CDRL_A005 DI-ILSS-80386-T-HVAC Teardown Test and Evaluation Report.pdf
PDF 181 KB Posted
- Attached to
- Kohler Generator, HVAC, Wheel Set Repair
- Solicitation number
- FA855625R0001
About this file
This document is a Contract Data Requirements List (CDRL) for a Repairable Item Inspection Report, specifically focused on a Teardown, Test and Evaluation Report for HVAC equipment. The CDRL (Data Item A005) is associated with the DDF HVAC P/N: 94B-58-1-19 and is intended for the Air Force Lifecycle Management Center at the Robins Air Force Base in Georgia. The document requires the contractor to submit an electronically formatted PDF or Microsoft Word report upon receipt of equipment, which must include a comprehensive list of all replaceable/repairable parts and their associated labor hours required to repair or replace parts to restore the asset to a fully serviceable condition. The report must also include an estimate for preventative maintenance actions, referencing the Air Rover Operation and Maintenance Manual.
The CDRL specifies distribution to AFLCMC/EBUK at 425 Eastman Street, Robins AFB GA 31098, with two copies to be submitted - one draft and one final. The document was prepared by Adrienne N. Williams on 25 Nov 24 and approved by Cindy M. Hall on 09 Dec 24. The submission is part of the PWS Part 4.4.7 requirements, with the distribution authorized only as directed by the controlling office, and all requests will be referred to EBUK.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| 1_DATA_ITEM_NO: A005 |
| 2_TITLE_OF_DATA_ITEM: Repairable Item Inspection Report |
| 3_SUBTITLE: Teardown, Test and Evaluation Report |
| 4_AUTHORITY_Data_Acquisit: DI-ILSS-80386/T |
| 5_CONTRACT_REFERENCE: PWS Para 4.4.7 |
| 6_REQUIRING_OFFICE: AFLCMC/EBUM |
| 7_DID_250_REQ: N/A |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: F |
| 10_FREQUENCY: BLK 16 |
| 11_AS_OF_DATE: BLK 16 |
| 12_DATE_OF_FIRST_SUBMISSI: BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: BLK 16 |
| addressee1: AFLCMC/EBUK |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: 425 Eastman Street |
| draft2: |
| reg2: |
| repro2: |
| addressee3: Robins AFB GA |
| draft3: |
| reg3: |
| repro3: |
| addressee4: 31098 |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: AFLCMC/EBUM |
| draft6: |
| reg6: 1 |
| repro6: |
| addressee7: 425 Eastman Street |
| draft7: |
| reg7: |
| repro7: |
| addressee8: Robins AFB GA |
| draft8: |
| reg8: |
| repro8: |
| addressee9: 31098 |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: Block 9: Distribution authorized only as directed by controlling office. All |
requests shall be referred to EBUK.
Block 10-13: Upon receipt of the equipment, the Contractor shall list all deficiencies/recommended repairs for each inducted HVAC. The information associated with this deliverable shall be submitted to the Government upon receipt of each generator requiring repair.
DI-ILSS-80386/T is tailored as follows:
-To provide submission of report electronically as PDF or Microsoft Word document.
-The Content of the report shall include the following data elements from DID Para 10.1.1: B, D, E, G, H and I -Data Element H tailored: List of all replaceable/repairable parts/services along with associated labor hours required to repair/replace part or perform service. List all parts/service/repairs needed to bring asset back to a fully serviceable condition.
--Repairable Item Inspection Report will include an estimate for the following maintenance actions:
Perform Preventative Maintenance (PM) per Air Rover Maintenance Schedule (Air Rover Operation and Maintenance Manual for Part Number: ULCR60CA10KW will be furnished by the Government).
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: Adrienne N. Williams |
| H_DATE: 25 Nov 24 |
| 1_APPROVED_BY: |
| J_DATE: 09 Dec 24 |
| Page: |
| reg38t: 2 |
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: A |
| TDP: X |
| TM: |
| OTHER: |
| DSYSTEMITEM: DDF HVAC P/N: 94B-58-1-19 |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| 16_REMARKS_Continued: |
| Page2: |
| of_pages: |
| Reset: |
File details come from the government source that posted it. Updated .