CDRLs10Jul2020.pdf
PDF 4 MB Posted
- Solicitation number
- FA852320R0040
About this file
This Contract Data Requirements List (CDRL) outlines technical data items required under a contract to provide engineering and technical services and supplies for sustainment, modification, and update of the AN/ALQ-172(V) Countermeasures System. Key deliverables include status reports, expenditure reports, deficiency analysis plans and reports, software documentation, test plans and reports, weight and balance reports, and a software development plan. Responses are due by specified dates within 15 to 90 days of award or as defined in approved project plans. The Air Force Life Cycle Management Center is listed as the requiring office, with distribution to authorized Defense Department and contractor personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GFPAttachment.pdf | ||
| ALQ172SCGFebruary2018.pdf | ||
| FA852320R0040final.pdf | ||
| AppendixE.pdf | ||
| StatementofWork.pdf | ||
| DD254ContractSecurityClassificationSpecification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, AUG 96 Computer Generated Page 1 of 128
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ MGMT ___X______ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Monthly Status Report
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A
5. CONTRACT REFERENCE
SOW Para 2.1.1 and SOW Para 3.2.1.1.4
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX MTHLY See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 O See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 Feb 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12, 13:
Submit by the 20th day of the month after the first full month after contract award.
Thereafter, submit by the 20th day of every month.
Government approval/comments will be provided within 10 days after submittal.
Resubmit, if required, within 5 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
6 Feb 2020 Dae Lee 01/08/2020
DD Form 1423-1, AUG 96 Computer Generated Page 2 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER________X__________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Funds and Man-Hours Expenditure Report
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80331A/T
5. CONTRACT REFERENCE
SOW Para 2.1.1 and SOW Para 3.2.1.1.4
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX MTHLY See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A O See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 06 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12, 13:
Submit by the 20th day of the month after the first full month after contract award.
Thereafter, submit by the 20th day of every month.
Government approval/comments will be provided within 10 days after submittal.
Resubmit, if required, within 5 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
6 Feb 2020
Alan Arnold
DD Form 1423-1, AUG 96 Computer Generated Page 3 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
MISC___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Service Engineering Report
3. SUBTITLE
Deficiency Analysis Plan
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81384
5. CONTRACT REFERENCE
SOW Para 2.1.1.1, 2.1.5.2.1
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID and SOW requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12:
For analyses in paragraph 2.1.1, submit no later 60 DAC.
For analyses in paragraph 2.6.2.1, submit within 15 days of assignment.
Block 13:
Government approval/comments will be provided within 10 days after submittal.
Resubmit, if required, within 5 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 4 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
MISC___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Service Engineering Report
3. SUBTITLE
Deficiency Analysis Report
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81384
5. CONTRACT REFERENCE
SOW Para 2.1.1.2, 2.1.5.2.2
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID and SOW requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12:
Submit per schedule defined in approved deficiency analysis plan.
Block 13:
Government approval/comments will be provided within 10 days after submittal.
Resubmit, if required, within 5 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 5 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
MISC___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Scientific and Technical Reports Summary
3. SUBTITLE
Project Requirements Specification
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80048
5. CONTRACT REFERENCE
SOW Para 2.1.4
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ 20 DAC b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016. 0 0 1
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 13:
Government approval/comments will be provided within 10 days after submittal.
Resubmit, if required, within 5 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 6 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER____X______________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Software Development Plan
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81427A
5. CONTRACT REFERENCE
SOW Para 2.1.2.2, 2.1.4.1
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ 30 DAC b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conforming requirements of the DID.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 10 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 7 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER_____X_____________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Software Test Plan
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81438A
5. CONTRACT REFERENCE
SOW Para 2.1.2.2
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ 30 DAC b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 10 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 8 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ MGMT________X__________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Contract Work Breakdown Structure
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81334D
5. CONTRACT REFERENCE
SOW Para 2.1.2.1, 2.1.4.1
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ 15 DAC b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 10 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 10 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00A
2. TITLE OF DATA ITEM
System/Subsystem Specification
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81431A
5. CONTRACT REFERENCE
SOW Para 2.1.1.3
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Blocks 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 30 days after submittal.
Resubmit, if required, within 15 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 11 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00B
2. TITLE OF DATA ITEM
Software Requirements Specification
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81433A
5. CONTRACT REFERENCE
SOW Para 2.1.2.4, 2.1.4.2
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Blocks 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 30 days after submittal.
Resubmit, if required, within 15 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 12 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00C
2. TITLE OF DATA ITEM
Interface Requirements Specification
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81434A
5. CONTRACT REFERENCE
SOW Para 2.1.2.4
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Blocks 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 30 days after submittal.
Resubmit, if required, within 15 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 13 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00D
2. TITLE OF DATA ITEM
Software Design Description
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81435A
5. CONTRACT REFERENCE
SOW Para 2.1.2.5, 2.1.4.3
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Blocks 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 10 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNYEBA Engineers
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 14 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER____X______________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00E
2. TITLE OF DATA ITEM Interface Design Description (IDD)
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81436A
5. CONTRACT REFERENCE
SOW Para 2.1.2.5
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Blocks 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 10 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 15 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER____X______________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00F
2. TITLE OF DATA ITEM
Database Design Description
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81437A
5. CONTRACT REFERENCE
PWS Para 2.1.2.5
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 15 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 16 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER___X______________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00G
2. TITLE OF DATA ITEM
Software Test Description
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81439A
5. CONTRACT REFERENCE
SOW Para 2.1.2.5, 2.1.3.1, 2.1.4.3
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 15 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 17 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP___X___ TM _________ OTHER__________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00H
2. TITLE OF DATA ITEM
Computer Software Product
3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81488
5. CONTRACT REFERENCE
SOW Para 2.1.2.6, 2.1.4.4
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Submission shall include the executable files and all project files (compiler setup, source files) required to build the executable. Compliance with SDP standards is mandatory.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 10 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 18 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER___X_______________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00J
2. TITLE OF DATA ITEM
Software Test Report
3. SUBTITLE
Integration Test Report
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81440A
5. CONTRACT REFERENCE
SOW Para 2.1.2.6, 2.1.4.4
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016 or with pre-approved, contractor-provided native development environment.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February 2020. Other requests shall be referred to AFLCMC/WNY.
Block 12:
Submit per project schedule as defined in the respective WNY-approved project plan.
Block 13:
Government approval/comments will be provided within 15 days after submittal.
Resubmit, if required, within 10 days after receipt of government comments.
Block 14:
Submit electronic copies to the Government IAW SOW 3.2.9.1.
Notify delivery to the distribution points of contact as identified below.
Distribution:
AFLCMC/WNY ALQ-172 Integrated Product Team (IPT) wralc.alq172.all@us.af.mil
15. TOTAL → 0 0 1
G. PREPARED BY H. DATE I. APPROVED BY
Alan Arnold
J. DATE
DD Form 1423-1, AUG 96 Computer Generated Page 19 of 128
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project(0704-0188),Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP______ TM _________ OTHER__X________________
D. SYSTEM/ITEM
AN/ALQ-172
E. CONTRACT/PR NO.
FD2060-21-30005
F. CONTRACTOR
L3Harris
1. DATA ITEM NO.
A00K
2. TITLE OF DATA ITEM
Software Test Report
3. SUBTITLE
Qualification Test Report
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81440A
5. CONTRACT REFERENCE
SOW Para 2.1.2.7, 2.1.4.5
6. REQUIRING OFFICE
AFLCMC/WNY
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
See Block 16 N/A See Block 16 Draft Reg Repro
16. REMARKS AFLCMC/WNY 0 0 1
235 Byron St., Suite 19A
Block 4: Robins AFB, GA 31098-1670
Contractor format is acceptable. Electronic format shall be compatible with
PC-based versions of Microsoft Office 2016 or with pre-approved, contractor-provided native development environment.
Block 8:
Data items will be reviewed and accepted/rejected based on conformance with the DID requirements.
Block 9:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only for the following reasons:
Administrative or Operational Use and/or Vulnerability Information as of 6 February…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .