ATTACHMENT 2_CEHNC-031467-OT_ROM_Pricing_Template.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Modular Power Generation and Distribution Federal contract opportunity
- Solicitation number
- CEHNC-031467-OT
About this file
This is a Rough Order of Magnitude (ROM) Pricing Template for a Modular Power Generation and Distribution solicitation (CEHNC-031467-OT) issued by the U.S. Army Corps of Engineers, Huntsville Center. The template is designed to collect pricing information from respondents proposing relocatable modular power generation and distribution solutions capable of supplying and stabilizing large transient loads for Department of Defense sites across the 50 United States. The Government requires implementation at 10-12 locations with a critical deadline of 28 February 2028. This template serves as a standardized format for vendors to submit rough order of magnitude estimates and does not contain specific technical requirements, performance metrics, or detailed statement of work information; rather, it functions as a pricing tool to gather cost proposals aligned with the Government's manufacturing, procurement, shipping, delivery, installation, and testing requirements for these modular power systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Modular Power Generation and Distribution_Request for White Papers_Amendment 3.pdf | ||
| CEHNC-031467-OT_Attachment_3_Government_Responses.pdf | ||
| Attachment 2 - Updated CEHNC-031467-OT_ROM_Pricing_Template V2 261001.xlsx | XLSX spreadsheet | |
| Modular Power Generation and Distribution_Request for White Papers_Amendment 2.pdf | ||
| Modular Power Generation and Distribution_Request for White Papers_Amendment 1.pdf | ||
| FINAL_Modular Power Generation and Distribution_Request for White Papers_9.10.2026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROM Summary
| ROUGH ORDER OF MAGNITUDE (ROM) PRICING TEMPLATE | ||||||||
| Modular Power Generation and Distribution | Project No. CEHNC-031467-OT | Request for White Paper | ||||||||
| Firm Fixed Price – Prototype Project under 10 U.S.C. § 4022 | ||||||||
| OFFEROR INFORMATION | ||||||||
| Company Name: | Date: | |||||||
| CAGE / UEI: | POC Name / Email / Phone: | |||||||
| SECTION 1 — POWER GENERATION AND DISTRIBUTION OPTIONS | ||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions |
| BASE | N Generation + N Distribution | Base quantity of generators (N) + base distribution switchgear/feeders sufficient for the proposed load (no redundancy) | $0 | |||||
| OPTION 1 | N+1 Generation (incremental) | Additional generation capacity and associated equipment to achieve N+1 redundancy configuration (one additional generator set + paralleling/controls as required) | $0 | |||||
| OPTION 2 | N+2 Generation (incremental) | Additional generation capacity and associated equipment to achieve N+2 redundancy configuration (second additional generator set + paralleling/controls as required). Price as incremental over N+1. | $0 | |||||
| OPTION 3 | N+1 Distribution | Distribution switchgear, breakers, feeders, and associated equipment sized for N+1 configuration | $0 | |||||
| OPTION 4 | N+2 Distribution | Distribution switchgear, breakers, feeders, and associated equipment sized for N+2 configuration . Price as incremental over N+1. | $0 | |||||
| SUBTOTAL — Generation & Distribution (Base + All Options) | $0 | $0 | $0 | $0 | $0 | |||
| SECTION 2 — CONTRACTOR LOGISTICS SUPPORT (CLS) / OPERATIONS & MAINTENANCE OPTIONS | ||||||||
| CLIN / Option | Description | Scope / Quantity | Labor ($) | Material / Equipment ($) | Other Direct Costs ($) | Indirect / Fee ($) | Total ROM Price ($) | Notes / Assumptions |
| OPTION 5 | CLS — Year 1 | Contractor Logistics Support / Operations & Maintenance for the first 12 months following successful commissioning of the complete power solution | $0 | |||||
| OPTION 6 | CLS — Year 2 | Contractor Logistics Support / Operations & Maintenance for the second 12-month period (months 13–24) | $0 | |||||
| OPTION 7 | CLS — Year 3 | Contractor Logistics Support / Operations & Maintenance for the third 12-month period (months 25–36) | $0 | |||||
| SUBTOTAL — CLS (All Years) | $0 | $0 | $0 | $0 | $0 |
File details come from the government source that posted it. Updated .