Attachment 0007 M and O AED REQUIREMENTS DATA.pdf

PDF 8 KB Posted

Attached to
Maintenance and Overhaul of the CH-47 Pump, Hydraulic
Solicitation number
W58RGZ-21-B-0004
Issued by

View the file

Other files

File Type Posted
Attachment 0013 CH-47 CHINOOK PUMP HYDRAULIC PRICING Template 24 Feb 22.xlsx XLSX spreadsheet
W58RGZ-21-B-0004 - 0003.pdf PDF
W58RGZ21B0004-0002.pdf PDF
W58RGZ-21-B-0004 - 0001.pdf PDF
Attachment 0011 AMC AUP for TAVC.pdf PDF
Attachment 0002 - DOCUMENT SUMMARY LIST.pdf PDF
W58RGZ-21-B-0004.pdf PDF
Attachment 0005 -ROD Instructions_.pdf PDF
Attachment 0004- MO Frozen Plan Description and Guidance_.pdf PDF
CDRL A004 Report of Shipping (Item) and Packaging Discrepancy.pdf PDF
CDRL A005 Government Property Inventory Report.pdf PDF
Attachment 0009 CONTRACTOR REPAIR TAV_C REQUIREMENTS.pdf PDF
Attachment 0010 AMC LMP TAV-C PORTAL USER ACCESS PROCEDURES.pdf PDF
Attachment 0006 - ROD Template (Fillable SF 364).pdf PDF
Attachment 0003 - 1348-1A Sample.pdf PDF
Attachment 0001 - M and O PACKAGING REQUIREMENTS.pdf PDF
Attachment 0012- Portal Access Addendum.pdf PDF
Attachment 0013 CH-47 CHINOOK PUMP HYDRAULIC PRICING Template.xlsx XLSX spreadsheet
CDRL A001 Technical Report - StudyServices.pdf PDF
CDRL A003 Quality Deficiency Report.pdf PDF
Attachment 0014 Transportation Reqiurements.pdf PDF
CDRL A002 Contract Depot Maintenance (CDM) Production Report.pdf PDF
Attachment 0008 - Adequate Proposal Checklist.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02/21/2020

M810-03PRID 3032171-001Part Number

4320-01-561-7214NSN CH-47FSystem

PUMP, HYDRAULICNomenclature

YAdequate DMWR Available?

DMWR-1-4320-421&PDMWR ID

04/30/2019DMWR Date

DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

See DMWR 1-4320-421&P WPs 0010 through 0021 for Overhaul Inspection Procedures.

The overhaul facility is responsible for acquisitions, mainteance, calibration, and disposition of all Test, Measurement and Diagnostic Equipment (TMDE). TMDE shall be maintained and controlled in accordance with MIL-I-45607, ISO10012, NCSL Z540.3, or AMCOM-R 702-7. Calibration documents for all TMDE shall be traceable to the National Institute of Standards and Technology (NIST).

See DMWR 1-4320-421&P WP 0022 for test procedures.

See DMWR 1-4320-421&P WP 0023 and 0024 for preparation for storage and shipment requirements.

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47F Hydraulic Pump at the time of this review.

Special Airworthiness Considerations

AED Notes: FCDD-AMA-M-Sustainment has verified the CSI/NST status through the ARISE CIM database on 18 Dec. 2019 and the part is Non-CSI and Non-NST.JC

Other Requirements / Comments

If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

NSpecial Post-Contract Award Requirements?

Special Post-Contract Award Requirements

DMWR 1-4320-421&P does not contain detailed IUID requirements for this component. The PM has not tasked AED to update this DMWR to incorporate IUID detailed procedures. Recommend contacting CH-47 PM IUID Office, Jennifer Bishop at (256) 876-8526 for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of the Hydraulic Pump.

Other Requirements / Comments (Part II)

Interactive Authoring and Display System (IADS) Version 4.0 is required to view the latest version of DMWR 1-4320-421&P.

IADS can be procured through the Aviation and Missle Command (AMCOM) Publications office. IADS is cost free.

Other Requirements / Comments (Part III)

SRD-AMA-M-A/W-Sustainment has re-verified the CSI/NST status through the ARISE CIM on 3 Feb 2020 and the NHA is Non- CSI and Non-NST. No changes made. DEM

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

YTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

02/21/2020

M810-03PRID 3032171-001Part Number

4320-01-561-7214NSN CH-47FSystem

See DMWR 1-4320-421&P Work Package (WP) 0008 for Inspection Requirements.

See DMWR 1-4320-421&P WP 0033 Table 1 for tools and test equipment.

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus

Correlation Performance Study Requirements

File details come from the government source that posted it. Updated .