Attachment 0007 M and O AED REQUIREMENTS DATA.pdf
PDF 8 KB Posted
- Solicitation number
- W58RGZ-21-B-0004
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02/21/2020
M810-03PRID 3032171-001Part Number
4320-01-561-7214NSN CH-47FSystem
PUMP, HYDRAULICNomenclature
YAdequate DMWR Available?
DMWR-1-4320-421&PDMWR ID
04/30/2019DMWR Date
DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
See DMWR 1-4320-421&P WPs 0010 through 0021 for Overhaul Inspection Procedures.
The overhaul facility is responsible for acquisitions, mainteance, calibration, and disposition of all Test, Measurement and Diagnostic Equipment (TMDE). TMDE shall be maintained and controlled in accordance with MIL-I-45607, ISO10012, NCSL Z540.3, or AMCOM-R 702-7. Calibration documents for all TMDE shall be traceable to the National Institute of Standards and Technology (NIST).
See DMWR 1-4320-421&P WP 0022 for test procedures.
See DMWR 1-4320-421&P WP 0023 and 0024 for preparation for storage and shipment requirements.
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47F Hydraulic Pump at the time of this review.
Special Airworthiness Considerations
AED Notes: FCDD-AMA-M-Sustainment has verified the CSI/NST status through the ARISE CIM database on 18 Dec. 2019 and the part is Non-CSI and Non-NST.JC
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
DMWR 1-4320-421&P does not contain detailed IUID requirements for this component. The PM has not tasked AED to update this DMWR to incorporate IUID detailed procedures. Recommend contacting CH-47 PM IUID Office, Jennifer Bishop at (256) 876-8526 for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of the Hydraulic Pump.
Other Requirements / Comments (Part II)
Interactive Authoring and Display System (IADS) Version 4.0 is required to view the latest version of DMWR 1-4320-421&P.
IADS can be procured through the Aviation and Missle Command (AMCOM) Publications office. IADS is cost free.
Other Requirements / Comments (Part III)
SRD-AMA-M-A/W-Sustainment has re-verified the CSI/NST status through the ARISE CIM on 3 Feb 2020 and the NHA is Non- CSI and Non-NST. No changes made. DEM
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
02/21/2020
M810-03PRID 3032171-001Part Number
4320-01-561-7214NSN CH-47FSystem
See DMWR 1-4320-421&P Work Package (WP) 0008 for Inspection Requirements.
See DMWR 1-4320-421&P WP 0033 Table 1 for tools and test equipment.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
Correlation Performance Study Requirements
File details come from the government source that posted it. Updated .