineer, and others as the Engineer may direct. The purpose of this meeting is to review the requirements of the Contract Documents to assure complete understanding of the specific responsibilities of each participant and the Contractor’s relationship with the others involved.

The installation of the bridge shall be communicated and scheduled with the adjacent property owners. Access and easements for this work to be completed shall be the responsibility of the Contractor. The Contractor assumes full liability for any damage to persons, land, crops or property caused by failure to carry out the work as herein required.

The Engineer shall have the right to direct the manner in which all work is to be conducted to that extent as may be necessary to secure the proper progress and quality of the work, and all directions and instructions of the Engineer, or any of his inspectors or other agents shall be carried out by the Contractor. To ensure the proper completion of the Contract, the

Engineer may, if necessary, determine the order of precedence in which any part of the work shall be commenced and carried on. The Contractor shall designate a representative in each construction force to receive and carry out the Engineer's instructions and orders.

The Contractor agrees that notwithstanding the general supervisory control that may be carried out by the Engineer and State over the work to be done under the terms of this contract and the specifications, that their responsibilities and liabilities are those of an independent Contractor.

5. Inspection of Work

All work and material furnished shall always be subject to a thorough and minute inspection by the Engineer. The Contractor shall always permit access to every part of the work and to all points where materials to be used in the work are manufactured, procured, or stored.

6. Determination of Quantities and Measurements

The Engineer shall determine all quantities and amounts of materials and work performed.

7. Changes and Alterations

The State reserves the right to make any alterations, eliminations, or additions that it may deem necessary in the work to be done provided that any such alterations, eliminations, and additions shall not materially alter the general character of work as a whole.

8. Defective Work and Materials

If the work should be damaged in any way, or if any defects not readily detected by inspection develop before the final acceptance of the whole work, unless hereafter otherwise specified, the Contractor shall correct such damage or defect without additional compensation. If the Contractor shall fail to reconstruct any defective or damaged work after reasonable notice, the Engineer may cause such work to be reconstructed, and the expense thereof, shall be deducted from the amount to be paid to the Contractor.

If upon any work that is defective or damaged, the imperfection, in the opinion of the

Engineer, is not sufficiently important to require reconstruction, the State shall have the right to make such deductions as the Engineer may determine to be just and reasonable, from the amounts due or to become due, instead of requiring the imperfect part to be reconstructed.

9. Time and Order of Completion

Determination as to whether the required rate of progress is being maintained may be made at any time after the work has started, by comparing the value at the contract price of the amount of work done, with the value at the Contract price of the amount of work necessary to have been accomplished during such period in order to have maintained the prescribed rate of progress. In determining progress; the work shall be assumed to have begun at the

Effective Date of the Contract, and proper consideration shall be given to any extensions of time that may have been granted. Any failure to maintain the required rate of progress, after taking into consideration extensions of time that have been granted, shall be a breach of contract, just as would be a failure to complete the entire work within the specified time.

Contract terms may be extended for final inspection and fiscal reasons without comment, but extension of contract term to alter completion times must be requested in writing to the

West Tennessee River Basin Authority and a copy of this request signed by the director and forwarded to the state contract administrator.

Assessment of damages shall be the sole responsibility of the Engineer and the Director of the Authority.

10. Extension of Time

Delays due to causes beyond the control of the Contractor, other than those that, in the opinion of the Engineer, reasonably would be expected to occur in connection with the performance of the work, may entitle the Contractor to an extension of time for completing the work sufficient to compensate for such delay. No extension of time shall be granted, however, unless the Contractor shall, within fifteen (15) days from the beginning of the delay, notify the Engineer in writing of such delay, and of the time of beginning and the cause of the same. After work is resumed, the Engineer will determine the extension of time, if any, that shall be allowed the Contractor, and his decision shall be binding and conclusive on both parties.

11. Payment

As soon as possible, after the work covered by the Contract has been completed in a manner satisfactory to the Engineer and the State, the payment request shall be submitted to the

State. Payment will be made by the State based on the terms of the contract. Payment will be held by the State until the Contractor furnishes the State with an affidavit as to payment of labor and material furnished and used on this Contract, and acceptance and approval of payment has been received by the State from the Bonding Company or Surety. Thereupon, the State shall release the Contractor’s bond and any contractual responsibilities attached thereto. Final acceptance of the work, and release of the contractor’s bond, shall also be a release to the State from all claims against the State on account of this Contract.

12. Terms and Conditions

Respondents shall review the solicitation Terms and Conditions in their entirety. Below are Terms and Conditions Sections to make note of.

• Section 5 Warranty Clauses

• Section 7.2 Compensation Firm

• Section 8.6. Modification and Amendment

• Section 8.10. Assignment and Subcontracting

• Section 8.20. Limitation of State’s Liability

• Section 8.21. Limitation of Contractor’s Liability

• Section 8.22. Hold Harmless

• Section 9.1. Insurance

• Section 10.13. Payment Bond

13. Conduct of Work

The work to be constructed under these Specifications consists of the design, fabrication, and installation of a pedestrian bridge over Central Creek in Jackson, TN.

Detail Specifications

1. Description of Work

The work provided herein consists of the design, fabrication, and installation of a six (6) foot wide pedestrian bridge, clear spanning approximately fifty-five (55) feet over Central

Creek (35.6211, -88.8181). The design shall be stamped by a State of Tennessee licensed engineer. The fabrication and installation of the pedestrian bridge shall be overseen and approved by the engineer on record. All ancillary work and coordination necessary to complete the project is assumed to be included. This includes, but is not limited to, all

Federal, State, and Local permitting, utility coordination, traffic control, landowner coordination, physical measurements/survey, and site repair. An as-built survey will be required at when construction is complete.

2. Quality Control

The Contractor shall establish and maintain quality control for the work specified in this section to assure compliance with contract requirements and maintain records of his quality control for all construction. A copy of these records and tests, as well as the records of corrective action taken, shall be furnished to the Engineer.

3. Right-of-Way

3.1. General

The lands, easements, and rights-of-way for work under the Contract will be the responsibility of the Contractor to obtain. This work is supplemental to a larger project that the landowners have been supportive of, and they are aware of this project. However, the Contractor shall make his own arrangements with the appropriate owners or organizations for transporting his equipment across, over, or under highways, bridges, private property, and utility lines. The Contractor shall provide, at their own expense, any additional rights-of-way or easements required to affect such crossings, including insurance requirements of owners.

3.2. Utility Lines in Right-of-Way

The Contractor shall make their own arrangements with the owners of utility lines, if located within the right-of-way, for re-routing or altering of power and communication lines, as may be necessary to provide clearance for the construction of the work adjacent thereto. No separate payment, as such, will be made for the alternation of these utility lines and the costs in connection therewith will be considered as an incidental expense to the

Contractor. The Contractor shall exercise special care in working in the vicinity of the utility lines to prevent damage or injury to the Contractor's employees or others. Any damage to the utility lines or interruption of service caused by the Contractor's operations shall be repaired and the service restored promptly at their expense.