About this file

This document is a Contract Data Requirements List (CDRL) that specifies the data items required for a federal contract opportunity related to the Common Munitions Built-In-Test Reprogramming Equipment System (CMBRE). The CDRL lists 24 specific data items the contractor must provide, including a Supplier's Configuration Management Plan, Status of Government Furnished Equipment, Alert/Safe-Alert Response, Quality Program Plan, Test/Inspection Reports, Acceptance Test Plan, Engineering Change Proposals, First Article Qualification Test Plan, and Training Program Structure Document. The CDRL provides details on the frequency, format, and submission requirements for each data item. This contract opportunity is a sole source requirement for Northrop Grumman Systems Corporation to provide new production, Contractor Logistics Services, repair, consumable production, parts production, sustaining engineering, program management, and cyber security support for the CMBRE system. The contract will include a base 12-month period with four 12-month option periods.

View the file

Other files for this federal contract opportunity

Other files attached to Common Munitions Built-In-Test Reprogramming Equipment System (CMBRE) - Contractor Logistics Support (CLS) and Production, newest first.
File Type Posted
FA8533-25-R-0001 A0003.pdf PDF
FA8533-25-R-0001 0002.pdf PDF
PWS Final CMBRE PLUS 26-30003.pdf PDF
FA8533-25-R-0001 0001.pdf PDF
Transportation_FD20602630003_DD1653.pdf PDF
Packaging_FD20602630003_FORM158.pdf PDF
IUID_PartNumber_CMBRE.pdf PDF
GFP_CMBRE_Plus.pdf PDF
DD254_RFP_signed.pdf PDF
CDRL_Exhibits_BEHLP_combined.pdf PDF
PWS_CMBRE_PLUS_17Oct2024.pdf PDF
WageDetermination_HoustonCnty_2015-4495_Rev25.pdf PDF
IUID_NSN_CMBRE.pdf PDF
CDRL_Exhibits_CFJMQ_combined.pdf PDF
FA8533-25-R-0001.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006/5006 A/D/G/K/N

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Coporation

ADGKN002 Supplier's Configuration Management Plan (CMP)

DI-SESS-80858D PWS Para. 4.9.4, 4.11.11

ONE/P

Digital

Digital (See Block 16) 1

0 1 0

Blk 10 - 13: Contractor shall submit a CMP 60 days after contract award, and a revision as changes occur.

Blk 14a: Shall be delivered electronically in Adobe PDF format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N002 supports CLINs X002 and X043-X068.

CLIN Exhibit Data Item No. Period of Performance 0006 A D002 Base Year Period 1006 D D002 Option Period I 2006 G G002 Option Period II 3006 K K002 Option Period III 4006 N N002 Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:36:33 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.01 10:56:37 -04'00'

Adobe Professional 8.0

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

A/D/G/K/N

AN/GYQ-79(V) CMBRE

0006/1006/2006/3006/4006/5006

FD2060-26-30003 Northrop Grumman System Coporation

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 003 Status of Government Furnished Equipment (GFE)

DI-MGMT-80269T PWS Para. 3.2, 3.5, 4.8.2 AFLCMC/WNA

LT

N/ D

QRTLY

O

90DAC

90DARP

MEARS 1

Digital (See Block 16)

0 1 0

Blk 10, 11, 12 13: The first submission shall be delivered 90 days after contract award. The next submission shall be 90 days after initial submission. Subsequent submissions shall occur every 90 days.

Blk 14a: Shall be delivered electronically in via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N003 supports CLINs X001, X013.

CLIN Exhibit Data Item No. Period of Performance 0006 A A003 Base Year Period 1006 D D003 Option Period I 2006 G G003 Option Period II 3006 K K003 Option Period III 4006 N N003 Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:45:50 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.01 10:57:03 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006/5006 A/D/G/K/N

AN/GYQ-79(V) CMBRE FD2060-20-30007 Northrop Grumman System Corporation

ADGKN 004

PWS Para. 4.16

LT

A

ASREQ

ASREQ

ASREQ

ASREQ

MEARS

Digital (See Block 16) 1

0 1 0

Block 10-13: The contractor shall prepare a response to an Alert/Safe-Alert to provide the Government with the information of the applicability, impact, and corrective action or disposition of the Alerted parts, assemblies, and units containing alerted parts.

Blk 14a: Shall be delivered electronically in via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N004 supports CLIN X001.

CLIN Exhibit Data Item No. Period of Performance 0006 A A004 Base Year Period 1006 D D004 Option Period I 2006 G G004 Option Period II 3006 K K004 Option Period III 4006 N N004 Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:37:18 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.01 10:57:30 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

A/D/G/K/N

AN/GYQ-79(V) CMBRE

0006/1006/2006/3006/4006/5006

FD2060-20-30007 Northrop Grumman System Corporation

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN005

PWS Para. 4.7.2, 5.9

ONE/P

MEARS

Digital (See Block 16)

0 1 0

Blk 10 - 13: Contractor shall submit a QPP 30 days after contract award, and a revision as changes occur.

Blk 14a: Shall be delivered electronically in Adobe PDF format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N supports CLIN X001.

CLIN Exhibit Data Item No. Period of Performance 0006 A A005 Base Year Period 1006 D D005 Option Period I 2006 G G005 Option Period II 3006 K K005 Option Period III 4006 N N005 Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:38:57 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.01 10:58:02 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

A/D/G/K/N

AN/GYQ-79(V) CMBRE

0006/1006/2006/3006/4006

FD2060-26-30003 Northrop Grumman System Corporation

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 006 Test/Inspection Report

PWS Para. 4.11.2

ASREQ

ASREQ

ASREQ

MEARS

Digital (See Block 16)

0 1 0

Blocks 10 - 13: The contractor shall submit final test reports NLT five (5) business days after each test event. The Government has ten (10) business days to review the report and/or approve or provide comment. The contractor has ten (10) business days after receipt of Government comments to deliver an updated/corrected test report.

Blk 14a: Shall be delivered electronically in Adobe PDF and Microsoft Office format via the following: https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N006 supports CLIN X009.

CLIN Exhibit Data Item No. Period of Performance 0006 A A006 Base Year Period 1006 D D006 Option Period I 2006 G G006 Option Period II 3006 K K006 Option Period III 4006 N N006 Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:46:30 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.02 07:25:55 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

A/D/G/K/N

AN/GYQ-79(V) CMBRE

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKNE007

PWS Para. 4.16

LT ASREQ

ASREQ

ASREQ

ASREQ

MEARS 1

Digital (See Block 16)

0 1 0

Block 10-13: The contractor shall prepare a response to an Alert/Safe-Alert to provide the Government with the information of the applicability, impact, and corrective action or disposition of the Alerted parts, assemblies, and units containing alerted parts.

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N007 supports CLIN X001.

CLIN Exhibit Data Item No. Period of Performance 0006 A A007 Base Year Period 1006 D D007 Option Period I 2006 G G007 Option Period II 3006 K K007 Option Period III 4006 N N007 Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:47:10 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.02 07:26:45 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

A/D/G/K/N

AN/GYQ-79(V) CMBRE

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 008 Maintenance Service Report

DI-MGMT-80995A/T See Blk 16 AFLCMC/WNA

DD

A D

WEKLY

O

07DAC

BLK 16

MEARS 1

Digital (See Block 16)

0 1 0

Blk 4: The DID is tailored so that the format of the report will include all of the following data fields, in the order listed:

1. Delivery Order Number

2. CLIN

3. Date Asset was Received

4. Asset Description

5. Part Number

6. Serial Number

7. Agency Owner (Air Force, Navy/Marines, FMS)

8. Failure Description

9. Asset Status (CND, BER, Repairable)

10. Initial Contractual Delivery Date

11. Revised Contractual Delivery Date

12. Shipped Date

13. Shipment Destination

14. Tracking Number

The DID is tailored as such that the following paragraphs are not applicable: para 3.1e, h, j, k; para 3.2; para 3.5; para 3.6; para 3.6.1; para 3.7.

Blk 5: PWS Para. 4.6, 4.7.1, 4.7.5, 4.7.6

Blk 13: All subsequent submissions shall be required by the final work day of every calendar week, showing all applicable changes in the repair cycle for each asset.

Blk 14a: Shall be delivered electronically in Microsoft Office format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N008 supports CLINs X001 and X014-X042.

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:48:02 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.02 07:27:24 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) FD2060-26-30003 Northrop Grumman System Corporation

CLIN Exhibit Data Item No. Period of Performance 0010 A A008 Base Year Period 1010 D D008 Option Period I 2010 G G008 Option Period II 3010 K K008 Option Period III 4010 N N008 Option Period IV

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 009 Scientific and Technical Reports Obsolescence and DMS Report

DI-MISC-80711A See block 16 AFLCMC/WNA

LT

N/A D

SEMIA

O

90DAC

15DARP

MEARS 1

Digital (See block 16)

0 1 0

Blk 5: PWS Para. 4.11.1, 4.11.2, 4.11.3, 4.11.6, Blk 14a: Shall be delivered electronically in Microsoft Office format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/B/C/D/E009 supports CLIN X002.

CLIN Exhibit Data Item No. Period of Performance 0006 A A009 Base Year Period 1006 D D009 Option Period I 2006 G G009 Option Period II 3006 K K009 Option Period III 4006 N N009 Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:50:35 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.02 07:28:12 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00A Automated Computer Program Identification Number (ACPIN) Data and Control Record

DI-MISC-81454D PWS Para. 4.11.2, 4.11.5, 4.11.12 AFLCMC/WNA

LT

A D

ASREQ

ASREQ

15DAQ

ASREQ

MEARS 1

Digital (See Block 16)

0 1 0

Blk 10, 11, 12, 13: The contractor shall provide required documentation 15 business days after qualifying event. The Government shall review and provide approval or comments within 15 business days after receipt of documentation. The contractor shall have 10 business days to incorporate any Government comments and resubmit the documentation.

Blk 14a: Shall be delivered electronically in Microsoft Office format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00A supports CLINs X002 and X009.

CLIN Exhibit Data Item No. Period of Performance 0006 A A00A Base Year Period 1006 D D00A Option Period I 2006 G G00A Option Period II 3006 K K00A Option Period III 4006 N N00A Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.01 10:51:20 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:13:51 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00B Computer Software Product End Items

DI-AVCS-80700A PWS Para. 4.11.2, 4.11.5, 4.11.12 AFLCMC/WNA

LT

A D

ASREQ

ASREQ

15DAQ

ASREQ

MEARS

Digital (see Block 16) 1

0 1 0

Blk 10, 11, 12, 13: The contractor shall provide required documentation 15 business days after qualifying event. The Government shall review and provide approval or comments within 15 business days after receipt of documentation. The contractor shall have 10 business days to incorporate any Government comments and resubmit the documentation.

Blk 14a: Shall be delivered electronically in Microsoft Office format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00B supports CLINs X002 and X009.

CLIN Exhibit Data Item No. Period of Performance 0006 A A00B Base Year Period 1006 D D00B Option Period I 2006 G G00B Option Period II 3006 K K00B Option Period III 4006 N N00B Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.02 13:22:47 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:14:59 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00C Technical Report - Study/Services

DI-MISC-80508B See Block 16 AFLCMC/WNA

LT

A D

ASREQ

ASREQ

15DAQ

ASREQ

MEARS 1

Digital (See Block 16)

0 1 0

Block 5: PWS Para. 4.10.1, 4.11.2, 4.11.6, 4.11.11, 4.11.13, 4.13.5 Blk 10, 11, 12, 13: The contractor shall provide required documentation 15 business days after qualifying event. The Government shall review and provide approval or comments within 15 business days after receipt of documentation. The contractor shall have 10 business days to incorporate any Government comments and resubmit the documentation.

Blk 14a: Shall be delivered electronically in Microsoft Office format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00C supports CLINs X001,X002,X009, and X011.

CLIN Exhibit Data Item No. Period of Performance 0006 A A00C Base Year Period 1006 D D00C Option Period I 2006 G G00C Option Period II 3006 K K00C Option Period III 4006 N N00C Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.02 13:24:15 -04'00'

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:15:33 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00D Acceptance Test Plan

DI-QCIC-80553A PWS Para 4.112 AFLCMC/WNA

DD

A D

ASREQ

ASREQ

15DAQ

ASREQ

MEARS 1

Digital (See Block 16)

0 1 0

Blk 10, 11, 12, 13: The contractor shall provide required test plan 30 calendar days before expected event. The Government shall review and provide approval or comments within 15 business days after receipt of test plan. The contractor shall have 5 business days to incorporate any Government comments and resubmit the test plan.

Blk 14a: Shall be delivered electronically in Adobe PDF format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00D supports CLIN X009.

CLIN Exhibit Data Item No. Period of Performance 0006 A A00D Base Year Period 1006 D D00D Option Period I 2006 G G00D Option Period II 3006 K K00D Option Period III 4006 N N00D Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.02 13:25:47 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:16:27 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00E Data Accession List (DAL)

DI-MGMT-81453C PWS Para 4.11.2, 4.11.3, 4.12.6.1 AFLCMC/WNA

LT

A D

ANNLY

O

60DAC

90DACM/DADO

MEARS 1

Digital (See Block 16)

0 1 0

Blk 10, 11, 12, 13: The government shall have 10 business days to provide comments or approve the DAL. the contractor shall incorporate Government comments and resubmit the DAL 10 business days after receipt of comments.

Blk 14a: Shall be delivered electronically in Adobe PDF format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00E supports CLINs X001, X002 and CLINX009.

CLIN Exhibit Data Item No. Period of Performance 0006 A A00E Base Year Period 1006 D D00E Option Period I 2006 G G00E Option Period II 3006 K K00E Option Period III 4006 N N00E Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.02 13:26:57 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:16:58 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00F Engineering Change Proposal (ECP)

DI-SESS-80639E PWS Para 4.11.2, 4.11.3, 4.11.11 AFLCMC/WNA

DD

A D

ASREQ

O

ASREQ

ASREQ

MEARS 1

Digitalreference in para

0 1 0

Blk 4:The format shall be IAW Air Force ECP Form 1692.

ECP's shall also include change page/drawing updates/red lines, as well as future delivery schedule, to the respective documentation affected by the changes. Contractor shall submit all proposed Class I ECP's with appropriate supporting documentation.

ECP's shall also include a schedule outlining all the tasks required to complete the ECP effort and estimated start and end dates of each task.

Blk 7: Approval/Disapproval of Class I ECPs will be via procuring activity CCB.

Blk 10, 11, 12, 13: The date of delivery of the ECP documentation shall be mutually agreed upon between the Government and the contractor upon approval of the RFD for the respective effort. The Government shall review and provide approval or comments within 30 calendar days after receipt of ECP documentation. The contractor shall have 15 calendar days to incorporate any Government comments and resubmit the documentation.

Blk 14a: Shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00F supports CLINs X002 and X009.

CLIN Exhibit Data Item No. Period of Performance 0006 A A00F Base Year Period 1006 D D00F Option Period I 2006 G G00F Option Period II 3006 K K00F Option Period III 4006 N N00F Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.04 14:30:15 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:17:39 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00G Product Engineering Design Data and Associated Lists

DI-SESS-81000F/T Blk 16 AFLCMC/WNA

DD

A D

ASREQ

ASREQ

ASREQ

ASREQ

MEARS 1

Digital (See Block 16)

0 1 0

EDATS 2019-121

Blk 5:PWS sections 4.2.4, 4.11.2, 4.11.3, 4.11.7, 4.11.8, 4.11.11

All data submittals shall contain a delivery letter and a shipping list. The letter shall contain at a minimum the contract number, delivery order, CLIN, and EDATS number (located on the bottom right corner of the DD Form 1423). The shipping list shall include as a minimum, the document number, revision level, and number of sheets/pages. The data delivered shall be in the same sequence as the shipping list. Shipments of data must be for a complete Technical Data Package (TDP) that accurately depicts the final product as defined in the tasking document (SOW, PWS, etc.). Shipping list shall specify whether the shipment is updates, final or make-up.

Blk 14a: Shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00G supports CLINs X002, X006 and X009.

CLIN Exhibit Data Item No. Period of Performance 0006 A A00G Base Year Period 1006 D D00G Option Period I 2006 G G00G Option Period II 3006 K K00G Option Period III 4006 N N00G Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.04 14:29:18 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:18:05 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0006/1006/2006/3006/4006 A/D/G/K/N X

AN/GYQ-79(V) CMBRE FD2060-26-30003 Northrop Grumman System Corporation

ADGKN 00H Conference Agenda

DI-ADMN-81249C Blk 16 AFLCMC/WNA

LT

A D

ASREQ

ASREQ

ASREQ

ASREQ

MEARS 1

Digital (See Block 16)

0 1 0

Blk 5: PWS Para. 4.12.2, 4.12.3, 4.12.4, 4.12.5

Blk 10, 11, 12, 13: The agenda shall be delivered a minimum of ten (10) working days prior to any conference, meeting, or review listed in the aforementioned PWS paragraphs.

The Government shall have five (5) working days to review the agenda and provide comments. The contractor shall incorporate Government comments and deliver updated agenda within five (5) working days.

Blk 14a: Shall be delivered electronically in Microsoft Office format via the following:

https://mears1.redstone.army.mil/mears/default.aspx

CDRL A/D/G/K/N00Hsupports CLINs X001, X002, and X006

CLIN Exhibit Data Item No. Period of Performance 0006 A A00H Base Year Period 1006 D D00H Option Period I 2006 G G00H Option Period II 3006 K K00H Option Period III 4006 N N00H Option Period IV

CUMMINGS.HOLLY.DAWN.106

1660921

Digitally signed by

CUMMINGS.HOLLY.DAWN.1061660921

Date: 2024.10.02 13:47:00 -04'00'

25 Sept 24

HILL.JUSTIN.C.1548322320

Digitally signed by

HILL.JUSTIN.C.1548322320

Date: 2024.10.28 12:18:34 -04'00'

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .