CDRL Package.pdf
PDF 484 KB Posted
- Solicitation number
- FA8533-25-R-0010
About this file
This document is a Contract Data Requirements List (CDRL) for the T-38 Escape System Upgrade Program (ESUP) Centrifuge and Parachute Packing Press Repair and Maintenance Services. The contract (FD2060-25-30015) is awarded to Martin Baker for work with the Air Force Life Cycle Management Center (AFLCMC/ROU) in the Human Systems Division. The CDRL outlines five key data deliverables that the contractor must submit throughout the contract performance periods, which include a base year and four option years:
- Contractor's Progress and Status Report (monthly)
- Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report (as required)
- Repairable Item Inspection Report (after teardown/evaluation of assets)
- Accident/Incident Report (within 24 hours of any mishap)
- Quality Management System (QMS) documentation (90 calendar days after contract award)
Each deliverable has specific submission requirements, distribution statements, and is applicable to specific equipment with National Stock Numbers (NSN): Packing Press NSN 4920-99-148-4329 and Centrifuge NSN 6625-99-262-1510. The documents must follow strict marking and transmission guidelines, including potential export control and unclassified information protections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8533-25-R-0010 0003.pdf | ||
| FA8533-25-R-0010-0002 Amendment.pdf | ||
| FA8533-25-R-0010-0001 Amendment.pdf | ||
| QASP.pdf | ||
| PWS.pdf | ||
| GFP.pdf | ||
| Packaging.pdf | ||
| Transportation.pdf | ||
| FA8533-25-R-0010.pdf | ||
| WD_Laughlin AFB TX.pdf | ||
| WD_Edwards AFB CA.pdf | ||
| WD_Columbus AFB MS.pdf | ||
| WD_Vance AFB OK.pdf | ||
| WD_Sheppard AFB TX.pdf | ||
| WD_Randolph AFB TX.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(CDRL)
GENERAL INSTRUCTIONS
FOR THE
T-38 Escape System Upgrade Program (ESUP) Centrifuge and Parachute Packing Press
Repair and Maintenance Services
Purchase Request: FD2060-25-30015
23 September 2025
PREPARED BY:
AFLCMC/ROU – Human Systems Division; Operations and Support
CDRL Modification Matrix
Proposal No. / Reason
CDRL
Revision CDRL Number(s) Date Action
Contract Award
All 9 Sep 25
Table of Contents
1.0 SCOPE
2.0 GENERAL
3.0 DATA DELIVERABLES
3.1 Delivery Dates
3.2 Tailored Data Items
3.3 Data Submittal Approvals
3.4 Resubmittal of Data
3.5 Final Submittal of Data
3.6 DD Form 250 Requirements
3.7 Classified Data
3.8 Modification of Data Requirements
4.0 ELECTRONIC DATA TRANSMISSION
5.0 LETTERS OF TRANSMITTAL (LT)
6.0 COMMON ABBREVIATIONS
7.0 MARKING DOCUMENTATION
7.1 Marking Technical Documentation
7.1.1 Distribution Statement
7.1.2 Export Control Warning
7.1.3 Classified information
7.1.4 Controlled Unclassified Information (CUI)
7.2 Marking Non-Technical Documentation
7.3 Marking Examples
7.4 Intellectual Property/Marking
8.0 REFERENCE DOCUMENTS
9.0 ACRONYMS
1.0 SCOPE
The Contract Data Requirements List (CDRL) establishes the data to be delivered by the contractor, including the submittal, approval and distribution requirements. This document provides instructions and clarifications which apply to all the CDRLs within the applicable contract, unless otherwise noted. CDRLs are accomplished on DD Form 1423.
2.0 GENERAL
The Data Item Descriptions (DIDs) specified in Block 4 of the CDRLs are available electronically at the Acquisition Streamlining and Standardization Information System (ASSIST) database website: http://quicksearch.dla.mil/.
3.0 DATA DELIVERABLES
3.1 Delivery Dates
Unless otherwise specified in Block 16 of the CDRL, all references to “days” will refer to calendar days.
If a CDRL delivery date falls on a Saturday, the submittal must be delivered on the Friday prior to the Saturday delivery date.
If the CDRL delivery falls on a Sunday, the submittal must be delivered on the Monday following the Sunday delivery date.
If the CDRL delivery falls on a holiday, the submittal must be delivered on the day before the holiday.
Early CDRL delivery is permitted. The contractor must notify the Government of late CDRL deliveries.
3.2 Tailored Data Items
Tailoring instructions, when applicable, are described in Block 16 of each CDRL. If the data preparation instructions contained in Block 16 of the CDRL are different than the instructions contained in the DID, the CDRL shall govern.
3.3 Data Submittal Approvals
An "A" designator in Block 8 of the CDRL indicates the Government will formally reply to each data submittal with an approval, approval with comments, or disapproval. The Government will issue a response via a Procuring Contracting Officer (PCO) letter to the contractor within forty-five (45) calendar days, unless otherwise specified on the DD Form 1423, Block 16.
Government non-response beyond forty-five (45) calendar days does not constitute approval. If approvals are required, a CDRL submittal is not approved until a PCO letter is submitted. This does not apply to Engineering Change Proposals (ECPs) and Contract Change Proposals (CCPs).
NOTE: ECPs will utilize the DD Form 1692 (long form) unless otherwise specified in the DD Form 1423.
http://quicksearch.dla.mil/
If Block 8 contains an "N/A", or an “N”, Government approval of the content is not required;
however, compliance with data item format and content requirements, as specified in the DID, and as tailored in Block 16 of the CDRL, is mandatory. The government will not provide a formal response back to the contractor; however, the Government has the right to disapprove any data submittal(s) not in compliance with DID and contract requirements.
The contractor will formally respond to the Government within thirty (30) calendar days after receipt of any data that is disapproved, unless otherwise specified on the CDRL.
Data submittal requirements shall not be considered to have been met until the procuring agency has determined that all contractual requirements have been met regarding the identified data.
Draft submittals are not approval items. The contractor shall formally submit draft data item(s) (when required by the 1423) for review and shall mark them as “draft.” Draft submissions shall not alter the due date of first formal submission specified in the CDRL.
3.4 Resubmittal of Data
If resubmittal of a CDRL is required, it shall be resubmitted within 30 calendar days after PCO notification, unless otherwise specified. Should the contractor disagree with the resubmittal requirements, they shall submit their comments to the PCO and Configuration/Data Manager within 10 calendar days of notification. The document revision indicator shall be identified on the title page of the data item, on each page, and on a summary of document changes section contained within the document. Tracked changes or change bars shall be utilized to obtain Government approval of revised documents; however, final submittal will not contain revision markups.
3.5 Final Submittal of Data
For the final delivery of each data item in the contract/delivery order, the contractor shall clearly state in the Letter of Transmittal (LT), as defined in paragraph 5.0, that this delivery is the last submittal, and that all contractual requirements concerning that data item have been fulfilled.
3.6 DD Form 250 Requirements
Block 7 of the CDRL directs the method of submittal. Individual DD Form 250s are required only if indicated in Block 7. All other submittals shall be accompanied by a LT.
3.7 Classified Data
Classified data shall be submitted in accordance with the requirements established by the DD Form 254, Contract Security Classification Specification. The contractor shall contact the PCO for the mailing address(es) if not specified in Block 14 or 16 of the DD Form 1423.
3.8 Modification of Data Requirements
From time to time during the performance of this contract, the PCO may unilaterally change the place of delivery and the technical office for any line item of the contract exhibits within the DD Form 1423, with no change in contract price, notwithstanding the provision of the contract clause. If there is a change to the place of delivery, the Contractor and the PCO may mutually agree to an extension of the data submittal requirement date.
From time to time during the performance of this contract, the PCO may unilaterally increase or decrease the number of addresses and/or increase or decrease the number of hard copy deliverables (regular or reproducible) specified for any data item.
Unilateral actions pursuant to the preceding two paragraphs shall be by the issuance of a PCO letter followed by a Supplemental Agreement to this contract which will reference this exhibit as its authority. Any action directed by this exhibit shall be effected by the contractor beginning with the first submission of the particular data item(s) after receipt by the contractor of PCO direction.
4.0 ELECTRONIC DATA TRANSMISSION
The contractor shall submit all data deliverables in accordance with the submittal instructions indicated on each DD Form 1423. The versions of the software used for electronic data transmission shall remain compatible with current program office software. Any submittals by other means shall require program office approval prior to delivery of data. PDF documents shall be in searchable format and not scanned.
The contractor shall inform the program office if any data deliverables cannot comply with the required electronic delivery. In such cases the contractor shall recommend, for program office approval, an alternative delivery format(s).
5.0 LETTERS OF TRANSMITTAL (LT)
All data deliveries shall include a LT. The LT may be in the form of a letter or e-mail from the designated contractor representative. At a minimum, the LT shall contain:
Contractor Point of Contact (POC) Contractor address Date Contract number and program name Letter control number Document control number Document revision level Document date CDRL sequence number DID Number Data Title/Subtitle Reason or frequency of submittal (monthly, draft, final, update, etc.)
List of distribution addressees as identified in Block 14 of the CDRL
If a paper copy of the LT is prepared, a complete list of addressees shall be placed at the end of the LT, annotating the recipients (as identified on the DD Forms 1423, Block 14) including the transmittal-letter-only recipients.
If submittal is made via e-mail, the list of addressees in the “TO” line shall include the complete list of addressees and shall be considered sufficient.
6.0 COMMON ABBREVIATIONS
Block 7: SS Source (ACO) Source (ACO) SD Source (ACO) Destination (PCO) DD Destination (PCO) Destination (PCO) LT Letter of Transmittal
Block 8: A Approval N/A Approval Not Required 16 See Block 16 for further instructions
Blocks 10, 12 & 13: ANNLY Annually ASGEN As Generated
ASREQ As Required BI-MO Bi-Monthly BI-WE Bi-Weekly BLK 16 See Block 16 DAILY Daily DFDEL Deferred Delivery EOC End of Contract EOM End of Month EOQ End of Quarter MTHLY Monthly ONE/P One time preliminary draft ONE/R Once with Revisions OTIME One Time QRTLY Quarterly R/ASR Revisions as Required SEMIA Semi-Annually WEKLY Weekly XDACM X Days after Contract Modification XDADO X Days after Delivery Order XDARC X Days after Receipt of Comments XDARP X Days after Reporting Period XDATC X Days after Test Completion XDPTT X Days prior to Test XTIMES X Times
7.0 MARKING DOCUMENTATION
7.1 Marking Technical Documentation
The contractor shall mark technical information as instructed by the Government program office.
Some examples of technical information include research and engineering data, technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, catalog-item identifications, process sheets, data sets, models, studies and analyses and related information, computer software, film, technical papers, and photographs.
7.1.1 Distribution Statement
A DoD distribution marking system for technical data is prescribed in DoD Instruction (DoDI) 5230.24, “Distribution Statements on DoD Technical Information.” The intent of the system is to identify the audience approved for secondary distribution of the data in order to stem the flow of military-related technical data to our adversaries, without inhibiting technological growth or appropriate exchange of technical data that is vital to progress and innovation. These markings are in addition to any security classification or other control markings.
The contractor shall mark all technical information, regardless of its medium, with the appropriate distribution statement as prescribed by the controlling DoD office. Distribution statements are also applied to technical data that contain proprietary information. Per DAFI 61-201, paragraph 3.4.4.1, “Distribution statements are displayed conspicuously on all technical data regardless of medium or format. For standard written or printed material the markings are shown on all pages to the maximum extent practical. If the technical information is digitally prepared, or in any other medium that does not have a cover or title page, the applicable markings are affixed to all physical and digital items, such as each page, spreadsheet, product label, and container, in a conspicuous position for ready recognition.” Drawings must display the distribution statement on the first sheet at a minimum.
Technical data categorized as cryptographic/communications security, communications/ electronic intelligence, and similar categories as may be designated by the Director, National Security Agency, whose distribution is limited through alternate methods, are exempt from these marking provisions.
Certain types of technical data preclude placing the entire notice on the document. Abbreviated distribution statements must be approved by the program office and are to be used only when space precludes placing the entire statement on the document.
The distribution statement is identified in Block 9 of each CDRL. If the contractor feels that a different statement or defense category is required, the contractor must notify the PCO with the recommended statement. The Government will review the request, determine which statement is the most appropriate, and provide the contractor with either an acceptance or rejection of the requested change.
Wording for the distribution statements is shown below. The acceptable defense categories for the distribution statements must be chosen from those listed in DoDI 5230.24. The following address will be used on all documentation for the “controlling DoD office” for this program:
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; [category]; [date of determination]. Other requests for this document must be referred to [controlling DoD office].
7.1.2 Export Control Warning
Authority to withhold and control the export of certain technical data with military or space application is determined in accordance with Title 10, United States Code section 130, “Authority to withhold from public disclosure certain technical data,” and implemented by DoDD 5230.25, if such data may not be exported lawfully outside the United States without an approval, authorization, or license under the Export Control Reform Act of 2018 or the Arms Export Control Act (AECA) (both cited in the Export Control Warning). Such withholding and export control applies to Defense items listed in the United States Munitions List (USML), which is part of the International Traffic in Arms Regulations (ITAR) (22 CFR 120-130); and Export Administration Regulations (EAR) (15 CFR 730-774).
If a technical document, whether printed or electronic/digital, contains export-controlled technical data, it shall be marked with the export control warning statement prescribed in DoDI
5230.24 and shown below. When it is not feasible to use the entire statement, the abbreviated warning may be used, and a copy of the full warning added to the “Notice to Accompany the Dissemination of Export-Controlled Technical Data,” which is Enclosure 5 of DoDD 5230.25.
For assistance in determining what is export controlled, consult the controlling DoD office. The Export Control Warning may be used in conjunction with distribution statements B, C, D, E, and F. Distribution statement A, which denotes public release, cannot be used in conjunction with the export-control warning notice.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
7.1.3 Classified information
Documents containing classified information will be marked in accordance with DoDM 5200.01, Volume 2, “DoD Information Security Program: Marking of Information.”
7.1.4 Controlled Unclassified Information (CUI)
Unclassified documentation that is associated with a law, regulation, or government-wide policy, and identified as needing safeguarding, is considered CUI and must be marked according to DoDI 5200.48, Controlled Unclassified Information (CUI).
7.2 Marking Non-Technical Documentation
Non-technical documentation that is associated with a law, regulation, or government-wide policy, and identified as needing safeguarding, is considered CUI and must be marked according to DoDI 5200.48, Controlled Unclassified Information (CUI).
7.3 Marking Examples
The marking examples below are for reference. Specific information within the distribution statements and the CUI Designation Indicator will depend upon each individual case.
Marking example for non-technical CUI:
Marking example for technical CUI:
Marking example for export-controlled technical CUI:
Controlled by: USAF/AFMC Controlled by: AFLCMC/XXXX CUI Category: General Proprietary Business Information Distribution/Dissemination Control: IAW DoDI 5200.48 Limited Dissemination Controls are mandatory for non-technical CUI POC: Gov POC name and email
CUI Designation Indicator IAW DoDI 5200.48
CUI
CUI Mark Top of Page
Mark Bottom of Page
Controlled by: USAF/AFMC Controlled by AFLCMC/XXXX CUI Category: Controlled Technical Information Distribution/Dissemination Control: E POC: Gov POC name and email
CUI
Mark Bottom of Page
DISTRIBUTION STATEMENT E. Secondary Distribution authorized to DoD components only; Controlled Technical Information; 27 August 2021. Other requests for this document must be referred to AFLCMC/XXXX, Gov address.
CUI Designation Indicator IAW DoDI 5200.48
Complete DoDI 5230.24 Distribution Statement
7.4 Intellectual Property/Marking
Any markings that are added to documents for review purposes must be removed prior to formal submittal. If a document still requires a marking not addressed in the contract, the contractor must provide a justification for the marking.
9.0 REFERENCE DOCUMENTS
DAFI 61-201 Management of Scientific and Technical Information (STINFO) DFARS 227.71 Rights in Technical Data DFARS 227.72 Rights in Computer Software & Computer Software Documentation DoD 5010.12-M Procedures for the Acquisition and Management of Technical Data
DoDD 5230.09 Clearance of DoD Information for Public Release DoDD 5230.25 Withholding of Unclassified Technical Data from Public Disclosure DoDD 5400.07 DoD Freedom of Information Act (FOIA) Program DoDI 2040.02 International Transfer of Technology, Articles, and Services DoDI 5200.48 Controlled Unclassified Information (CUI)
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
Complete DoDI 5230.24 Distribution Statement
DISTRIBUTION STATEMENT E. Secondary Distribution authorized to DoD components only; Critical Technology, Export Controlled; 27 August 2021.
Other requests for this document must be referred to AFLCMC/XXXX, Gov address.
CUI Mark Bottom of Page
DoDI 5230.24 Export Control Warning
Controlled by: USAF/AFMC Controlled by AFLCMC/XXXX CUI Category: Controlled Technical Information Distribution/Dissemination Control: E POC: Gov POC name and email
CUI Designation Indicator IAW DoDI 5200.48
DoDI 5230.24 Distribution Statements on DoD Technical Information DoDM 5200.01v1 DoD Information Security Program: Overview, Classification, and
Declassification DoDM 5200.01v2 DoD Information Security Program: Marking of Information DoDM 5200.01v3 DoD Information Security Program: Protection of Classified Information
10.0 ACRONYMS
CDRL Contract Data Requirements List CUI Controlled Unclassified Information DID Data Item Description EAR Export Administration Regulations ITAR International Traffic in Arms Regulations LDC Limited Dissemination Control LT Letter of Transmittal MEARS Multi-user ECP Automated Review System PCO Procuring Contracting Officer POC Point of Contact
CONTRACT #: FD2060-25-30015
CONTRACTOR: MARTIN BAKER
SET NAME: Centrifuge/Packing Press SYSTEM ITEM: T-38 ESUP Centrifuge and Parachute Packing Press
PROGRAM: Human Systems
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
AE001 AFLCMC/ROU DI-MGMT-81928 PWS Para 4.3.5
Contractor's Progress and Status Report
AE002 AFLCMC/ROU DI- MGMT-81634C PWS Para: 4.3.4
Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report
AE003 AFLCMC/ROU DI-PSSS-80386A PWS Para: 4.3.7
Repairable Item Inspection Report
AE004 AFLCMC/ROU DI-SAFT-8 1563 PWS Para: 5.5.2
Accident/Incident Report
AE005 AFLCMC/ROU DI-MGMT-82184 PWS Para: 6.0
Quality Management System (QMS)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
BLK 16
B. EXHIBIT
BLK 16
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
T-38 ESUP Centrifuge and Parachute Packing Press
E. CONTRACT/PR NO.
FD2060-25-30015
F. CONTRACTOR
MARTIN BAKER
1. DATA ITEM NO.
AE001
2. TITLE OF DATA ITEM
Contractor's Progress and Status Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81928
5. CONTRACT REFERENCE
PWS Para 4.3.5
6. REQUIRING OFFICE
AFLCMC/ROU
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Applicable to the Packing Press NSN: 4920-99-148-4329 and Centrifuge
NSN: 6625-99-262-1510
BLK A, BLK B, BLK 1:
CLIN: Exhibit: Data Item #: Performance Period:
000X A A001 Base Year 100X B B001 Option Year 1 200X C C001 Option Year 2 300X D D001 Option Year 3 400X E E001 Option Year 4
BLK B & BLK 1:
CDRL Identification of A, B, C, D, E represent each year such as:
A Base Year B Option Year 1 C Option Year 2 D Option Year 3 E Option Year 4
BLK 12: Thirty (30) calendar days after contract award
WAWF 1
15. TOTAL 0 1 0
G. PREPARED BY
ORTON.DENISE.GALE.1404774049
Denise Orton, Configuration Manager
H. DATE
2025/09/23
I. APPROVED BY
BRYANT.JEREMY.D.1591289647
Jeremy Bryant, Logistics Manager
J. DATE
2025/09/23
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 6 Pages
17. PRICE GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
BLK 16
B. EXHIBIT
BLK 16
Packing Press
E. CONTRACT/PR NO.
FD2060-25-30015
F. CONTRACTOR
MARTIN BAKER
1. DATA ITEM NO.
AE002
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report
DI- MGMT-81634C
PWS Para: 4.3.4
6. REQUIRING OFFICE
AFLCMC/ROU
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Applicable to the Packing Press NSN: 4920-99-148-4329 and Centrifuge
NSN: 6625-99-262-1510
BLK A, BLK B, BLK 1:
CLIN: Exhibit: Data Item #: Performance Period:
000X A A002 Base Year 100X B B002 Option Year 1 200X C C002 Option Year 2 300X D D002 Option Year 3 400X E E002 Option Year 4
BLK B & BLK 1:
CDRL Identification of A, B, C, D, E represent each year such as:
A Base Year B Option Year 1 C Option Year 2 D Option Year 3 E Option Year 4
BLK 12: Twenty-five (25) business days after receipt of task order
ORTON.DENISE.GALE.1404774049
Denise Orton, Configuration Manager
H. DATE
2025/09/23
I. APPROVED BY
BRYANT.JEREMY.D.1591289647
Jeremy Bryant, Logistics Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 6 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
BLK 16
B. EXHIBIT
BLK 16
TDP TM OTHER PSSS
Packing Press
E. CONTRACT/PR NO.
FD2060-25-30015
F. CONTRACTOR
MARTIN BAKER
1. DATA ITEM NO.
AE003
2. TITLE OF DATA ITEM
Repairable Item Inspection Report
DI-PSSS-80386A
PWS Para: 4.3.7
6. REQUIRING OFFICE
AFLCMC/ROU
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Applicable to the Packing Press NSN: 4920-99-148-4329 and Centrifuge
NSN: 6625-99-262-1510
BLK A, BLK B, BLK 1:
CLIN: Exhibit: Data Item #: Performance Period:
000X A A003 Base Year 100X B B003 Option Year 1 200X C C003 Option Year 2 300X D D003 Option Year 3 400X E E003 Option Year 4
BLK B & BLK 1:
CDRL Identification of A, B, C, D, E represent each year such as:
A Base Year B Option Year 1 C Option Year 2 D Option Year 3 E Option Year 4
BLK 12: This report shall be provided to the Government no later than twenty-five (25) business days following teardown and evaluation of each asset.
ORTON.DENISE.GALE.1404774049
Denise Orton, Configuration Manager
H. DATE
2025/09/23
I. APPROVED BY
BRYANT.JEREMY.D.1591289647
Jeremy Bryant, Logistics Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 6 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
BLK 16
B. EXHIBIT
BLK 16
TDP TM OTHER SAFT
Packing Press
E. CONTRACT/PR NO.
FD2060-25-30015
F. CONTRACTOR
MARTIN BAKER
1. DATA ITEM NO.
AE004
2. TITLE OF DATA ITEM
Accident/Incident Report
DI-SAFT-8 1563
PWS Para: 5.5.2
6. REQUIRING OFFICE
AFLCMC/ROU
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Applicable to the Packing Press NSN: 4920-99-148-4329 and Centrifuge
NSN: 6625-99-262-1510
BLK A, BLK B, BLK 1:
CLIN: Exhibit: Data Item #: Performance Period:
000X A A004 Base Year 100X B B004 Option Year 1 200X C C004 Option Year 2 300X D D004 Option Year 3 400X E E004 Option Year 4
BLK B & BLK 1:
CDRL Identification of A, B, C, D, E represent each year such as:
A Base Year B Option Year 1 C Option Year 2 D Option Year 3 E Option Year 4
BLK 12: The Contractor shall submit an Accident/Incident Report within twenty-four (24) hours of the mishap
ORTON.DENISE.GALE.1404774049
Denise Orton, Configuration Manager
H. DATE
2025/09/23
I. APPROVED BY
BRYANT.JEREMY.D.1591289647
Jeremy Bryant, Logistics Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 6 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
BLK 16
B. EXHIBIT
BLK 16
Packing Press
E. CONTRACT/PR NO.
FD2060-25-30015
F. CONTRACTOR
MARTIN BAKER
1. DATA ITEM NO.
AE005
2. TITLE OF DATA ITEM
Quality Management System (QMS)
DI-MGMT-82184
PWS Para: 6.0
6. REQUIRING OFFICE
AFLCMC/ROU
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Applicable to the Packing Press NSN: 4920-99-148-4329 and Centrifuge
NSN: 6625-99-262-1510
BLK A, BLK B, BLK 1:
CLIN: Exhibit: Data Item #: Performance Period:
000X A A005 Base Year 100X B B005 Option Year 1 200X C C005 Option Year 2 300X D D005 Option Year 3 400X E E005 Option Year 4
BLK B & BLK 1:
CDRL Identification of A, B, C, D, E represent each year such as:
A Base Year B Option Year 1 C Option Year 2 D Option Year 3 E Option Year 4
BLK 12: Ninety (90) calendar days after contract award
ORTON.DENISE.GALE.1404774049
Denise Orton, Configuration Manager
H. DATE
2025/09/23
I. APPROVED BY
BRYANT.JEREMY.D.1591289647
Jeremy Bryant, Logistics Manager
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 6 Pages
| T-38 ESUP Packing Press-Centrifuge _CDRL General Instructions |
| T-38 Escape System Upgrade Program (ESUP) Centrifuge and Parachute Packing Press |
| 1.0 SCOPE |
| 2.0 GENERAL |
| 3.0 DATA DELIVERABLES |
| 3.1 Delivery Dates |
| 3.2 Tailored Data Items |
| 3.3 Data Submittal Approvals |
| 3.4 Resubmittal of Data |
| 3.5 Final Submittal of Data |
| 3.6 DD Form 250 Requirements |
| 3.7 Classified Data |
| 3.8 Modification of Data Requirements |
| 4.0 ELECTRONIC DATA TRANSMISSION |
| 5.0 LETTERS OF TRANSMITTAL (LT) |
| 6.0 COMMON ABBREVIATIONS |
| 7.0 MARKING DOCUMENTATION |
| 7.1 Marking Technical Documentation |
| 7.1.1 Distribution Statement |
| 7.1.2 Export Control Warning |
| 7.1.3 Classified information |
| 7.1.4 Controlled Unclassified Information (CUI) |
| 7.2 Marking Non-Technical Documentation |
| 7.4 Intellectual Property/Marking |
| 9.0 REFERENCE DOCUMENTS |
| 10.0 ACRONYMS |
DD1423Pkg_2025-Sep-23-1439
File details come from the government source that posted it. Updated .