CDRL_QESA_CMM_MAINT_FY27.pdf
PDF 160 KB Posted
- Solicitation number
- W15QKN26RA097
About this file
This document is a PDF viewer error message, not a federal contract opportunity file. The document contains only Adobe Reader troubleshooting information and instructions for upgrading to the latest version of Adobe Reader software. No contract details, solicitation information, requirements, or procurement data are present in this file.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitation Final 20261002_.pdf | ||
| PWS_CMM_MAINTENANCE_REPAIR_FY27 (FINAL)_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024
Page of (Updated 20260213) Instructions
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of (Updated 20260213)
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| CUI Indicator Information: |
| Click on this button to attach a file(s).: |
| show: |
| hide: |
| A. CONTRACT LINE ITEM NUMBER: |
| exhibit: |
| C. CATEGORY: Select for "TDP.": 0 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 1 |
| C. CATEGORY: Enter specification for "Other.": ADMIN/MGT DATA |
| System: QESA CMM MAINTENANCE AND REPAIR |
| ContractNum: |
| Contractor: |
| 1. DATA ITEM NUMBER: A001 |
| 1. DATA ITEM NUMBER: A002 |
| 1. DATA ITEM NUMBER: A003 |
| titleDataItem: Calibration Certificate/Report |
| titleDataItem: Training Materials |
| titleDataItem: Commercial Off-The-Shelf (COTS) Manuals |
| subtitle: Calibration Report |
| subtitle: Security Training Certificates |
| 4. AUTHORITY (Data Acquisition Document Number): DI-QCIC-80798C |
| 4. AUTHORITY (Data Acquisition Document Number): DI-ILSS-80872 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-TMSS-80527C |
| contractRef: PWS 6.1 |
| contractRef: PWS 6.2 |
| contractRef: PWS 6.3 |
| reqOffice: FCDD-ACE-QED |
| reqOffice: FCDD-ACE -QED |
| reqOffice: FCDD-ACE-QED |
| 7. DD 250 REQUIREMENT: NO |
| 7. DD 250 REQUIREMENT: NO |
| 7. DD 250 REQUIREMENT: NO |
| 8. APPROVAL CODE : |
| 9. DISTRIBUTION STATEMENT REQUIRED: A |
| 9. DISTRIBUTION STATEMENT REQUIRED: A |
| 9. DISTRIBUTION STATEMENT REQUIRED: A |
| freq: AS REQ |
| freq: AS REQ |
| freq: AS REQ |
| asOfDate: AS REQ |
| asOfDate: AS REQ |
| asOfDate: AS REQ |
| dateFirstSub: AS REQ |
| dateFirstSub: AS REQ |
| dateFirstSub: AS REQ |
| dateSubseqSub: AS REQ |
| dateSubseqSub: AS REQ |
| dateSubseqSub: AS REQ |
| 16. REMARKS: Blocks 10 through 13: Reports shall be submitted within 30 days of equipment calibration |
Block 14: Electronic Copies of all data submittals shall be submitted to the Contracting Officer's Representative (COR) and Technical POC.
COR:
James McGoonan james.mcgoonan.civ@army.mil
Technical POC:
Franklin VanWhy franklin.g.vanwhy2.civ@army.mil
16. REMARKS:
- AT Level 1 Anti Terrorism training (PWS 9.2):
The contractor shall complete AT Level 1 training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, and then annually thereafter.
- iWATCH “See Something, Say Something” (PWS 9.4):
The contractor (including subcontractors) shall receive/participate in training within 45 calendar days after contract start date and annually thereafter. The contractor shall submit a certificate of completion within 14 calendar days of completion.
- Counterintelligence Awareness and Reporting (CIAR) (PWS 9.6):
The contractor shall complete initial CIAR training within 30 calendar days of reporting for duty and must also complete annual CIAR awareness training. The contractor shall submit a certificate for each employee that completed the training.
Block 14 - Electronic Copies of all data submittals shall be submitted to the Contracting Officer's Representative (COR) and Technical POC
Contractor's format is acceptable. Online training has a sandard certificate format wich is accptble
E-Mail certificates to:
COR:
James McGoonan james.mcgoonan.civ@army.mil
Technical POC Franklin VanWhy franklin.g.vanwhy2.civ@army.mil
16. REMARKS: Interactive Electronic Technical Manuals (IETMs) or PDFs are preferred for electronic COTS manuals. PDF files shall be searchable, capable of having links added, and have fonts embedded. If paper manuals are acquired, the data shall be clearly legible and on paper of sufficient quality for long term use.
Block 10 through 13: Manual(s) shall be provided upon completion of the service.
Block 14: If manuals are being provided via electronic file, the following personnel shall be Government recipients:
COR:
James McGoonan james.mcgoonan.civ@army.mil
Technical POC Franklin VanWhy franklin.g.vanwhy2.civ@army.mil
| Click to add/remove continuation field for Remarks: |
| Click to delete CURRENT data items for 1 through 18, unless this is the only data item.: |
| Click to add a page of data items for 1 through 18 immediately following the current page.: |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: COR |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Technical POC |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: COR |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Technical POC |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: COR |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Technical POC |
| 15.TOTAL - Total draft copies is automatically calculated.: 0 |
| 15.TOTAL - Total draft copies is automatically calculated.: 0 |
| 15.TOTAL - Total draft copies is automatically calculated.: 0 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 2 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 2 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 2 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 0 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 0 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 0 |
| priceGrp: |
| estTotalPrice: |
| remarks_cont: |
| preparedBy: James McGoonan |
| H. SIGNATURE: H. SIGNATURE |
| H. SIGNATURE: |
| approvedBy: Franklin VanWhy |
| J. SIGNATURE: J. SIGNATURE |
| J. SIGNATURE: |
| Click to add additional data items 1 through 18 to the end of the form.: |
File details come from the government source that posted it. Updated .