CDRL A001_Test Procedure.pdf

PDF 213 KB Posted

Attached to
Cable Assembly Guidance and Control (G&C) to Afterbody (A/C), 203W3
Solicitation number
N6572624R0002
Issued by

About this file

This solicitation requests offers for the supply of Cable Assembly Guidance and Control (G&C) to Afterbody (A/C), 203W3. The Naval Sea Logistics Center, Mechanicsburg is seeking a firm fixed price contract for an initial base quantity of 59 units with four optional quantities of 55, 50, 50, and 50 units respectively. Offerors must propose unit pricing for the base and optional quantities. Delivery is required FOB Destination to NUWC Keyport, WA and the period of performance includes potential option years extending to four years total. To be eligible, offers must meet the requirements of the statement of work, technical drawings, and achieve a rating of acceptable for non-price factors and low price. The NAICS assigned is 334419 and eligibility is unrestricted. The DPAS rating is DO-C9 and portions may support foreign military sales.

View the file

Other files

File Type Posted
CUI_N6572624R0002-0002.pdf PDF
CUI_N6572624R0002-0001.pdf PDF
Past Performance Reference Information.docx DOCX document
CUI_N6572624R0002.pdf PDF
CDRL A003_Notification of Test Trial.pdf PDF
CDRL A002_Test Inspection Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TBD A TDP TM _____ OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK48 CABLE ASSEMBLY, 203W3, FES TBD N/A

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 TEST PROCEDURE QUALITY, TEST AND INSPECTION PLAN III

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80603A STATEMENT OF WORK NUWC DIVISION, KEYPORT

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED OTIME SEE BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

D (SEE BLK 16)

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

NA SEE BLK 16 SEE BLK 16 Reg Repro

16. REMARKS TECHNICAL POC 0 1

BLK 5: THE PLAN SHALL SPECIFY PROCESS CONTROL METHODS AND INSPECTION

PROCEDURES REQUIRED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,

SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE PLAN WILL INCLUDE MANUFACTURING

INSPECTION AND TEST PROCEDURES IAW DRAWING 5855970, THE STATEMENT OF WORK (SOW)

PARA 3.1.1., AND AS REQUIRED FOR CDRL A002.

THE PLAN SHALL IDENTIFY DATA RECORDS AND FORMS USED TO SUPPORT MANUFACTURING,

INSPECTIONS, PACKAGING, AND SECURITY PROCESSES, REQUIRED BY THE SOW AND CDRL

A002 TO SUPPORT DESTINATION ACCEPTANCE BY THE GOVERNMENT.

THE PLAN SHALL IDENTIFY A METHOD OF FAILURE ANALYSIS ASSESSMENT AND CORRECTIVE

ACTION AND DETAILED REPORT, IN THE CONTRACTOR'S STANDARD FORMAT, IAW SOW PARA

3.1.5.

REQUEST FOR CHANGES TO THE PLAN DUE TO TESTS RESULTING IN NON-CONFORMANCE OR

DEFECTS SHALL BE APPROVED BY NUWCDIVKPT BEFORE DELIVERY OF UNITS TO ENSURE NO

CONTRACT REQUIREMENT IS IMPACTED, IAW SOW PARA 3.1.6. AND 3.3.5.

BLK 8: THE QUALITY, TEST AND INSPECTION PLAN IS REQUIRED 21 DAYS AFTER CONTRACT

AWARD.

BLK 9: DISTRIBUTION STATEMENT "D" - DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD

CONTRACTORS ONLY; CRITICAL TECHNOLOGY, EXPORT CONTROLLED (JULY 2021). OTHER

REQUESTS SHALL BE REFERRED TO PEO-SUBS (PMS404).

WARNING" THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751 ET. SEQ.) OR THE EXPORT

ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C. APP. 2401 ET. SEQ. VIOLATORS OF

THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE PER THE

PROVISIONS OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE - FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD

THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.

BLK 10: NUWCDIVKPT WILL HAVE 30 DAYS TO ACCEPT/REJECT THE PLAN.

BLK 12 & 13: SUBMISSION WILL BE NO LATER THAN 21 DAYS AFTER CONTRACT AWARD, IN THE

OFFEROR'S FORMAT.

BLK 14: CONTROLLED UNCLASSIFIED INFORMATION (CUI) CAN BE PROVIDED ELECTRONICALLY

FOR DESTINATION ACCEPTANCE. ALL EMAIL MUST BE DIGITALLY SIGNED AND ENCRYPTED TO

NAVY.MIL ADDRESS ONLY.

DELIVERABLE FORMAT: DOCUMENT: ADOBE PDF (.PDF, SEARCHABLE) OR MICROSOFT WORD

(.DOC) OR SPREADSHEET MICROSOFT EXCEL (.XLS)

DISTRIBUTION ADDRESSEES AND ELECTRONIC MAILING ADDRESSES: NUWC DIVISION KEYPORT,

JACQUELINE GLASS (JACQUELINE.M.GLASS.CIV@US.NAVY.MIL) AND MICHAEL VAN DEMARK

(MICHAEL.T.VANDEMARK.CIV@US.NAVY.MIL)

CONTRACTING OFFICER 0 1

15. TOTAL ▬▬▬▬► 0 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

JACQUELINE GLASS

4 AUGUST 2021

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

2023-10-19T17:36:49-0700
MCFARLAND.TRACEY.E.1255884634

File details come from the government source that posted it. Updated .