Attachment 2 - Updated CEHNC-031467-OT_ROM_Pricing_Template V2 261001.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Modular Power Generation and Distribution
- Solicitation number
- CEHNC-031467-OT
About this file
This is a Rough Order of Magnitude (ROM) Pricing Template for a federal contract opportunity under the Other Transactional Authority for modular power generation and distribution solutions. The template is structured to price two distinct site configurations (Site A and Site B), with offerors required to price each line for a single site meeting the respective requirements while assuming a total quantity of five sites for ROM calculation purposes, though additional sites may be ordered. The pricing template is organized into three primary sections: Power Generation and Distribution Options (Base, N+1 Generation, N+2 Generation, and N+1 Distribution), Contractor Logistics Support/Operations & Maintenance Options (Years 1-3), and Battery Energy Storage System (BESS) and Load Bank options.
Each line item requires offerors to provide cost breakdowns across five categories: Labor, Material/Equipment, Other Direct Costs, Indirect/Fee, and Total ROM Price, with space for notes and assumptions as well as non-recurring costs. The solicitation (CEHNC-031467-OT) is issued by the U.S. Army Corps of Engineers, Huntsville Center, under 10 U.S.C. § 4022 as a Firm Fixed Price prototype project to address the Department of Defense's urgent requirement for relocatable modular power generation and distribution systems capable of supplying and stabilizing large transient loads at 10-12 sites across the 50 United States. Implementation is required by February 28, 2028, with white paper submissions due October 16, 2026, at 1700 hours CDT. This template was updated in Amendment 3 to incorporate industry feedback and provide a standardized pricing structure for evaluation purposes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROM Summary (Site A)
| Attachment 2 - Updated Rough Order of Magnitude (ROM) | |
| ROUGH ORDER OF MAGNITUDE (ROM) PRICING TEMPLATE - SITE A | |
| Modular Power Generation and Distribution | Project No. CEHNC-031467-OT | Request for White Paper | |
| Firm Fixed Price – Prototype Project under 10 U.S.C. § 4022 | |
| Note: Price each line for ONE site meeting Site A requirements. Assume a total quantity of 5 (five) sites meeting Site A requirements for ROM purposes. Additional sites may be ordered but for the Total ROM, assume 5 sites. | |
| OFFEROR INFORMATION | |
| Company Name: | Date: |
| CAGE / UEI: | POC Name / Email / Phone: |
| SECTION 1 — POWER GENERATION AND DISTRIBUTION OPTIONS | |||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions | Extended ROM Price |
| Non-recurring Costs | <Provided by the Offeror, e.g., one time or programmitic costs such as design, engineering, program start-up> | ` | $0 | ||||||
| BASE | N Generation + N Distribution | Base quantity of generators (N) + base distribution switchgear/feeders sufficient for the proposed load (no redundancy) | $0 | ||||||
| OPTION 1 | N+1 Generation (incremental) | Additional generation capacity and associated equipment to achieve N+1 redundancy configuration (one additional generator set + paralleling/controls as required) | $0 | ||||||
| OPTION 2 | N+2 Generation (incremental) | Additional generation capacity and associated equipment to achieve N+2 redundancy configuration (second additional generator set + paralleling/controls as required). Price as incremental over N+1. | $0 | ||||||
| OPTION 3 | N+1 Distribution | Distribution switchgear, breakers, feeders, and associated equipment sized for N+1 configuration | $0 | ||||||
| SUBTOTAL — Generation & Distribution (Base + All Options) | $0 | $0 | $0 | $0 | $0 | ||||
| SECTION 2 — CONTRACTOR LOGISTICS SUPPORT (CLS) / OPERATIONS & MAINTENANCE OPTIONS | |||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions | Extended ROM Price |
| OPTION 4 | CLS — Year 1 (Per SITE, Per YEAR) | Contractor Logistics Support / Operations & Maintenance for the first 12 months following successful commissioning of the complete power solution | $0 | ||||||
| OPTION 5 | CLS — Year 2 (Per SITE, Per YEAR) | Contractor Logistics Support / Operations & Maintenance for the second 12-month period (months 13–24) | $0 | ||||||
| OPTION 6 | CLS — Year 3 (Per SITE, Per YEAR) | Contractor Logistics Support / Operations & Maintenance for the third 12-month period (months 25–36) | $0 | ||||||
| SUBTOTAL — CLS (All Years) | $0 | $0 | $0 | $0 | $0 |
| SECTION 3— BESS and Load Banks | |||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions | Extended ROM Price |
| OPTION 7 | BESS (Battery Energy Storage System) | $0 | |||||||
| OPTION 8 | Load Bank | $0 | |||||||
| SUBTOTAL | $0 | $0 | $0 | $0 | $0 |
ROM Summary (Site B)
| Attachment 2 - Updated Rough Order of Magnitude (ROM) | |
| ROUGH ORDER OF MAGNITUDE (ROM) PRICING TEMPLATE - SITE B | |
| Modular Power Generation and Distribution | Project No. CEHNC-031467-OT | Request for White Paper | |
| Firm Fixed Price – Prototype Project under 10 U.S.C. § 4022 | |
| Note: Price each line for ONE site meeting Site B requirements. Assume a total quantity of 5 (five) sites meeting Site B requirements for ROM purposes. Additional sites may be ordered but for the Total ROM, assume 5 sites. | |
| OFFEROR INFORMATION | |
| Company Name: | Date: |
| CAGE / UEI: | POC Name / Email / Phone: |
| SECTION 1 — POWER GENERATION AND DISTRIBUTION OPTIONS | |||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions | Extended ROM Price |
| Non-recurring Costs | <Provided by the Offeror, e.g., one time or programmitic costs such as design, engineering, program start-up> | ` | $0 | ||||||
| BASE | N Generation + N Distribution | Base quantity of generators (N) + base distribution switchgear/feeders sufficient for the proposed load (no redundancy) | $0 | ||||||
| OPTION 1 | N+1 Generation (incremental) | Additional generation capacity and associated equipment to achieve N+1 redundancy configuration (one additional generator set + paralleling/controls as required) | $0 | ||||||
| OPTION 2 | N+2 Generation (incremental) | Additional generation capacity and associated equipment to achieve N+2 redundancy configuration (second additional generator set + paralleling/controls as required). Price as incremental over N+1. | $0 | ||||||
| OPTION 3 | N+1 Distribution | Distribution switchgear, breakers, feeders, and associated equipment sized for N+1 configuration | $0 | ||||||
| SUBTOTAL — Generation & Distribution (Base + All Options) | $0 | $0 | $0 | $0 | $0 | ||||
| SECTION 2 — CONTRACTOR LOGISTICS SUPPORT (CLS) / OPERATIONS & MAINTENANCE OPTIONS | |||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions | Extended ROM Price |
| OPTION 4 | CLS — Year 1 (Per SITE, Per YEAR) | Contractor Logistics Support / Operations & Maintenance for the first 12 months following successful commissioning of the complete power solution | $0 | ||||||
| OPTION 5 | CLS — Year 2 (Per SITE, Per YEAR) | Contractor Logistics Support / Operations & Maintenance for the second 12-month period (months 13–24) | $0 | ||||||
| OPTION 6 | CLS — Year 3 (Per SITE, Per YEAR) | Contractor Logistics Support / Operations & Maintenance for the third 12-month period (months 25–36) | $0 | ||||||
| SUBTOTAL — CLS (All Years) | $0 | $0 | $0 | $0 | $0 |
| SECTION 3— BESS and Load Banks | |||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions | Extended ROM Price |
| OPTION 7 | BESS (Battery Energy Storage System) | $0 | |||||||
| OPTION 8 | Load Bank | $0 | |||||||
| SUBTOTAL | $0 | $0 | $0 | $0 | $0 |
File details come from the government source that posted it. Updated .