CDRLs.pdf

PDF 1006 KB Posted

Attached to
CABLE ASSEMBLY (26-R-0029) Federal contract opportunity
Solicitation number
SPRHA2-26-R-0029
Issued by
Defense Logistics Agency Aviation

About this file

This is an Adobe PDF portfolio welcome screen advising users to open the document using Acrobat X or Adobe Reader X or later versions. The image displays the Adobe PDF logo, a red and white document icon, and a button to download Adobe Reader. No substantive contract or solicitation details are present in this initial screen.

View the file

Other files for this federal contract opportunity

Other files attached to CABLE ASSEMBLY (26-R-0029), newest first.
File Type Posted
EI_69E49476G1_v1.pdf PDF
EI_69E49477G1_v1.pdf PDF
EI_69E49480G1_v1.pdf PDF
SPRHA2-26-R-0029-0003 CUI.pdf PDF
SPRHA2-26-R-0029-0002 CUI.pdf PDF
SPRHA2-26-R-0029-0001 CUI.pdf PDF
PackagingSOW.pdf PDF
SPRHA2-26-R-0029 CUI.pdf PDF
EDL.pdf PDF
EDR.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001 title: Test/Inspection Report sub: First Article Test Report auth: DI-NDTI-80809B/T ref:

req_ofc: 414 SCMS/GUEA dd250: SD appcode: A dist: See Blk 16 freq: See Blk 16 asof: See Blk 16 firstsub: See Blk 16 subsub: See Blk 16 addressee1: 809 MXSS/MXDEB draft1:

reg1: 1 repro1:

addressee2: See Blk 16 draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 1 total_repro: 0 remarks: Block D:

NIIN: 004508176; PN: 69E49476G1; Description: Cable Assembly, Special Purpose, Electrical Branched (HRU859/B), W5A

Block 4: Contractor format acceptable.

Paragraph 10.2 of DI-NDTI-80809B clarified as follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

Block 9: Data submittal shall be marked with "CUI" as a header and footer on each page as well as the following on the cover page:

Controlled by: USAF Controlled by: AFNWC/NM CUI Category: Controlled Technical Information/Export Controlled Distribution/Dissemination Control: Distribution D POC: Peter Miller/801-586-2964/peter.miller.13@us.af.mil/AFNWC/NIMR

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled: Determined 19NOV2025. Other requests for this document must be referred to Minuteman III Systems Directorate, Hill AFB, UT, 84056.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 Of Title 22, United States Code) or the Export Control Reform Act Of 2018 (Chapter 58 Sections 4801-4852 Of Title 50, United States Code). Violations of these export-control laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25 and DoD instruction 2040.02.

group: NSP total_price: 0.00 prep_name: David Cheney line_item:

exhibit: A xtdp: Off xtm: Off othercat:

system: See Blk 16 ctr_no: PR# FD20202600029 contr:

remarksb:

Block 10: ONE/R, Report shall be submitted concurrently with the "First Article" item either in the shipping container or separately if the report will not fit within the container unfolded. When shipped in the "First Article" container, report shall be enclosed in a paper or plastic envelope.

Block 11, 12, and 13: Defined in Contract

Block 14: Complete mailing address is:

809 MXSS/MXDEB (DODAAC: FB2029)

Bldg 849, Attn: Non-Accountable Bay Mark For: First Article Do Not Post Hill AFB, UT 84056-5713

Page2: 2

Reset:

2025-11-19T07:51:51-0700

CHENEY.DAVID.LEE.1537393579

prep_date: 19 NOV 2025 app_by: Ray Dean Murrison

2025-11-19T08:08:32-0700

MURRISON.RAY.D.JR.1513506828

app_date: 19 NOV 2025

Page: 1 of_pages: 2 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A001 title: Test/Inspection Report sub: First Article Test Report auth: DI-NDTI-80809B/T ref:

req_ofc: 414 SCMS/GUEA dd250: SD appcode: A dist: See Blk 16 freq: See Blk 16 asof: See Blk 16 firstsub: See Blk 16 subsub: See Blk 16 addressee1: 809 MXSS/MXDEB draft1:

reg1: 1 repro1:

addressee2: See Blk 16 draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 1 total_repro: 0 remarks: Block D:

NIIN: 004508177; PN: 69E49477G1; Description: Cable Assembly, Special Purpose, Electrical Branched (HRU857/B), W5C

Block 4: Contractor format acceptable.

Paragraph 10.2 of DI-NDTI-80809B clarified as follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

Block 9: Data submittal shall be marked with "CUI" as a header and footer on each page as well as the following on the cover page:

Controlled by: USAF Controlled by: AFNWC/NM CUI Category: Controlled Technical Information/Export Controlled Distribution/Dissemination Control: Distribution D POC: Peter Miller/801-586-2964/peter.miller.13@us.af.mil/AFNWC/NIMR

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled: Determined 19NOV2025. Other requests for this document must be referred to Minuteman III Systems Directorate, Hill AFB, UT, 84056.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 Of Title 22, United States Code) or the Export Control Reform Act Of 2018 (Chapter 58 Sections 4801-4852 Of Title 50, United States Code). Violations of these export-control laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25 and DoD instruction 2040.02.

group: NSP total_price: 0.00 prep_name: David Cheney line_item:

exhibit: A xtdp: Off xtm: Off othercat:

system: See Blk 16 ctr_no: PR# FD20202600029 contr:

remarksb:

Block 10: ONE/R, Report shall be submitted concurrently with the "First Article" item either in the shipping container or separately if the report will not fit within the container unfolded. When shipped in the "First Article" container, report shall be enclosed in a paper or plastic envelope.

Block 11, 12, and 13: Defined in Contract

Block 14: Complete mailing address is:

809 MXSS/MXDEB (DODAAC: FB2029)

Bldg 849, Attn: Non-Accountable Bay Mark For: First Article Do Not Post Hill AFB, UT 84056-5713

Page2: 2

Reset:

2025-11-19T07:53:09-0700

CHENEY.DAVID.LEE.1537393579

prep_date: 19 NOV 2025 app_by: Ray Dean Murrison

2025-11-19T08:08:17-0700

MURRISON.RAY.D.JR.1513506828

app_date: 19 NOV 2025

Page: 1 of_pages: 2 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A001 title: Test/Inspection Report sub: First Article Test Report auth: DI-NDTI-80809B/T ref:

req_ofc: 414 SCMS/GUEA dd250: SD appcode: A dist: See Blk 16 freq: See Blk 16 asof: See Blk 16 firstsub: See Blk 16 subsub: See Blk 16 addressee1: 809 MXSS/MXDEB draft1:

reg1: 1 repro1:

addressee2: See Blk 16 draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 1 total_repro: 0 remarks: Block D:

NIIN: 004062752; PN: 69E49480G1; Description: Cable Assembly, Special Purpose, Electrical W5M (HUR894/B)

Block 4: Contractor format acceptable.

Paragraph 10.2 of DI-NDTI-80809B clarified as follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

Block 9: Data submittal shall be marked with "CUI" as a header and footer on each page as well as the following on the cover page:

Controlled by: USAF Controlled by: AFNWC/NM CUI Category: Controlled Technical Information/Export Controlled Distribution/Dissemination Control: Distribution D POC: Peter Miller/801-586-2964/peter.miller.13@us.af.mil/AFNWC/NIMR

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled: Determined 19NOV2025. Other requests for this document must be referred to Minuteman III Systems Directorate, Hill AFB, UT, 84056.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 Of Title 22, United States Code) or the Export Control Reform Act Of 2018 (Chapter 58 Sections 4801-4852 Of Title 50, United States Code). Violations of these export-control laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25 and DoD instruction 2040.02.

group: NSP total_price: 0.00 prep_name: David Cheney line_item:

exhibit: A xtdp: Off xtm: Off othercat:

system: See Blk 16 ctr_no: FD20202600029 contr:

remarksb:

Block 10: ONE/R, Report shall be submitted concurrently with the "First Article" item either in the shipping container or separately if the report will not fit within the container unfolded. When shipped in the "First Article" container, report shall be enclosed in a paper or plastic envelope.

Block 11, 12, and 13: Defined in Contract

Block 14: Complete mailing address is:

809 MXSS/MXDEB (DODAAC: FB2029)

Bldg 849, Attn: Non-Accountable Bay Mark For: First Article Do Not Post Hill AFB, UT 84056-5713

Page2: 2

Reset:

2025-11-19T07:50:13-0700

CHENEY.DAVID.LEE.1537393579

prep_date: 19 NOV 2025 app_by: Ray Dean Murrison

2025-11-19T08:08:42-0700

MURRISON.RAY.D.JR.1513506828

app_date: 19 NOV 2025

Page: 1 of_pages: 2 app: Adobe Professional 8.0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

TDP TM OTHER

7. DD 250 REQ 9. DIST STATEMENT

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION Draft

15. TOTAL 2 2 0

1156244445C

Text Box

Block D:

1. NIIN: 004062752; PN: 69E49480G1; Description: Cable Assembly, Special Purpose, Electrical W5M (HUR894/B)

2. NIIN: 004508176; PN: 69E49476G1; Description: Cable Assembly, Special Purpose, Electrical Branched (HRU859/B), W5A

3. NIIN: 004508177; PN: 69E49477G1; Description: Cable Assembly, Special Purpose, Electrical Branched (HRU857/B), W5C A Block 9: Data submittal shall be marked with "CUI" as a header and footer on each page as well as the following on the cover page:

Controlled by: USAF Controlled by: 414th SCMS CUI Category: Controlled Technical Information/Export Controlled Distribution/Dissemination Control: Distribution D POC: David Cheney/801-777-7442/david.cheney.4@us.af.mil/SCMS/GUEAA

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled: Determined 19NOV2025. Other requests for this document must be referred to 414 SCMS/GUEA, 6031 Gum Lane, Bldg. 1218, Hill AFB, UT 84056-5816.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 Of Title 22, United States Code) or the Export Control Reform Act Of 2018 (Chapter 58 Sections 4801-4852 Of Title 50, United States Code). Violations of these export-control laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25 and DoD instruction 2040.02.

DESTRUCTION: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Blocks 10, 11, 12 and 13: Contractor shall submit initial draft Counterfeit Prevention Plan within 60 days of contract award. Government approval/disapproval/comments will be provided to the contractor within 30 days after receipt, with contractor submittal of final counterfeit protection plan due 15 days after receipt of government comments.

Block 14: Document submission shall be made electronically using MS Office 2016 format. Those documents not compatible with MS Office 2016 shall be delivered in Adobe Acrobat.

CDRL_FD20202600022_v1.pdf

CDRL_FD20202600022_v1

17 PRICE GROUP: NSP

18 ESTIMATED TOTAL PRICE: $0

cpp ADDRESSEE16 REMARKS_3: Bldg 1218 a ADDRESSEE16 REMARKS_37:

a ADDRESSEE16 REMARKS_38:

A CONTRACT LINE ITEM NO:

B EXHIBIT:

TDP:

TM:

OTHER:

CPP SYSTEMITEM: See Blk 16

CPP CONTRACTPR NO: PR# FD20202600029

F CONTRACTOR:

CPP DATA ITEM NO: A002

CPP TITLE OF DATA ITEM: Counterfeit Prevention Plan

CPP SUBTITLE:

CPP AUTHORITY Data Acquisition Document No: DI-MISC-81832

5 CONTRACT REFERENCE:

CPP REQUIRING OFFICE: 414 SCMS/GUEA

7 DD 250 REQ-CPP: DD

9 DIST STATEMENT REQUIRED: See Blk 16

10 FREQUENCY: See Blk 16

12 DATE OF FIRST SUBMISSION: See Blk 16

14 DISTRIBUTION:

8 APP CODE: A

11 AS OF DATE: See Blk 16

13 DATE OF SUBSEQUENT SUBMISSION: See Blk 16 cpp ADDRESSEE16 REMARKS_2: 6031 Gum Lane cpp ADDRESSEE16 REMARKS: 414 SCMS/GUEAA

Repro16 REMARKS_19:

Reg16 REMARKS_19:

Draft16 REMARKS_19:

a ADDRESSEE16 REMARKS_19:

Repro16 REMARKS_18:

Reg16 REMARKS_18:

Draft16 REMARKS_18:

a ADDRESSEE16 REMARKS_18:

Repro16 REMARKS_17:

Reg16 REMARKS_17:

Draft16 REMARKS_17:

a ADDRESSEE16 REMARKS_17:

Repro16 REMARKS_16:

Reg16 REMARKS_16:

Draft16 REMARKS_16:

a ADDRESSEE16 REMARKS_16:

Repro16 REMARKS_15:

Reg16 REMARKS_15:

Draft16 REMARKS_15:

a ADDRESSEE16 REMARKS_15:

Repro16 REMARKS_14:

Reg16 REMARKS_14:

Draft16 REMARKS_14:

a ADDRESSEE16 REMARKS_14:

Repro16 REMARKS_13:

Reg16 REMARKS_13:

Draft16 REMARKS_13:

cpp ADDRESSEE16 REMARKS_13:

Repro16 REMARKS_12:

Reg16 REMARKS_12:

Draft16 REMARKS_12:

cpp ADDRESSEE16 REMARKS_12:

Repro16 REMARKS_11:

Reg16 REMARKS_11:

Draft16 REMARKS_11:

cpp ADDRESSEE16 REMARKS_11: Attn: Kip Moellendorf

Repro16 REMARKS_10:

Reg16 REMARKS_10:

Draft16 REMARKS_10:

cpp ADDRESSEE16 REMARKS_10: Hill AFB, UT 84056

Repro16 REMARKS_9:

Reg16 REMARKS_9:

Draft16 REMARKS_9:

cpp ADDRESSEE16 REMARKS_9: Bldg 1218

Repro16 REMARKS_8:

Reg16 REMARKS_8:

Draft16 REMARKS_8:

cpp ADDRESSEE16 REMARKS_8: 6031 Gum Lane

Repro16 REMARKS_7:

Reg16 REMARKS cpp: 1

Draft16 REMARKS-cpp: 1 cpp ADDRESSEE16 REMARKS_7: 414 SCMS/GUMAC

Repro16 REMARKS_6:

Reg16 REMARKS_6:

Draft16 REMARKS_6:

cpp ADDRESSEE16 REMARKS_6:

Repro16 REMARKS_5:

Reg16 REMARKS_5:

Draft16 REMARKS_5:

cpp ADDRESSEE16 REMARKS_5: Attn: David Cheney

Repro16 REMARKS_4:

Reg16 REMARKS_4:

Draft16 REMARKS_4:

cpp ADDRESSEE16 REMARKS_4: Hill AFB, UT 84056

Repro16 REMARKS_3:

Reg16 REMARKS_3:

Draft16 REMARKS_3:

Repro16 REMARKS_2:

Reg16 REMARKS_2:

Draft16 REMARKS_2:

Reg16 REMARKS: 1

Repro16 REMARKS:

a ADDRESSEE16 REMARKS_20:

Draft16 REMARKS_20:

Reg16 REMARKS_20:

Repro16 REMARKS_20:

a ADDRESSEE16 REMARKS_21:

Draft16 REMARKS_21:

Reg16 REMARKS_21:

Repro16 REMARKS_21:

a ADDRESSEE16 REMARKS_22:

Draft16 REMARKS_22:

Reg16 REMARKS_22:

Repro16 REMARKS_22:

a ADDRESSEE16 REMARKS_23:

Draft16 REMARKS_23:

Reg16 REMARKS_23:

Repro16 REMARKS_23:

a ADDRESSEE16 REMARKS_24:

Draft16 REMARKS_24:

Reg16 REMARKS_24:

Repro16 REMARKS_24:

a ADDRESSEE16 REMARKS_25:

Draft16 REMARKS_25:

Reg16 REMARKS_25:

Repro16 REMARKS_25:

a ADDRESSEE16 REMARKS_26:

Draft16 REMARKS_26:

Reg16 REMARKS_26:

Repro16 REMARKS_26:

a ADDRESSEE16 REMARKS_27:

Draft16 REMARKS_27:

Reg16 REMARKS_27:

Repro16 REMARKS_27:

a ADDRESSEE16 REMARKS_28:

Draft16 REMARKS_28:

Reg16 REMARKS_28:

Repro16 REMARKS_28:

a ADDRESSEE16 REMARKS_29:

Draft16 REMARKS_29:

Reg16 REMARKS_29:

Repro16 REMARKS_29:

a ADDRESSEE16 REMARKS_30:

Draft16 REMARKS_30:

Reg16 REMARKS_30:

Repro16 REMARKS_30:

a ADDRESSEE16 REMARKS_31:

Draft16 REMARKS_31:

Reg16 REMARKS_31:

Repro16 REMARKS_31:

a ADDRESSEE16 REMARKS_32:

Draft16 REMARKS_32:

Reg16 REMARKS_32:

Repro16 REMARKS_32:

a ADDRESSEE16 REMARKS_33:

Draft16 REMARKS_33:

Reg16 REMARKS_33:

Repro16 REMARKS_33:

a ADDRESSEE16 REMARKS_34:

Draft16 REMARKS_34:

Reg16 REMARKS_34:

Repro16 REMARKS_34:

a ADDRESSEE16 REMARKS_35:

Draft16 REMARKS_35:

Reg16 REMARKS_35:

Repro16 REMARKS_35:

a ADDRESSEE16 REMARKS_36:

Draft16 REMARKS_36:

Reg16 REMARKS_36:

Draft16 REMARKS_37:

Reg16 REMARKS_37:

Draft16 REMARKS_38:

Repro16 REMARKS_36:

Repro16 REMARKS_37:

Reg16 REMARKS_38:

Repro16 REMARKS_38:

cpp PREPARED BY: David Cheney

H DATE: 19 NOV 2025

cpp APPROVED BY: Dean Murrison

J DATE: 19 NOV 2025

Page: 1 ofcpp: 1

2025-11-19T07:51:20-0700

CHENEY.DAVID.LEE.1537393579

2025-11-19T08:07:43-0700

MURRISON.RAY.D.JR.1513506828

File details come from the government source that posted it. Updated .