This is a Contract Data Requirements List (CDRL) for an Automatic Aqueous Parts Washer contract managed by RRAD, Contracting. The document specifies a single data item requirement (Data Item 0002) for a Lockout/Tagout (LOTO) procedure that the contractor must furnish one time only prior to work start.

The contractor is required to provide a graphical, machine-specific LOTO procedure that clearly describes the steps necessary to establish a zero-energy state for the equipment in accordance with OSHA Regulation CFR 1910.147. The procedure must be printed on durable laminated material suitable for posting on the equipment, with all LOTO locations clearly identified using durable labels keyed to the procedure. Additionally, the contractor must furnish the procedure in electronic format to enable easy transfer into a maintenance management system. The Point of Contact (POC), Brandon Pope from the Production Engineering Division, will review the LOTO procedure and materials within seven working days and inform contracting of any necessary changes. The distribution is for administrative and operational use only, with electronic delivery (Repro) to RRAD, Contracting and PED, POC. The document was prepared by Brandon Pope and approved by Andy Graves, Chief Facilitization Team, both dated 19 NOV 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Automatic Aqueous Parts Washer

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

0002 Lockout/Tagout (LOTO)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

PD 3.2 RRAD, Contracting

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD REQUIRED ASRE Q SEE BLOCK 16, ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE

B

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A SEE BLOCK 16 SEE BLOCK 16 Reg Repro

16. REMARKS RRAD, Contracting 1

Per block 5. The Contractor shall furnish a graphical, machine-specific LOTO procedure that clearly and specifically describes the steps necessary to establish a zero-energy state for the equipment in accordance with the requirements of OSHA Regulation CFR 1910.147. The procedure shall be printed on a durable laminated material suitable for posting on the equipment.

All LOTO locations on the equipment shall be clearly identified with a durable label keyed to the LOTO procedure. Contractor shall furnish the procedure in an electronic format so the information can be easily transferred into a maintenance management system. Reference PD 3.2

Per block 8. POC will review LOTO procedure and materials IAW with PD and will inform contracting on necessary changes to be made if any within seven (7) working days.

Per block 9. For administrative and operational use only. (See DoDI 5230.24)

Per block 10. Lockout/Tagout procedure will be required one time only prior to work start.

Per block 11. Lockout/Tagout procedure will be required one time only prior to work start.

Per block 12. . Project Time Chart will be required one time only prior to work start.

Distribution addresses:

POC – Brandon Pope, Production Engineering Division , RRAD, Contracting

Repro = electronic delivery

PED, POC 1 1

15. TOTAL ▬▬▬▬► 1 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE