SPRHA2-26-R-0029 CUI.pdf

PDF 1 MB Posted

Attached to
CABLE ASSEMBLY (26-R-0029) Federal contract opportunity
Solicitation number
SPRHA2-26-R-0029
Issued by
Defense Logistics Agency Aviation

About this file

This is a federal solicitation (Standard Form 1447) for Power, Distribution and Specialty Transformer Manufacturing issued by DLA Aviation at Hill Air Force Base, Utah. The solicitation (SPRHA2-26-R-0029) is a 100% small business set-aside specifically for Women-Owned Small Business (WOSB) with a NAICS code of 335311 and size standard of 800 employees. The solicitation covers three cable assembly items for the MMIII Weapon System, with manufacturers required to provide first article testing and production items.

Key details include a solicitation issue date of January 8, 2026, with offers due by February 16, 2026, at 2:00 PM. The contract requires first article testing and production of cable assemblies with specific part numbers (69E49480G1, 69E49476G1, 69E49477G1), with quantities ranging from 1-40 units per line item. Delivery is expected within 120 calendar days after contract award, with contractors required to provide detailed documentation including supply chain traceability, counterfeit prevention plans, and comply with military packaging and marking standards. The evaluation will primarily be based on price, with first article testing costs of $1,500 per lot factored into the award decision.

View the file

Other files for this federal contract opportunity

Other files attached to CABLE ASSEMBLY (26-R-0029), newest first.
File Type Posted
EI_69E49477G1_v1.pdf PDF
EI_69E49476G1_v1.pdf PDF
SPRHA2-26-R-0029-0003 CUI.pdf PDF
EI_69E49480G1_v1.pdf PDF
SPRHA2-26-R-0029-0002 CUI.pdf PDF
SPRHA2-26-R-0029-0001 CUI.pdf PDF
CDRLs.pdf PDF
PackagingSOW.pdf PDF
EDR.pdf PDF
EDL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRHA2-26-R-0029

X X

6.SOLICITATION ISSUE DATE

8 JAN 2026

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 335311

8(A) SIZE STANDARD: 800

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

Less than a truckload shipment is acceptable and authorized. Early and partial deliveries are acceptable at no increase in cost to the Government. US Contractors Only.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR

INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD

ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO

THE TERMS AND CONDITIONS STATED HEREIN. *120

RATING

DX: A1

3. AWARD/EFFECTIVE DATE

SPRHA2

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:A

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Power, Distribution and Specialty Transformer Manufacturing

9. (Agency Use) Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein. All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*

16FEB2026 2:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.2327003.)

X

7. ISSUED BY CODE

DLA AVIATION OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 840565820

BUYER: Johnny J Wakefield/DLA/AUB johnny.wakefield.2@us.af.mil Phone: (385) 591 3547 Fax: (000) 0000000

X

1. THIS CONTRACT IS A RATED ORDER UNDER DPAS

(15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

1237209679C CUI Stamp

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE OF ITEMS

INVOLVED

DATE AND LOCAL TIME 16 FEB 2026 2:00 PM

SOLICITATION NUMBER SPRHA226R0029

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Johnny J Wakefield/DLA/AUB

DLA AVIATION OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 840565820

SPRHA226R0029

PART I THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

On Time Delivery Improvement

In accordance with the 448th Supply Chain Management Wing (448th SCMW), Air Force Sustainment Center Contracting Directorate (AFSC/OK) and Defense Logistics Agency (DLA) Aviation Contracting On-Time Delivery (OTD) Improvement Initiative. DLA Contracting has established the following OTD requirements with the intent to improve OTD.

As detailed in section B of the Solicitation, the government has developed a Required Delivery Schedule (RDS), which is reflective of the customer need date as well as projected Production Lead Time (PLT). The government RDS considered such factors as historical data and active contracts. In developing your response, the government requests your company review the RDS provided and propose an achievable delivery schedule based on your internal PLT review.

With input from suppliers, the Contracting Officer may negotiate an updated RDS representative of all factors stated above along with any new information that may become available.

Item No.

NSN: 6150004062752 AH

CABLE ASSEMBLY,SPEC

MMIII Weapon System Manufacturer Part Number 07868 69E49480G1 Associated Document(s) Line Item(s)

FD20202600029 0001

Priority: R Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

IAW MILSTD130

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Bid A First Article Required Item No.

0001AA

Not Separately Priced

Bid A First Article Required Quantity U/I Unit Price

1 LO NSP

FATR

First Article Test Report

TEST REPORT IAW DD 14231 ATTACHED HERETO

CDRL A001

Associated Document(s) Line Item(s)

FD20202600029 0004

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW 1423 A001 Type / Ship To PACRN Mark For

B 1423 IAW 1423 A001

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

B 1423 1 LO *120 Calendar Days NonMilStrip

Proposed Delivery

B 1423 1 LO

The First Article Test Report is to be submitted concurrently with the First Article.

Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report.

Contractor will coordinate submission with contract administrator.

Bid A First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AB AA

FA

First Article

FIRST ARTICLE SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202600029 0001

Limitations of Liability: Other Than High Value Item

Bid A First Article Required

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FB2029 DESTINATION

Type / Ship To PACRN Mark For

B FB2029 FIRST ARTICLE DO NOT POST

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

B FB2029 1 EA *120 Calendar Days

Proposed Delivery

B FB2029 1 EA

Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST ARTICLE, DO NOT POST.

Contractor shall notify the Government 30 days prior to shipment.

Approved First Articles will be forwarded to supply.

Bid A First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

39 EA

CLIN ACRN ACRN Total

0001AC AA

PROD

Production Article

PRODUCTION ARTICLE SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202600029 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Bid A First Article Required

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 Account 09 Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

A FB2029 39 EA *120 Calendar Days

Proposed Delivery

A FB2029 39 EA

Bid B First Article NOT Required Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

40 EA

CLIN ACRN ACRN Total

0001AD AA

PROD

PRODUCTION ARTICLE SAME AS BASIC LINE ITEM ABOVE

NSN:6150004062752

Associated Document(s) Line Item(s)

FD20202600029 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:

IAW MILSTD130

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Type / Ship To PACRN Mark For A FB2029 Account 09

Bid B First Article NOT Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

A FB2029 40 EA 8 JAN 2027 NonMilStrip

Proposed Delivery

A FB2029 40 EA

Item No.

NSN: 6150004508176 AH

CABLE ASSEMBLY,SPEC

MMIII WEAPON SYSTEM

Manufacturer Part Number 07868 69E49476G1 Associated Document(s) Line Item(s)

FD20202600029 0002

Priority: R Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

IAW MILSTD130

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Bid A First Article Required Item No.

0002AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

FATR

First Article Test Report

TEST REPORT IAW DD 14231 ATTACHED HERETO

CDRL A001

Associated Document(s) Line Item(s)

FD20202600029 0004

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW 1423 A001

Bid A First Article Required Type / Ship To PACRN Mark For

B 1423 IAW 1423 A001

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

B 1423 1 LO *120 Calendar Days NonMilStrip

Proposed Delivery

B 1423 1 LO

The First Article Test Report is to be submitted concurrently with the First Article.

Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report.

Contractor will coordinate submission with contract administrator.

Bid A First Article Required Item No.

0002AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0002AB AA

FA

First Article

FIRST ARTICLE SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202600029 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FB2029 DESTINATION

Type / Ship To PACRN Mark For

B FB2029 FIRST ARTICLE DO NOT POST

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

Bid A First Article Required B FB2029 1 EA *120 Calendar Days

Proposed Delivery

B FB2029 1 EA

Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST ARTICLE, DO NOT POST.

Contractor shall notify the Government 30 days prior to shipment.

Approved First Articles will be forwarded to supply.

Bid A First Article Required Item No.

0002AC

Firm Fixed Price Quantity U/I Unit Price Amount

39 EA

CLIN ACRN ACRN Total

0002AC AA

PROD

Production Article

PRODUCTION ARTICLE SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202600029 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 Account 09 Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

A FB2029 39 EA *120 Calendar Days

Proposed Delivery

Bid A First Article Required

A FB2029 39 EA

Bid B First Article NOT Required Item No.

0002AD

Firm Fixed Price Quantity U/I Unit Price Amount

40 EA

CLIN ACRN ACRN Total

0002AD AA

PROD

PRODUCTION ARTICLE SAME AS BASIC LINE ITEM ABOVE

NSN:6150004508176

Associated Document(s) Line Item(s)

FD20202600029 0002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:

IAW MILSTD130

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Type / Ship To PACRN Mark For A FB2029 Account 09 Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

A FB2029 40 EA 8 JAN 2027 NonMilStrip

Proposed Delivery

A FB2029 40 EA

Item No.

NSN: 6150004508177 AH

CABLE ASSEMBLY,SPEC

MMIII WEAPON SYSTEM

Manufacturer Part Number 07868 69E49477G1 Associated Document(s) Line Item(s)

FD20202600029 0003

Priority: R IUID Required: Yes Physical Item Markings:

IAW MILSTD130

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Bid A First Article Required Item No.

0003AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

FATR

First Article Test Report

TEST REPORT IAW DD 14231 ATTACHED HERETO

CDRL A001

Associated Document(s) Line Item(s)

FD20202600029 0004

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW 1423 A001 Type / Ship To PACRN Mark For

B 1423 IAW 1423 A001

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

B 1423 1 LO *120 Calendar Days NonMilStrip

Proposed Delivery

B 1423 1 LO

The First Article Test Report is to be submitted concurrently with the First Article.

Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report.

Contractor will coordinate submission with contract administrator.

Bid A First Article Required Item No.

0003AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0003AB AA

FA

First Article

FIRST ARTICLE SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202600029 0003

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FB2029 DESTINATION

Type / Ship To PACRN Mark For

B FB2029 FIRST ARTICLE DO NOT POST

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

B FB2029 1 EA *120 Calendar Days

Proposed Delivery

B FB2029 1 EA

Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST ARTICLE, DO NOT POST.

Contractor shall notify the Government 30 days prior to shipment.

Approved First Articles will be forwarded to supply.

Bid A First Article Required Item No.

0003AC

Firm Fixed Price Quantity U/I Unit Price Amount

39 EA

CLIN ACRN ACRN Total

0003AC AA

PROD

Production Article

PRODUCTION ARTICLE SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202600029 0003

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 Account 09 Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

A FB2029 39 EA *120 Calendar Days

Proposed Delivery

A FB2029 39 EA

Bid B First Article NOT Required Item No.

0003AD

Firm Fixed Price Quantity U/I Unit Price Amount

40 EA

CLIN ACRN ACRN Total

0003AD AA

PROD

PRODUCTION ARTICLE SAME AS BASIC LINE ITEM ABOVE

NSN:6150004508177

Associated Document(s) Line Item(s)

FD20202600029 0003

Bid B First Article NOT Required Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:

IAW MILSTD130

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Type / Ship To PACRN Mark For A FB2029 Account 09 Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

A FB2029 40 EA 8 JAN 2027 NonMilStrip

Proposed Delivery

A FB2029 40 EA

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

NSN: DATA AH

Counterfeit Prevention Plan

CDRL A002

Associated Document(s) Line Item(s)

FD20202600029 0005

Priority: R ROUTINE

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW 1423 A004 New Material, Surplus Not Acceptable North American Free Trade Agreement (NAFTA) Type / Ship To PACRN Mark For

B 1423 IAW 1423

Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

B 1423 1 LO *30 Calendar Days

Proposed Delivery

B 1423 1 LO

Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report.

Contractor will coordinate submission with contract administrator.

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A FB2029

FB2029 OO ALC DDHU CNTRL RCV

CP 385 519 8898

5851 F AVE BLDG 849W

HILL AFB UT 84056

HILL AFB UT 84056 UT 84056-5713

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: B 1423

IAW DD FORM 1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: B FB2029

809 MXSS/MXDEB

BLDG 849 ATTN: NON-ACCOUNTABLE BAY

(DEAR JOHN BAY)

TRANSPORTATION OFFICE

HILL AIR FORCE BASE UT 84056-5713

UNITED STATES

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C01 Superseded Part Numbered Items (FEB 2025) When the award identifies supplies by manufacturer's name, Commercial and Government Entity (CAGE) code, and part number, the specified item(s) are the only item(s) acceptable under this contract. If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.

C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016)

The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.

C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)

(1) By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.

(2) Supply Chain Traceability Documentation

(i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification; national stock number; manufacturing source; manufacturing sources Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.

(ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- AvoidanceProgram/).

(iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts.

Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

(3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

MIL-STD-130: Items shall be marked in accordance with MIL-STD-130. The National Stock Number (NSN), and when assigned, the Configuration Item Identifier (CII), serial number, and military type designation information shall be marked on major assemblies, units, groups, and sets. Special attention must be given to requirements governing the application of the actual manufacturer's Federal Supply Code for Manufacturers (FSCM) to the physical item. Items which are excluded in accordance with paragraph 1.1 of MIL-STD-130, Revision M, shall be marked in accordance with the appropriate document.

2. PACKAGE AND CONTAINER MARKING: Shipments will not be made until the NSN has been assigned, unless specifically authorized by the Contracting Officer.

MIL-STD-129/ASTM-D-3951:

a. Interior packages and shipping containers shall be marked in accordance with MIL-STD-129 when Military packing is specified and ASTM-D-3951 when commercial packaging is specified. The requirements of paragraph 2.h apply regardless of which packaging is utilized.

(1) Design manufacturer's name, trademark or manufacturer's code (from Cataloging Handbook H4-1 or H4-2), identifying number, and serial number, when applicable, shall be included in the identification marking.

(2) When applicable, the Air Force project designator code shall be included as the last line of the address marking and the project name related to the project code shall be marked in the clear on the exterior shipping container.

b. Tags and labels, when required, shall be contractor's tags or labels conforming to the requirements of MIL-STD-129 or as approved by the procuring activity. Contractor's forms which indicate serviceable condition shall not be any shade of green or red. Labels are authorized to be used on metal containers.

Items requiring technical order (T.O.) certification shall be annotated on inner and outer container tags or label with T.O. compliance.

c. When dummy containers are used in a unitized load, the dummy containers shall be clearly marked "DUMMY CONTAINER" and located in the load so that the marking will be plainly visible to receiving and storage personnel.

d. All interior packages and shipping containers for articles and materials classified as hazardous or restricted under provisions of Title 49, Code of Federal Regulations, or AFR 71-4/DLAM 4145.3/TM 38-250/NAVSUP PUB 505/MCO P 4030.19 shall be marked, regardless of exemption for mode of transportation, with proper shipping name of item; flash point of all liquids having a flash point of 200 degrees F. or below; and percentage concentration of acids and corrosive liquids. In addition, the quantity of each hazardous or restricted material included in a container shall be annotated adjacent to the shipping name of the item, e.g., Acetic Acid (80% concentration) -- 1 qt.

e. On shipments of firearms regardless of mode of transportation, selected elements of identification and contractor data markings shall be omitted or obliterated in accordance with the requirements of MIL-STD-129 regarding sensitive items and packing lists shall be placed only inside the containers.

f. Special markings for packages and containers when specified on AFMC Form 158 shall be complied with as a part of MIL-STD-129.

g. All special coated terneplate containers shall be marked with the legend "CAUTION--DO NOT REUSE AS

FOOD CONTAINERS."

h. Bar code markings in accordance with MIL-STD-129 shall apply to all units, intermediate and exterior containers for all items going into stock regardless of package size or levels of package specified (including commercial packaging). In addition to the NSN/NATO stock number, the exterior shipping container shall include the 13 digit contract number (plus, if applicable, the four digit call number). Excluded from Bar Code Marking are:

(1) Foreign Military Sales.

(2) Direct Vendor Delivery (DVD)/Government Furnished Equipment (GFE) shipments.

(3) Multipack Exterior Shipping Containers. (Unit and intermediate containers do require a bar coded NSN/NATO stock number. However, the next container (unit or intermediate) inside the multipack will also require a bar coded NSN/NATO stock number and contract number with call number, if applicable, in the lower right hand corner).

(4) All unpacked or uncrated items; e.g., vehicles, tires, etc.

i. Shipments of wheeled items weighing 2,000 pounds or more and scheduled for transportation by military aircraft will be marked with the individual axle weights in accordance with MIL-STD-129.

3. WARRANTED ITEMS: When the contract contains warranty requirements, warranty information shall be applied on containers and items as follows:

a. Container markings shall be as specified in MIL-STD-129. The period or conditions of the warranty shall be specifically stated, i.e., landings, flight hours, operating hours, days from shipping date, etc.

b. Items shall be marked in accordance with requirements of MIL-STD-130. Markings shall be located in a manner so as to be conspicuous to the person removing the item from service. When no deleterious effect or functional degradation is caused, the markings shall be black letters on yellow FED-STD-595 color 13655) background. The marking shall include the same period or condition required on the containers.

SHIPPING CONTAINER MARKING

All shipping containers shall be marked meeting the following criteria:

(a) MIL-STD-129 R, Standard Practice for Military Marking.

(b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL-STD-129 R.

(c) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 R , e.g., unit serial numbers, original equipment manufacturer’s (OEM) name, or OEM model number, as specified on the AFMC Form 158:

PACRN(s) Applicable

Additional Bar Coding or Marking Requirements (if applicable)

PAA Not Applicable PAB Not Applicable PAC Not Applicable

MILITARY PACKAGING AND MARKING (NSN: 6150004508177)

Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.

The MIL-STD-2073-1 / No Packaging Data Available is as follows:

PACRN PRESERVATION LVL PACKING LVL QUP

PAA MIL B 001

PACRN SUPPLEMENTAL PACKAGING

PAA NOT APPLICABLE

MILITARY PACKAGING AND MARKING (NSN: 6150004062752)

Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.

PACRN QUP ICQ PS

MT

C D

PS

ML

WP

ML

CU

DU

C T

U C

I C

U C L

SM

PAB 001 000 41 1 00 EA NA A NS 00 B 00

WGT LGTH WDTH DPTH CUBE O

P

I

5.80 24.5 16.5 4.0 0.936 M

PACRN PACK

LVL

PRES

LVL

SUPPLEMENTAL PACKAGING

PAB B MIL

MILITARY PACKAGING AND MARKING (NSN: 6150004508176)

Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.

PACRN QUP ICQ PS

MT

C D

PS

ML

WP

ML

CU

DU

C T

U C

I C

U C L

SM

PAC 001 000 42 1 00 00 GT A E5 00 B 00

WGT LGTH WDTH DPTH CUBE O

P I

40.30 24.0 24.0 6.0 2.000 O

PACRN PACK

LVL

PRES

LVL

SUPPLEMENTAL PACKAGING

PAC B MIL

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS

(FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Lot/Item Government Test/Inspection Requirements 0001 (See Below) 0002 (See Below) 0003 (See Below)

Lot/Item Contractor Test/Inspection Requirements 0001 (See Below) 0002 (See Below) 0003 (See Below)

Contractor Testing Requirements

In accordance with 69E49480 and sub tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package and Correct Marking. Send to electronics Lab or Bay K for review of contractor testing and checkout at labs discretion. Provide to 414th EN for dry-fit.

Contractor Testing Requirements

In accordance with 69E49476 and sub tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package and Correct Marking. Send to electronics Lab or Bay K for review of contractor testing and checkout at labs discretion. Provide to 414th EN for dry-fit.

Contractor Testing Requirements

In accordance with 69E49477 and sub tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package and Correct Marking. Send to electronics Lab or Bay K for review of contractor testing and checkout at labs discretion. Provide to 414th EN for dry-fit.

Government Testing Requirements

In accordance with 69E49480 and sub tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package and Correct Marking. Send to electronics Lab or Bay K for review of contractor testing and checkout at labs discretion. Provide to 414th EN for dry-fit.

Government Testing Requirements

In accordance with 69E49476 and sub tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package and Correct Marking. Send to electronics Lab or Bay K for review of contractor testing and checkout at labs discretion. Provide to 414th EN for dry-fit.

Government Testing Requirements

In accordance with 69E49477 and sub tier engineering documents with emphasis on Overall Configuration, No Damage, Complete Certs Package and Correct Marking. Send to electronics Lab or Bay K for review of contractor testing and checkout at labs discretion. Provide to 414th EN for dry-fit.

Disposition of the First Article shall be as follows:

Lot/Item Approved 0001 Forwarded to: Supply 0002 Forwarded to: Supply 0003 Forwarded to: Supply

Lot/Item Disapproved 0001 Retained by: FAI Lab pending instructions from contractor.

0002 Retained by: FAI Lab pending instructions from contractor.

0003 Retained by: FAI Lab pending instructions from contractor.

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0001AA, 0002AA, 0003AA, 0004

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-8 TIME OF DELIVERY (JUN 1997)

(IAW FAR 11.404(a)(2))

(a) The Government requires delivery to be made according to the following schedule:

DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

ANNOTATE YOUR PROPOSED DELIVERY, IF ANY, UNDER THE GOVERNMENT’S DELIVERY SET FORTH UNDER EACH

ITEM IN THE SCHEDULE.

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-34 F.O.B. DESTINATION (NOV 1991)

(IAW FAR 47.303-6(c))

52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT (FEB 1999)

(IAW FAR 47.305-4(c))

Applicable Item No(s)

0001AB 0002AB 0003AB

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b))

Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

COMMERCIAL BILL OF LADING SHIPMENTS – CARRIER’S RATES

The contractor shall ensure that proposed carrier’s rates are equal to or better than rates available to the Government.

Contact the transportation officer for this contract, as identified by the administrative contracting officer, for confirmation that the proposed carrier’s rates are no higher than those otherwise available to the government. List the shipping costs on the invoice to the government and attach a copy of the carrier’s billing. Failure to properly annotate the invoice and provide a copy of the carrier’s billing may result in those cost not being reimbursed or only partially reimbursed.

UNILATERAL AMENDED SHIPPING INSTRUCTIONS (ASIs), F.O.B. ORIGIN

(a) An ASI is a change to the shipping instructions of one or more units or shipment lots of a contract line item.

Multiple ASIs for multiple contract line items may be issued under one document.

(b) Unilateral ASIs with changes only to the "Ship To and Mark For" instructions, issued 20 calendar days or more before the contract scheduled delivery date, shall be accepted by the Contractor at no change in contract price.

(c) All other ASIs, including those requiring a change to the "Ship To and Mark For" which are issued 19 days or less before the contract scheduled delivery date; and those for changes to the preservation, packaging, and packing requirements or the f.o.b. point, shall be subject to the negotiation of an equitable adjustment under the contract.

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

_____________Combination__________________________________________

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. ______Not Applicable

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table Field Name in WAWF Data to be entered in

WAWF

Pay Official DoDAAC See block 14 Issue By DoDAAC See block 7 Admin DoDAAC See block 12 Inspect By DoDAAC See Section B Ship To Code See Section B Ship From Code See Section B Mark For Code See Section B Service Approver (DoDAAC)

N/A

Service Acceptor (DoDAAC)

N/A

Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS

Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. ______________ Not Applicable ______________________________

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

(The above Clause/Provision has been modified.)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 .FC04 64 6 47 GH 25133G 01N000 00000 EERRCT 503000 F03000 $0.00

PSR: K42204 FSR: 001679 DSR: 178448 CIN: F2DCCW5345A1090000AA

ACRN TOTAL $ 0.00

TRANSPORTATION APPROPRIATION CHARGEABLE

The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI "TAA" is for the same line item(s) as ACRN "AA".

TAI ATAC

TAA FRS3

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Tyler Ouellette at 385 519 -8206 , FAX 000 000 -0000 , email tyler.ouellette@dla.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Department of the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES

(DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)

(IAW DFARS 204.404-70(a))

252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)

(IAW DFARS 204.7109(a))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

First Article Item **Quantity ***Calendar Days ****Type/Location

0001AB 1 120 BFB2029

0002AB 1 120 BFB2029

0003AB 1 120 BFB2029

(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item **Approval Days ELIN No.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .