CDRLs A-B-C.pdf

PDF 337 KB Posted

Attached to
Support for UTTR Optical Tracking Mounts Remote Control System
Solicitation number
F2DTAG
Issued by

About this file

This image is an Adobe PDF portfolio launch screen that recommends opening the document in Acrobat X or Adobe Reader X (or later versions). The screen displays the Adobe PDF logo, a red and white document graphic, and a "Get Adobe Reader Now!" button. The purpose of this screen is to guide users to download the recommended software version for optimal PDF viewing experience.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of

(Updated 20250617)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of

(Updated 20250617)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft

Final

Reg

Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785

DD Form 1423, "Contract Data Requirements List"

CurrentPage:

PageCount:

Select Classification from drop-down list.: 1

CUI Indicator Information:

Click on this button to attach a file(s).:

A. CONTRACT LINE ITEM NUMBER: 0007

exhibit: A

C. CATEGORY: Select for "TDP.": 0

C. CATEGORY: Select for "TM.": 0

C. CATEGORY: Select for "OTHER.": 1

C. CATEGORY: Enter specification for "Other.": See Block 16

System: CINE-T Support

ContractNum:

Contractor:

1. DATA ITEM NUMBER: A001

titleDataItem: Software Documentation Format subtitle:

4. AUTHORITY (Data Acquisition Document Number): DI-SESS-80776A (Tailored) contractRef: SOW Paragraph 2(1) reqOffice: HQ UTTR/A5R

7. DD 250 REQUIREMENT: No

8. APPROVAL CODE : N/A

9. DISTRIBUTION STATEMENT REQUIRED: N/A

freq: 1 per contract period asOfDate: N/A dateFirstSub: 30 days ARO dateSubseqSub: N/A

16. REMARKS: BLOCK 14: Unless otherwise specified, submission will provided electronically in contractor's desired format via email to: tyler.bielstein.1@us.af.mil , devere.parkinson@us.af.mil

(1) Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

(2) Eglin Cine-Theodolite (Cine-T) Integration Support which includes the documentation detailing the exact format of the mount feedback messages.

a. Documentation detailing the exact format of the mount feedback message leaving the UTTR Cine-T Servo Digital Controller (SDC) on TCP Port 3000 connecting to the host computer TCP Port 3000, including:

Byte # Length Value Measurement Unit Description

b. Documentation detailing the exact format of the mount feedback with ID message leaving the UTTR Cine-T host computer UDP Port 6935 to the TDOP computer UDP Port 49500, including:

Byte # Length Value Measurement Unit Description

Click to add continuation field for Remarks:

14. DISTRIBUTION - a. ADDRESSEE, new line:

15.TOTAL - Total draft copies is automatically calculated.: 0

15.TOTAL - Total final regular copies is automatically calculated.: 0

15.TOTAL - Total final reproducible copies is automatically calculated.: 0 priceGrp:

estTotalPrice:

remarks:

preparedBy: JOSE E. LOPEZ Civ, USAF

J. SIGNATURE: H. SIGNED ON 20250818

J. SIGNATURE: J. SIGNED ON 20250818

J. SIGNATURE:

approvedBy: CHRISTIAN S. PEAL Civ, USAF

Click to add additional data items.:

Click to delete additional data items.:

viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other

Page of

(Updated 20250617)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of

(Updated 20250617)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft

Final

Reg

Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785

DD Form 1423, "Contract Data Requirements List"

CurrentPage:

PageCount:

Select Classification from drop-down list.: 1

CUI Indicator Information:

Click on this button to attach a file(s).:

A. CONTRACT LINE ITEM NUMBER: 0007

exhibit: B

C. CATEGORY: Select for "TDP.": 0

C. CATEGORY: Select for "TM.": 0

C. CATEGORY: Select for "OTHER.": 1

C. CATEGORY: Enter specification for "Other.": See Block 16

System: CINE-T Support

ContractNum:

Contractor:

1. DATA ITEM NUMBER: B001

titleDataItem: Software Upgrade Progress Report subtitle:

4. AUTHORITY (Data Acquisition Document Number): DI-SESS-80776A (Tailored) contractRef: SOW Paragraph 2(5) reqOffice: HQ UTTR/A5R

7. DD 250 REQUIREMENT: No

8. APPROVAL CODE : N/A

9. DISTRIBUTION STATEMENT REQUIRED: N/A

freq: 1 per contract period asOfDate: N/A dateFirstSub: 30 days ARO dateSubseqSub: N/A

16. REMARKS: BLOCK 14: Unless otherwise specified, submission will provided electronically in contractor's desired format via email to: tyler.bielstein.1@us.af.mil , devere.parkinson@us.af.mil

(1) Requirements for programming software into devices or assemblies including a description of the input media and the procedures for validating that the software has been installed correctly.

(2) Content. Technical Data Package shall include the following:

(3) Dome drive c-source codes and software

This refers to the deliverables under the UTTR Dome Drive Control Software Upgrade, SOW 2(5) which includes modified c-source code and the executable software.

a. Modified dome drive c-source codes

b. Executable dome drive control software.

(4) UTTR Cine-T Slip-Ring Data Throughput Upgrade (SOW 2(4))

a. Slip-ring Reconfiguration schematic diagram

(5) Specifications in accordance with MIL-STD-31000-5.3.3.7

(6) Software documentation in accordance with MIL-STD-31000-5.3.3.8

Click to add continuation field for Remarks:

14. DISTRIBUTION - a. ADDRESSEE, new line:

15.TOTAL - Total draft copies is automatically calculated.: 0

15.TOTAL - Total final regular copies is automatically calculated.: 0

15.TOTAL - Total final reproducible copies is automatically calculated.: 0 priceGrp:

estTotalPrice:

remarks:

preparedBy: JOSE E. LOPEZ Civ, USAF

J. SIGNATURE: H. SIGNED ON 20250818

J. SIGNATURE: J. SIGNED ON 20250818

J. SIGNATURE:

approvedBy: CHRISTIAN S. PEAL Civ, USAF

Click to add additional data items.:

Click to delete additional data items.:

viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other

Page of

(Updated 20250617)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of

(Updated 20250617)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft

Final

Reg

Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785

DD Form 1423, "Contract Data Requirements List"

CurrentPage:

PageCount:

Select Classification from drop-down list.: 1

CUI Indicator Information:

Click on this button to attach a file(s).:

A. CONTRACT LINE ITEM NUMBER: 0007

exhibit: C

C. CATEGORY: Select for "TDP.": 0

C. CATEGORY: Select for "TM.": 0

C. CATEGORY: Select for "OTHER.": 1

C. CATEGORY: Enter specification for "Other.": See Block 16

System: CINE-T Support

ContractNum:

Contractor:

1. DATA ITEM NUMBER: C001

titleDataItem: Software Upgrade Progress Report subtitle:

4. AUTHORITY (Data Acquisition Document Number): DI-SESS-80776A (Tailored) contractRef: SOW Paragraph 4 reqOffice: HQ UTTR/A5R

7. DD 250 REQUIREMENT: No

8. APPROVAL CODE : N/A

9. DISTRIBUTION STATEMENT REQUIRED: N/A

freq: Weekly asOfDate: N/A dateFirstSub: 30 days ARO dateSubseqSub: N/A

16. REMARKS: BLOCK 14: Unless otherwise specified, submission will provided electronically in contractor's desired format via email to: tyler.bielstein.1@us.af.mil , devere.parkinson@us.af.mil

(1). Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

(2). Content. Technical Data Package shall include one or more of the following:

A. Production drawings/models and associated lists in accordance with MIL-STD-31000-5.3.3.3. They shall document directly or by reference the following, as applicable:

B. Critical manufacturing processes and assembly sequences C. Diagrams.

D. Mechanical and electrical connections.

E. Inspection, test and evaluation criteria.

F. Equipment calibration requirements.

G. Quality assurance requirements.

H. Hardware marking requirements.

I. Requirements for reliability, maintainability, environmental conditioning, shock and vibration testing and other operational or functional tests.

J. Requirements for programming software into devices or assemblies including a description of the input media and the procedures for validating that the software has been installed correctly.

(3) Special consideration items and processes.

A. . Commercial drawings/models and associated lists in accordance with MIL-STD-31000-5.3.3.4

(4) Project Management & Communication.

a. The Contractor will provide regular progress updates to UTTR.

(5) Quality assurance provisions in accordance with MIL-STD-31000-5.3.3.10.

(6) Specifications in accordance with MIL-STD-31000-5.3.3.7.

(7) Software documentation in accordance with MIL-STD-31000-5.3.3.8

Click to add continuation field for Remarks:

14. DISTRIBUTION - a. ADDRESSEE, new line:

15.TOTAL - Total draft copies is automatically calculated.: 0

15.TOTAL - Total final regular copies is automatically calculated.: 0

15.TOTAL - Total final reproducible copies is automatically calculated.: 0 priceGrp:

estTotalPrice:

remarks:

preparedBy: JOSE E. LOPEZ Civ, USAF

J. SIGNATURE: H. SIGNED ON 20250818

J. SIGNATURE: J. SIGNED ON 20250818

J. SIGNATURE:

approvedBy: CHRISTIAN S. PEAL Civ, USAF

Click to add additional data items.:

Click to delete additional data items.:

File details come from the government source that posted it. Updated .