CDRL A001-A004.pdf

PDF 214 KB Posted

Attached to
Fine Art Conservation IDIQ
Solicitation number
W912CH-24-R-L001
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that specifies the data deliverables required under a Federal contract for Fine Art Conservation Services. The key details are:

The contract is a Firm Fixed Price (FFP), Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for procuring professional fine art conservation services to support the U.S. Army Center of Military History (CMH) and Army Museum Enterprise (AME) System. It has a 3-year ordering period with a guaranteed minimum to be obligated in the first Task Order. The required data deliverables include a Final Treatment Report, Milestone Dates, a Communication Plan, and Liability Insurance Coverage reporting. Submission dates, distribution, and other requirements are specified for each deliverable. This contract will be a Total Small Business Set-Aside, and the solicitation process includes provisions related to supply chain risk and past performance requirements.

View the file

Other files

File Type Posted
Solicitation Questions and Answers.docx DOCX document
Attachment 002-Pricing Workbook.xlsx XLSX spreadsheet
CDRLs A005-A008.pdf PDF
Attachment 001-Past Performance Questionnaire.docx DOCX document
W912CH-24-R-L001 - Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423, AUG 96

CONTRACT DATA REQUIREMENTS LIST

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK), AUG 96

addr1_1: COR
draft1_1:
reg1_1: 1
repro1_1: 1
addr1_2:
draft1_2:
reg1_2:
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
draft2_1:
addr2_1: COR
addr2_2:
reg2_1: 1
repro2_1:
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr3_1: COR
addr3_2:
addr3_3:
draft3_1:
reg3_1: 1
repro3_1:
draft3_2:
reg3_2:
repro3_2:
draft3_3:
reg3_3:
repro3_3:
addr4_1: COR
draft4_1:
reg4_1: 1
repro4_1:
addr4_2:
draft4_2:
reg4_2:
repro4_2:
addr4_3:
draft4_3:
reg4_3:
repro4_3:
draft2_2:
repro2_2:
reg2_2:
line_item: 9001
exhibit: A
xtdp: Off
xtm: Off
othercat: X
system: Fine Art Conservation Services
ctr_no: TBD
contr: TBD
data_item1: A001
title1: Reports and Final Treatment Report
sub1:
auth1: DI-MGMT-81928 NOT 2 (T)
ref1: PWS 1.4.2; 5.2.2; 5.3.16
req_ofc1: AME-MD
dd250_1: LT
appcode1:
dist1: A
freq1: ASREQ
asof1: SeeBlock 16
firstsub1: SeeBlock 16
subsub1: SeeBlock 16
group1:
totalprice1:
rmks1: (T) The final report shall include photographic documentation IAW professional standards.

Block 11, 12 &13: Not later than 12-months after receipt of work(s) of fine art for assessment/treatment and concurrent with completion of conservation project.

totaldraft1: 0
totalreq1: 1
totalrepro1: 1
data_item2: A002
title2: Milestone Dates
sub2:
auth2: DI-MGMT-81791 NOT 2
ref2: PWS 1.4.5; 1.5; 5.1.7
req_ofc2: AME-MD
dd250_2: LT
appcode2:
dist2: A
freq2: Once
asof2: 6Months ADC
firstsub2: 6Months ADC
subsub2: N/A
rmks2: Block 5 &12 contractor shall prepare and present to the COR proposed project schedules complete with milestone dates. Contractor shall during the course of the project track the project to see that the project remains on schedule. PWS 1.4.5; 1.5; 5.1.7
group2:
totalprice2:
totaldraft2: 0
totalreg2: 1
totalrepro2: 0
data_item3: A003
title3: Communication Plan
sub3:
auth3: DI-MGMT-81928 NOT 2
ref3: PWS 1.4.3; 5.1.6
req_ofc3: AME-MD
dd250_3: LT
appcode3: A
dist3: A
freq3: Monthly
asof3: SeeBlock 16
firstsub3: 30 Days ADC
subsub3: SeeBlock 16
rmks3: Block 11&13 A phone call to the COR with a follow up E-mail summary each month is required by the contractor.
group3:
totalprice3:
totaldraft3: 0
totalreg3: 1
totalrepro3: 0
data_item4: A004
title4: Liability Insurance Coverage
sub4: Reporting Third Party Liability
auth4: DI-MGMT-81550 NOT 1 (T)
ref4: PWS 1.8.8; 5.3.17
req_ofc4: AME-MD
dd250_4: LT
appcode4:
dist4: A
freq4: Once
asof4: at award
firstsub4: At award
subsub4: if changes
rmks4: The contractor shall provide and maintain a comprehensive liability insurance coverage for each work of fine art, which is in the contractor's possession. Submit via email to the COR.
group4:
totalprice4:
totaldraft4: 0
totalreg4: 1
totalrepro4: 0
prep_by:
prep_date:
app_by:
app_date:
Page: 1
pages: 2
app: Adobe Professional 8.0
Reset:

File details come from the government source that posted it. Updated .