CDRL A002 Contract Depot Maintenance (CDM) Production Report.pdf

PDF 7 KB Posted

Attached to
Maintenance and Overhaul of the CH-47 Pump, Hydraulic
Solicitation number
W58RGZ-21-B-0004
Issued by

View the file

Other files

File Type Posted
Attachment 0013 CH-47 CHINOOK PUMP HYDRAULIC PRICING Template 24 Feb 22.xlsx XLSX spreadsheet
W58RGZ-21-B-0004 - 0003.pdf PDF
W58RGZ21B0004-0002.pdf PDF
W58RGZ-21-B-0004 - 0001.pdf PDF
Attachment 0011 AMC AUP for TAVC.pdf PDF
Attachment 0002 - DOCUMENT SUMMARY LIST.pdf PDF
W58RGZ-21-B-0004.pdf PDF
Attachment 0005 -ROD Instructions_.pdf PDF
Attachment 0004- MO Frozen Plan Description and Guidance_.pdf PDF
CDRL A004 Report of Shipping (Item) and Packaging Discrepancy.pdf PDF
CDRL A005 Government Property Inventory Report.pdf PDF
Attachment 0007 M and O AED REQUIREMENTS DATA.pdf PDF
Attachment 0009 CONTRACTOR REPAIR TAV_C REQUIREMENTS.pdf PDF
Attachment 0010 AMC LMP TAV-C PORTAL USER ACCESS PROCEDURES.pdf PDF
Attachment 0006 - ROD Template (Fillable SF 364).pdf PDF
Attachment 0003 - 1348-1A Sample.pdf PDF
Attachment 0001 - M and O PACKAGING REQUIREMENTS.pdf PDF
Attachment 0012- Portal Access Addendum.pdf PDF
Attachment 0013 CH-47 CHINOOK PUMP HYDRAULIC PRICING Template.xlsx XLSX spreadsheet
CDRL A001 Technical Report - StudyServices.pdf PDF
CDRL A003 Quality Deficiency Report.pdf PDF
Attachment 0014 Transportation Reqiurements.pdf PDF
Attachment 0008 - Adequate Proposal Checklist.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

02/21/2020Page 1 of 2

4320-01-5617214

PUMP, HYDRAULIC

D. SYSTEM / ITEM

A002

1. DATA ITEM NO.

VINSON, SHAWN (TAYLOR)

G. PREPARED BY

01/30/2020

H. DATE

VINSON, SHAWN (TAYLOR)

I. APPROVED BY

01/30/2020

J. DATE

WOOD, MARY SHANNA

LOG #

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE: 02/03/2020

4. AUTHORITY (DATA ACQUISITION DOC NO) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

SEE BLK 16

NSN:

PRID: PART NUMBER:M810-03 3032171-001 STATUS: R

AMSRD-AMR-SE-TD

Contract Depot Maintenance (CDM) Production Report

DI-PSSS-81995 SOW, PARA N AMSAM-MMM-LM

SD

N/A

A MTHLY

SEE BLK 16

NLT 10 DAEOM

0 1 0

0 1 0

16. REMARKS:

BLOCK 12: The first report is due 5 working days after receipt of reparable item(s).

BLOCK 14: The contractor shall provide data in Microsoft EXCEL Spreadsheet format to:

usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

Each monthly submission shall include balance of each NSN on hand at the contractor's facility associated with this contract. The balance sahll be verify by the contractor prior to submission

POC: PHONE:

02/21/2020Page 2 of 2

File details come from the government source that posted it. Updated .