Attachment 0012- Portal Access Addendum.pdf

PDF 204 KB Posted

Attached to
Maintenance and Overhaul of the CH-47 Pump, Hydraulic
Solicitation number
W58RGZ-21-B-0004
Issued by

View the file

Other files

File Type Posted
Attachment 0013 CH-47 CHINOOK PUMP HYDRAULIC PRICING Template 24 Feb 22.xlsx XLSX spreadsheet
W58RGZ-21-B-0004 - 0003.pdf PDF
W58RGZ21B0004-0002.pdf PDF
W58RGZ-21-B-0004 - 0001.pdf PDF
Attachment 0011 AMC AUP for TAVC.pdf PDF
Attachment 0002 - DOCUMENT SUMMARY LIST.pdf PDF
W58RGZ-21-B-0004.pdf PDF
Attachment 0005 -ROD Instructions_.pdf PDF
Attachment 0004- MO Frozen Plan Description and Guidance_.pdf PDF
CDRL A004 Report of Shipping (Item) and Packaging Discrepancy.pdf PDF
CDRL A005 Government Property Inventory Report.pdf PDF
Attachment 0007 M and O AED REQUIREMENTS DATA.pdf PDF
Attachment 0009 CONTRACTOR REPAIR TAV_C REQUIREMENTS.pdf PDF
Attachment 0010 AMC LMP TAV-C PORTAL USER ACCESS PROCEDURES.pdf PDF
Attachment 0006 - ROD Template (Fillable SF 364).pdf PDF
Attachment 0003 - 1348-1A Sample.pdf PDF
Attachment 0001 - M and O PACKAGING REQUIREMENTS.pdf PDF
Attachment 0013 CH-47 CHINOOK PUMP HYDRAULIC PRICING Template.xlsx XLSX spreadsheet
CDRL A001 Technical Report - StudyServices.pdf PDF
CDRL A003 Quality Deficiency Report.pdf PDF
Attachment 0014 Transportation Reqiurements.pdf PDF
CDRL A002 Contract Depot Maintenance (CDM) Production Report.pdf PDF
Attachment 0008 - Adequate Proposal Checklist.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM TO APPENDIX A, THE LMP TAV-C PORTAL END USER ACCESS

PROCEDURES AND AMC OPORD, FRAGO 2, 19-220

To avoid excessive contract modification costs, it was decided in the development of Total Asset Visibility-Contractor (TAV-C) capability in LMP to require all new relevant contracts or new orders to it to be used rather than modify existing contracts. In a step to make participation in Army support more attractive, the decision was made to use the DoD approved External Certification Authority (ECA) certification in lieu of a full security clearance for TAV-C portal users.

TAV-C completed development and post go-live support period on 23 June 2020 with no contracts being processed. The first contracts are now beginning to be finalized and a problem as been found.

Problem.

Procedures developed for contractors’ access requests mirrored those for Army employees. As currently written, the applications require IA training, a signed Acceptable Use Policy (AUP) statement, and the ECA certificate to be provided with a DD Form 2875 System Authorization Access Request (SAAR). It has been determined the use of the SAAR form is not applicable since the ECA certificate process does not require a security clearance so there is no entry in JPAS for a security manager to validate.

Upon further review, G-2/6 determined the ECA certificate was sufficient for portal users, but the use of the SAAR is inappropriate for requests from ECA certified individuals. In order to have an auditable user access process to LMP, it will be necessary to still have a standard account access process across AMC.

Remediation.

Contractor Responsibility. The application packet shall consist of the 1) user’s ECA form, 2) Memorandum for Record on company letterhead paper signed by the contractor Security Manager or an individual with Company Equity Ownership attesting that all documentation needed to complete the ECA Digital Certificate Forms Packet was witnessed at the time of Notarization. 3) completion of cyber security training as evidenced by copy of training certificate. 4) signed AUP. An electronic copy of all the documents listed in this section shall be provided to the appropriate Government Point of Contact before LMP access can be granted.

The applicant can take the cyber security training at (https://public.cyber.mil/training/.

A blank AUP will be provided and can be manually signed and scanned..

LCMC Responsibility. Appoint a government POC for LMP access and oversight. To ensure validity over time, the requiring activity will evaluate the efficacy of the contractor’s TAV-C portal access control procedures for effectiveness, accuracy and the upkeep of their TAV-C access files. Maintain records of certificates accepted and their expiration date and establish procedures to ensure certificates are maintained as current and valid by the contractor.

AMC DCS G3, Supply Requirements Division is publishing this memorandum as an addendum to the LMP TAV-C Portal User Access Procedures and FRAGO 2, AMC OPORD 19-229 to provide interim guidance until revisions to the user’s guide and other related documents to the established solution can be accomplished per recommendations by the G-2/6 within the LCMC and ACC activities processing these contracts. This addendum can be used to enable the https://public.cyber.mil/training/ completion of pending contracts before year-end and will remain in effect until next release of the portal user access guide. Please insert a copy of this addendum in to the user’s guide.

10/15/2020

X Daniel C. Parker, PhD

DR. DANIEL C. PARKER

Chief, AMC G3 Supply Requirements Division

Signed by: PARKER.DANIEL.C.1171814622

File details come from the government source that posted it. Updated .