About this file
This is a Statement of Work (SOW) for the procurement and installation of two ceiling fans at Hangar 220 West, Building 751, Joint Base Langley-Eustis, Virginia. The customer is the 1st Fighter Wing (1FW) – 1st Maintenance Group, which uses the hangar for weapons load training, promotions, retirements, awards ceremonies, tours, and loading competitions. The project objective is to address temperature control issues by installing two 16-inch ceiling fans with 2-foot extension tubes to improve air circulation, as Hangar 220 West currently operates approximately 10 degrees hotter than the adjacent Hangar 220 East, which already has ceiling fans installed. The requested equipment is two Big Ass Fans or equal ceiling fan kits (Powerfoil X4, 16 inches, 400-480V/3-phase). Delivery must be made to the 1MXG/MXL at 220 E. Flightline Road, Building 751, Langley Air Force Base, with a period of performance of 14 days from Notice to Proceed.
The contractor is required to provide warranty coverage for both parts and labor. Contractor employees must comply with all applicable installation access and local security policies and procedures at the government-controlled facility, including background checks and personal identity verification requirements as directed by the Department of Defense and Air Force policy. Contractors without Common Access Card (CAC) requirements must still comply with adjudication standards using the National Crime Information Center Interstate Identification Index and Terrorist Screening Database. The technical point of contact is TSgt Joseph Fowler, the BLDG 751 Facility Manager. No specialized deliverables such as project drawings, CDs, owners manuals, or samples are required beyond the installation of the equipment itself.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ceiling Fan Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOINT-BASE LANGLEY-EUSTIS, VA 23665
STATEMENT OF WORK
Hangar 220W Ceiling Fans – 1st Maintenance Group
DATE: 01/15/2026
FOR
UNITED STATES PROPERTY AND FISCAL OFFICES
HAMPTON, VA 23665
TABLE OF CONTENTS
SECTION
1. GENERAL INFORMATION
1.1 CUSTOMER
1.2 LOCATION
1.3 PROJECT OBJECTIVES
1.4 WORK HOURS 1.5 PERIOD OF PERFORMANCE
1.6 POCs
2. SCOPE OF WORK
2.1 DIMENSIONS AND REQUIREMENTS
2.2 CIVIL LAYER
2.3 HVAC
2.4 ELECTRICAL
2.5 COMMUNICATIONS
2.6 MISCELLANEOUS
3. DELIVERABLES
3.1 DRAWINGS/PROJECT CDs
3.2 OWNERS MANUALS
3.3 WARRANTIES
3.4 SAMPLES
4. ATTACHMENT
4.1 FLOOR PLAN / DRAWINGS
1. GENERAL INFORMATION
1.1 CUSTOMER
1st Fighter Wing (1FW) – 1st Maintenance Group
1.2 LOCATION
Building 751, Hangar 220 West – Weapons Standardization
1.3 PROJECT OBJECTIVES
Request two fans to be purchased and installed at the aft portion of Hangar 220 West. Hangar is used for weapons load training, promotions, retirements, awards ceremonies, tours, and loading competitions. Currently using portable fans and the hangar is still very hot in the summer months. Hangar 220 East has ceiling fans and averages about 10 degrees cooler than Hangar 220 West.
1.4 WORK HOURS
N/A
1.5 PERIOD OF PERFORMANCE
14 Days from Notice to Proceed (NTP)
1.6 POCs
Contracting Specialist: N/A Technical Representative: TSgt Joseph Fowler / BLDG 751 Facility Manager Project Manager:
2. SCOPE OF WORK
Request the following brand name or equal equipment:
Two Big Ass Fans or equal, Ceiling Fan Kit, Powerfoil X4, 16’, 400-480V/3PH
2.1 DIMENSIONS AND REQUIREMENTS
Two 16” fans with 2 foot extension tube for clearances
2.2 CIVIL LAYER
2.2.1 Structural:
Deliver to the 1MXG/MXL 220 E. Flightline Rd (BLDG 751) Langley AFB, 23665
2.2.2 Finishes:
N/A
2.3 HVAC
2.4 ELECTRICAL
2.5 COMMUNICATIONS
2.6 MISCELLANEOUS
Access and General Protection/Security Policy and Procedures.
This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
For Contractors that do not require CAC but require access to a DoD Facility and/or Installation.
Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3. DELIVERABLES
3.1 DRAWINGS/PROJECT CDs
3.2 OWNERS MANUAL
N/A
3.3 WARRANTIES
The contractor will provide warranty for parts and labor
3.4 SAMPLES
| STATEMENT OF WORK |
| DATE: 01/15/2026 |
| 1. GENERAL INFORMATION |
| 2. SCOPE OF WORK |
| 3. DELIVERABLES |
| 4. ATTACHMENT |
| 4.1 FLOOR PLAN / DRAWINGS |
| 1.2 LOCATION |
| Building 751, Hangar 220 West – Weapons Standardization |
| 1.6 POCs Contracting Specialist: N/A Technical Representative: TSgt Joseph Fowler / BLDG 751 Facility Manager Project Manager: |
| 2.1 DIMENSIONS AND REQUIREMENTS |
| Two 16” fans with 2 foot extension tube for clearances |
| 2.2 CIVIL LAYER |
| 2.6 MISCELLANEOUS |
| 3.1 DRAWINGS/PROJECT CDs N/A |
| 3.2 OWNERS MANUAL N/A |
| 3.4 SAMPLES N/A |