About this file
This document is a comprehensive Project Manual for an Access Control System project for the Southwestern Regional Transit Authority (SORTA) in Cincinnati, Ohio. The project involves replacing the existing AMAG Symmetry access control system with a new Genetec Security Center (Version 5.12) system across multiple transit locations, including Queensgate, Bond Hill, Access, Glenway Crossing Transit Center, Northside Transit Center, Riverfront Transit Center, and Huntington Center. The project is detailed in Volume 2 of 2, with an issue date of September 25, 2024, and is prepared by Dynotec, with Bright Technologies serving as the Security Electronics Engineer.
The access control system upgrade will involve comprehensive equipment replacement, including intelligent controllers, door controllers, card readers, request-to-exit devices, door sensors, badging hardware, and 1,500 credential cards. The system will be integrated with the existing unified security platform, utilizing HID Signo Readers, Mercury Security controllers, and Genetec Synergis Cloud Link appliances. The project requires a Genetec Certified Security System Integrator to handle database migration, equipment installation, and system configuration, with specific requirements for hardware specifications, environmental conditions, network connectivity, and comprehensive training for SORTA's security, IT, and maintenance personnel. The integrator will be responsible for preparing as-built drawings, operations and maintenance manuals, and providing warranty certificates in the owner's name.
View the file
Other files for this state and local contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Queensgate: 1401 Bank Street, Cincinnati, OH 45214
Bond Hill: 4700 Paddock Road, Cincinnati, OH 45229
Access: 1801 Transpark Drive, Cincinnati, OH 45229
Glenway Crossing Transit Center: 5090 Glencrossing Way, Cincinnati, OH 45238
Northside Transit Center: 4120 Kirby Avenue, Cincinnati, OH 45223
Riverfront Transit Center: 204 Broadway, Cincinnati, OH 45202
Huntington Center: 525 Vine Street, Cincinnati, OH 45202
68-2022-C
ACCESS CONTROL SYSTEM
Multiple Locations
Cincinnati, OH 45202
Prepared for:
SORTA
Southwestern Regional Transit Authority
525 Vine Street, Suite 500
Cincinnati, Ohio 45202
Prepared by:
Issue Date: 25-SEP-24
Issued for: Construction Documents
Volume 2 of 2
PROJECT MANUAL
Dynotec Project No. 230023
Access Control System Multiple Locations
Cincinnati, OH
Prepared for:
SOUTHWEST OHIO REGIONAL TRANSIT AUTHORITY
525 VINE STREET, SUITE 500
CINCINNATI, OH 45202
Prepared By:
Architect:
2931 E. Dublin-Granville Road, Suite 200
Columbus, OH 43231
Phone: 614.880.7320
Website: www.dynotecinc.com
Security Electronics Engineer:
BRIGHT TECHNOLOGIES, INC.
25086 Legion Road
Sunman, IN 4701-8654
Phone: 812.623.0044
Estimates of Probable Construction Cost:
33479 Lake Road
Avon Lake, OH 44012
Phone: 440.541.6642
ACCESS CONTROL SYSTEM – 68-2022-C #240053.000
TABLE OF CONTENTS 00 01 10 - 1
SECTION 000110 – TABLE OF CONTENTS
00 01 10 Table of Contents ................................................................................................................... 1-3
Volume 1 of 2
Division 00 – Procurement and Contracting Requirements
Division 01 – General Requirements
TABLE OF CONTENTS 00 01 10 - 2
Volume 2 of 2
Division 02 – Existing Conditions
02 31 19 Selective Demolition .............................................................................................................. 1-5
Division 03 – Concrete (Not Used)
Division 04 – Masonry (Not Used)
Division 05 – Metals (Not Used)
Division 06 – Wood and Plastic (Not Used)
Division 07 – Thermal and Moisture Protection (Not Used)
Division 08 – Openings (Not Used)
Division 09 – Finishes (Not Used)
Division 10 – Specialties (Not Used)
Division 11 – Equipment (Not Used)
Division 12 – Furnishings (Not Used)
Division 13 – Special Construction (Not Used)
Division 14 - Conveying Systems (Not Used)
Division 21 – Fire Suppression (Not Used)
Division 22 – Plumbing (Not Used)
Division 23 – Heating Ventilating and Air Conditioning (Not Used)
Division 25 –Integrated Automation (Not Used)
Division 26 – Electrical (Not Used)
Division 27 – Communications (Not Used)
Division 28 – Electronic Safety and Security
28 05 13 Conductors & Cables for Electronic Safety & Security ......................................................... 1-7
28 05 26 Grounding & Bonding for Electronic Safety & Security ....................................................... 1-3
28 05 28 Pathways for Electronic Safety & Security ........................................................................... 1-6
28 13 00 Access Control ..................................................................................................................... 1-19
Division 31 – Earthwork (Not Used)
Division 32 – Exterior Improvements (Not Used)
TABLE OF CONTENTS 00 01 10 - 3
Division 33 – Utilities (Not Used)
END OF SECTION 00 01 10
SELECTIVE DEMOLITION 02 41 19 - 1
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to
Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.4 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review areas where existing construction is to remain and requires protection.
SELECTIVE DEMOLITION 02 41 19 - 2
1.5 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control, and for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's and other tenants on-site operations are uninterrupted.
2. Use of elevator and stairs.
3. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
C. Inventory: Submit a list of items to be removed and salvaged and deliver to Owner prior to start of demolition.
D. Predemolition Photographs or Video: Submit before Work begins.
E. Warranties: Documentation indicated that existing warranties are still in effect after completion of selective demolition.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the
Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
SELECTIVE DEMOLITION 02 41 19 - 3
1. Maintain fire-protection facilities in service during selective demolition operations.
PART 2 - PRODUCTS
2.1 PEFORMANCE REQUIREMENTS
A. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Review record documents of existing construction provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in record documents.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to Architect.
D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs.
1. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued as damage caused by salvage operations.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
SELECTIVE DEMOLITION 02 41 19 - 4
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Dispose of demolished items and materials promptly.
B. Removed and Salvaged Items:
1. Clean salvaged items.
2. Store items in a secure area until delivery to Owner.
3. Transport items to Owner's storage area designated by Owner.
4. Protect items from damage during transport and storage.
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition.
3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
SELECTIVE DEMOLITION 02 41 19 - 5
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.
3.6 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 41 19
GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY 280526 - 1
SECTION 28 05 26 - GROUNDING & BONDING FOR ELECTRONIC SAFETY & SECURITY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Grounding conductors.
2. Grounding connectors.
3. Grounding busbars.
1.2 DEFINITIONS
A. Signal Ground: The ground reference point designated by manufacturer of the system that is considered to have zero voltage.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
PART 2 - PRODUCTS
2.1 CONDUCTORS
A. Insulated Conductors: Stranded copper wire, green or green with yellow stripe insulation, insulated for 600 V, and complying with UL 83.
1. Ground wire for custom-length equipment ground jumpers shall be No. 6 AWG, 19-strand, UL-listed, Type THHN wire.
B. Bare Copper Conductors:
1. Solid Conductors: ASTM B 3.
2. Stranded Conductors: ASTM B 8.
3. Tinned Conductors: ASTM B 33.
4. Bonding Cable: 28 kcmils (14.2 sq. mm), 14 strands of No. 17 AWG conductor, and 1/4 inch (6.3 mm) in diameter.
5. Bonding Conductor: No. 4 or No. 6 AWG, stranded conductor.
6. Bonding Jumper: Tinned-copper tape, braided conductors terminated with two-hole copper ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick.
GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY 280526 - 2
2.2 CONNECTORS
A. Irreversible connectors listed for the purpose. Listed by an NRTL as complying with NFPA 70 for specific types, sizes, and combinations of conductors and other items connected. Comply with UL 486A-486B.
B. Compression Wire Connectors: Crimp-and-compress connectors that bond to the conductor when the connector is compressed around the conductor. Comply with UL 467.
1. Electroplated tinned copper, C and H shaped.
C. Busbar Connectors: Cast silicon bronze, solderless compression or exothermic-type mechanical connector; with a long barrel and two holes spaced on 5/8- or 1-inch (15.8- or 25.4-mm) centers for a two-bolt connection to the busbar.
D. Welded Connectors: Exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions.
2.3 GROUNDING BUSBARS
1. Comply with SECTION 270526 - Grounding and Bonding for Communications Systems.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with IEEE 1100, "Recommended Practice for Power and Grounding Electronic
Equipment."
1. Ground cable shields, drain conductors, and equipment to eliminate shock hazard and to minimize ground loops, common-mode returns, noise pickup, cross talk, and other impairments.
2. Bond shields and drain conductors to ground at only one point in each circuit.
B. Signal Ground:
1. For each system, establish the signal ground and label that location as such.
2. Bond the signal ground to the alternating-current (ac) power system service by connecting to one of the following listed locations, using insulated No. 6 AWG, stranded, Type THHN wire:
a. Telecommunications grounding busbar.
C. Comply with NECA 1.
GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY 280526 - 3
3.2 APPLICATION
A. Conductors: Install solid conductor for No. 8 AWG and smaller and stranded conductors for
No. 6 AWG and larger unless otherwise indicated.
B. Grounding and Bonding Conductors:
1. Install in the straightest and shortest route between the origination and termination point, and no longer than required. The bend radius shall not be smaller than eight times the diameter of the conductor. No one bend may exceed 90 degrees.
2. Install without splices.
3. Support at not more than 36-inch (900-mm) intervals.
3.3 CONNECTIONS
A. Stacking of conductors under a single bolt is not permitted when connecting to busbars.
B. Assemble the wire connector to the conductor, complying with manufacturer's written instructions and as follows:
1. Use crimping tool and the die specific to the connector.
2. Pretwist the conductor.
3. Apply an antioxidant compound to all bolted and compression connections.
C. Shielded Cable: Bond the shield of shielded cable to the signal ground. Comply with TIA/EIA-
568-C.1 and TIA/EIA-568-C.2 when grounding screened, balanced, twisted-pair cables.
D. Rack- and Cabinet-Mounted Equipment: Bond powered equipment chassis to the cabinet or rack grounding bar. Power connection shall comply with NFPA 70; the equipment grounding conductor in the power cord of cord- and plug-connected equipment shall be considered as a supplement to bonding requirements in this Section.
3.4 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
1. Inspect physical and mechanical condition. Verify tightness of accessible, bolted, electrical connections with a calibrated torque wrench according to manufacturer's written instructions.
C. Grounding system will be considered defective if it does not pass tests and inspections.
D. Prepare test and inspection reports.
END OF SECTION 28 05 26
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 280513 - 1
SECTION 28 05 13 - CONDUCTORS & CABLES FOR ELECTRONIC SAFETY & SECURITY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. UTP cabling.
2. Control-voltage cabling.
3. Control-circuit conductors.
4. Identification products.
1.2 DEFINITIONS
A. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50 V or for remote-control and signaling power-limited circuits.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings:
1. Cabling administration drawings and printouts.
2. Wiring diagrams to show typical wiring schematics, including the following:
a. Cross-connects.
b. Patch panels.
c. Patch cords.
1.4 INFORMATIONAL SUBMITTALS
A. Source quality-control reports.
B. Field quality-control reports.
1.5 QUALITY ASSURANCE
A. Testing Agency Qualifications: An NRTL.
1. Testing Field Supervisor: Currently certified by BICSI as an RCDD to supervise on-site testing.
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 280513 - 2
PART 2 - PRODUCTS
2.1 UTP CABLE
A. Description: 100-ohm, four-pair UTP, covered with a thermoplastic jacket.
1. Comply with ICEA S-90-661 for mechanical properties.
2. Comply with TIA-568-C.1 for performance specifications.
3. Comply with TIA-568-C.2, Category 6.
4. Listed and labeled by an NRTL acceptable to authorities having jurisdiction as complying with UL 444 and NFPA 70 for the following types:
a. Communications, General Purpose: Type CM.
b. Communications, Plenum Rated: Type CMP, complying with NFPA 262.
2.2 UTP CABLE HARDWARE
A. UTP Cable Connecting Hardware: IDC type, using modules designed for punch-down caps or tools. Cables shall be terminated with connecting hardware of the same category or higher.
2.3 CONTROL-VOLTAGE CABLE
A. Paired Cable: NFPA 70, Type CMG.
1. One pair, twisted, No. 16 AWG, stranded (19x29) and No. 18 AWG, stranded (19x30) tinned copper conductors.
2. PVC insulation.
3. Unshielded.
4. PVC jacket.
5. Flame Resistance: Comply with UL 1581.
B. Plenum-Rated, Paired Cable: NFPA 70, Type CMP.
1. One pair, twisted, No. 16 AWG, stranded (19x29) and No. 18 AWG, stranded (19x30)] tinned copper conductors.
2. PVC insulation.
3. Unshielded.
4. PVC jacket.
5. Flame Resistance: Comply with NFPA 262.
2.4 CONTROL-CIRCUIT CONDUCTORS
A. Class 1 Control Circuits: Stranded copper, Type THHN-THWN, complying with UL 83, in pathway.
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 280513 - 3
B. Class 2 Control Circuits: Stranded copper, Type THHN-THWN, complying with UL 83, in pathway.
C. Class 3 Remote-Control and Signal Circuits: Stranded copper, Type TW or TF in pathway, complying with UL 83.
2.5 IDENTIFICATION PRODUCTS
A. Comply with TIA-606-B and UL 969 for a system of labeling materials, including label stocks, laminating adhesives, and inks used by label printers.
B. Comply with requirements in Section 260553 "Identification for Electrical Systems."
2.6 SOURCE QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to evaluate cables.
B. Factory test UTP and optical-fiber cables on reels according to TIA-568-C.1.
C. Factory test UTP cables according to TIA-568-C.2.
D. Cable will be considered defective if it does not pass tests and inspections.
E. Prepare test and inspection reports.
PART 3 - EXECUTION
3.1 INSTALLATION OF HANGERS AND SUPPORTS
A. Comply with requirements in Section 260529 "Hangers and Supports for Electrical Systems" for installation of supports for cables.
3.2 WIRING METHOD
A. Install wiring in metal pathways and wireways.
1. Comply with requirements in Section 280528 "Pathways for Electronic Safety and
Security."
B. Install cable, concealed in accessible ceilings, walls, and floors when possible.
C. Wiring on Racks and within Enclosures:
1. Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. Cable ties shall not be excessively tightened such that the transmission characteristics of the cable are altered.
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 280513 - 4
2. Install lacing bars and distribution spools.
3. Separate power-limited and non-power-limited conductors as recommended in writing by manufacturer.
4. Install conductors parallel with or at right angles to sides and back of enclosure.
5. Connect conductors associated with intrusion system that are terminated, spliced, or interrupted in any enclosure onto terminal blocks.
6. Mark each terminal according to system's wiring diagrams.
7. Make all connections with approved crimp-on terminal spade lugs, pressure-type terminal blocks, or plug connectors.
3.3 INSTALLATION OF CONDUCTORS AND CABLES
A. Comply with NECA 1 and NFPA 70.
B. Conductors: Size according to system manufacturer's written instructions unless otherwise indicated.
C. Do not install conductors and cables that are wet, moisture damaged, or mold damaged.
D. Install UTP cables and connecting materials after spaces are complete and dry, and HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during the remainder of the construction period.
E. General Requirements for Cabling:
1. Comply with TIA-568-C.1.
2. Terminate all conductors; no cable shall contain unterminated elements. Make terminations only at indicated outlets, terminals, and cross-connect and patch panels.
Leave a minimum of 6 inches (150 mm) of slack at outlet terminations and coil loosely into box after termination on outlet fitting.
3. Cables may not be spliced.
4. Secure and support cables at intervals not exceeding 30 inches (760 mm) and not more than 6 inches (150 mm) from cabinets, boxes, fittings, outlets, racks, frames, and terminals.
5. Maintain minimum cable bending radius during installation and termination of cables.
6. Do not install bruised, kinked, scored, deformed, or abraded cable. Do not splice cable between termination, tap, or junction points. Remove and discard cable if damaged during installation and replace it with new cable.
7. Cold-Weather Installation: Bring cable to room temperature before dereeling. Heat lamps shall not be used for heating.
8. Riser Cable: Riser cable support intervals shall be in accordance with manufacturer's recommendations.
9. Comply with Section 280544 "Sleeves and Sleeve Seals for Electronic Safety and
Security Pathways and Cabling."
F. UTP Cable Installation: Install using techniques, practices, and methods that are consistent with
Category 6 rating of components and that ensure Category 6 performance of completed and linked signal paths, end to end.
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 280513 - 5
1. Comply with TIA-568-C.2.
2. Install 110-style IDC termination hardware unless otherwise indicated.
3. Do not untwist UTP cables more than 1/2 inch (12 mm) from point of termination to maintain cable geometry.
G. Separation from EMI Sources:
1. Comply with BICSI TDMM and TIA-569-C recommendations for separating unshielded copper voice and data communication cable from potential EMI sources, including electrical power lines and equipment.
2. Separation between open communication cables or cables in nonmetallic pathways and unshielded power conductors and electrical equipment shall be as follows:
a. Electrical Equipment Rating Less Than 2 kVA: A minimum of 5 inches (127 mm).
b. Electrical Equipment Rating between 2 and 5 kVA: A minimum of 12 inches (300 mm).
c. Electrical Equipment Rating More Than 5 kVA: A minimum of 24 inches (600 mm).
3. Separation between communication cables in grounded metallic pathways and unshielded power lines or electrical equipment shall be as follows:
a. Electrical Equipment Rating Less Than 2 kVA: A minimum of 2-1/2 inches (64 mm).
b. Electrical Equipment Rating between 2 and 5 kVA: A minimum of 6 inches (150 mm).
c. Electrical Equipment Rating More Than 5 kVA: A minimum of 12 inches (300 mm).
4. Separation between cables in grounded metallic pathways and power lines and electrical equipment located in grounded metallic conduits or enclosures shall be as follows:
a. Electrical Equipment Rating Less Than 2 kVA: No requirement.
b. Electrical Equipment Rating between 2 and 5 kVA: A minimum of 3 inches (75 mm).
c. Electrical Equipment Rating More Than 5 kVA: A minimum of 6 inches (150 mm).
5. Separation between Cables and Electrical Motors and Transformers, 5 kVA or hp and
Larger: A minimum of 48 inches (1200 mm).
6. Separation between Cables and Fluorescent Fixtures: A minimum of 5 inches (127 mm).
3.4 POWER AND CONTROL-CIRCUIT CONDUCTORS
A. 120-V Power Wiring: Install according to Section 260519 "Low-Voltage Electrical Power
Conductors and Cables" unless otherwise indicated.
B. Minimum Conductor Sizes:
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 280513 - 6
1. Class 1 remote-control and signal circuits, No. 14 AWG.
2. Class 2 low-energy, remote-control and signal circuits, No. 16 AWG.
3. Class 3 low-energy, remote-control, alarm and signal circuits, No. 12 AWG.
3.5 CONNECTIONS
A. Comply with requirements in Section 281300 "Access Control" for connecting, terminating, and identifying wires and cables.
B. Comply with requirements in Section 282300 "Video Surveillance" for connecting, terminating, and identifying wires and cables.
3.6 FIRESTOPPING
A. Comply with requirements in Section 078413 "Penetration Firestopping."
B. Comply with TIA-569-C, "Firestopping" Annex A.
3.7 GROUNDING
A. For communication wiring, comply with J-STD-607-A.
B. For low-voltage wiring and cabling, comply with requirements in Section 280526 "Grounding and Bonding for Electronic Safety and Security."
3.8 IDENTIFICATION
A. Identify system components, wiring, and cabling complying with TIA-606-B.
B. Comply with requirements for identification specified in Section 260553 "Identification for
Electrical Systems."
3.9 FIELD QUALITY CONTROL
A. Perform the following tests and inspections:
1. Visually inspect UTP cable jacket materials for NRTL certification markings. Inspect cabling terminations to confirm color coding for pin assignments, and inspect cabling connections to confirm compliance with TIA-568-C.1.
2. Visually inspect cable placement, cable termination, grounding and bonding, equipment and patch cords, and labeling of all components.
3. Test UTP cabling for DC loop resistance, shorts, opens, intermittent faults, and polarity between conductors. Test operation of shorting bars in connection blocks. Test cables after termination but not cross connection.
CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY 280513 - 7
a. Test instruments shall comply with or exceed applicable requirements in TIA-568-
C.2. Perform tests with a tester that complies with performance requirements in
"Test Instruments (Normative)" Annex, complying with measurement accuracy specified in "Measurement Accuracy (Informative)" Annex. Use only test cords and adapters that are qualified by test equipment manufacturer for channel or link test configuration.
B. Document data for each measurement. Print data for submittals in a detailed report with summary cover sheet(s). See Section 014000 "Quality Requirements" for retesting and reinspecting requirements and Section 017300 "Execution" for requirements for correcting the
Work.
C. End-to-end cabling will be considered defective if it does not pass tests and inspections.
D. Prepare and submit test and inspection reports.
END OF SECTION 28 05 13
PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY 280528 - 1
SECTION 28 05 28 - PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Metal conduits, tubing, and fittings.
2. Nonmetallic conduits, tubing, and fittings.
3. Boxes, enclosures, and cabinets.
B. Related Requirements:
1. Section 280513 " Conductors and Cables for Electronic Safety And Security".
2. Section 280528 “Pathways for Electronic Safety and Security" for conduits, surface pathways, innerduct, boxes, and faceplate adapters serving communications systems.
1.2 ACTION SUBMITTALS
A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.
B. Shop Drawings: For custom enclosures and cabinets.
PART 2 - PRODUCTS
2.1 METAL CONDUITS, TUBING, AND FITTINGS
A. General Requirements for Metal Conduits and Fittings:
1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
2. Comply with TIA-569.
B. GRC: Comply with ANSI C80.1 and UL 6.
C. EMT: Comply with ANSI C80.3 and UL 797.
D. Fittings for Metal Conduit: Comply with NEMA FB 1 and UL 514B.
1. Conduit Fittings for Hazardous (Classified) Locations: Comply with UL 886 and
NFPA 70.
2. Fittings for EMT:
PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY 280528 - 2
a. Material: Steel or die cast.
b. Type: Setscrew.
3. Expansion Fittings: PVC or steel to match conduit type, complying with UL-467, rated for environmental conditions where installed, and including flexible external bonding jumper.
E. Joint Compound for GRC: Approved, as defined in NFPA 70, by authorities having jurisdiction for use in conduit assemblies, and compounded for use to lubricate and protect threaded conduit joints from corrosion and to enhance their conductivity.
2.2 NONMETALLIC CONDUITS, TUBING, AND FITTINGS
A. General Requirements for Nonmetallic Conduits and Fittings:
1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
2. Comply with TIA-569.
B. RNC: Type EPC-40-PVC, complying with NEMA TC 2 and UL 651 unless otherwise indicated.
C. Fittings for ENT and RNC: Comply with NEMA TC 3; match to conduit or tubing type and material.
D. Solvents and Adhesives: As recommended by conduit manufacturer.
2.3 BOXES, ENCLOSURES, AND CABINETS
1. Boxes, enclosures and cabinets installed in wet locations shall be listed for use in wet locations.
B. Sheet-Metal Outlet and Device Boxes: Comply with NEMA OS 1 and UL 514A.
C. Cast-Metal Outlet and Device Boxes: Comply with NEMA FB 1, Type FD, with gasketed cover.
D. Box extensions used to accommodate new building finishes shall be of same material as recessed box.
E. Metal Floor Boxes:
1. Material: Cast or sheet metal.
2. Type: Adjustable.
3. Listing and Labeling: Metal floor boxes shall be listed and labeled as defined in
NFPA 70, by a qualified testing agency, and marked for intended location and application.
PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY 280528 - 3
F. Small Sheet Metal Pull and Junction Boxes: NEMA OS 1.
G. Cast-Metal Access, Pull, and Junction Boxes: Comply with NEMA FB 1 and UL 1773, cast aluminum with gasketed cover.
H. Device Box Dimensions: 4 inches square by 2-1/8 inches deep (100 mm square by 60 mm deep).
I. Gangable boxes are prohibited.
J. Nonmetallic Outlet and Device Boxes: Comply with NEMA OS 2 and UL 514C.
K. Hinged-Cover Enclosures: Comply with UL 50 and NEMA 250, Type 1 with continuous-hinge cover with flush latch unless otherwise indicated.
1. Metal Enclosures: Steel, finished inside and out with manufacturer's standard enamel.
2. Interior Panels: Steel; all sides finished with manufacturer's standard enamel.
L. Cabinets:
1. NEMA 250, Type 1 galvanized-steel box with removable interior panel and removable front, finished inside and out with manufacturer's standard enamel.
2. Hinged door in front cover with flush latch and concealed hinge.
3. Key latch to match panelboards.
4. Metal barriers to separate wiring of different systems and voltage.
5. Accessory feet where required for freestanding equipment.
6. Nonmetallic cabinets shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
PART 3 - EXECUTION
3.1 PATHWAY APPLICATION
A. Outdoors: Apply pathway products as specified below unless otherwise indicated:
1. Exposed Conduit: GRC.
2. Concealed Conduit, Aboveground: EMT.
3. Underground Conduit: RNC, Type EPC-40-PVC.
4. Boxes and Enclosures, Aboveground: NEMA 250, Type 3R.
B. Indoors: Apply pathway products as specified below unless otherwise indicated:
1. Exposed, Not Subject to Physical Damage: EMT.
2. Exposed, Not Subject to Severe Physical Damage: EMT.
3. Exposed and Subject to Severe Physical Damage: GRC.
4. Concealed in Ceilings and Interior Walls and Partitions: EMT.
PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY 280528 - 4
5. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric-Solenoid, or Motor-Driven Equipment): FMC.
6. Damp or Wet Locations: GRC.
7. Pathways for Concealed General-Purpose Distribution of Optical-Fiber or
Communications Cable: General-use, communications-cable pathway, EMT.
8. Boxes and Enclosures: NEMA 250 Type 1, except use NEMA 250, Type 4 stainless steel in institutional and commercial kitchens and damp or wet locations.
C. Minimum Pathway Size: 3/4-inch (21-mm) trade size. Minimum size for optical-fiber cables is
1 inch (27 mm).
D. Pathway Fittings: Compatible with pathways and suitable for use and location.
1. Rigid Steel Conduit: Use threaded rigid steel conduit fittings unless otherwise indicated.
Comply with NEMA FB 2.10.
2. EMT: Use setscrew, steel fittings. Comply with NEMA FB 2.10.
3. Flexible Conduit: Use only fittings listed for use with flexible conduit. Comply with
NEMA FB 2.20.
E. Do not install aluminum conduits, boxes, or fittings in contact with concrete or earth.
F. Install surface pathways only where indicated on Drawings.
G. Do not install nonmetallic conduit where ambient temperature exceeds 120 deg F (49 deg C.
3.2 INSTALLATION
A. Comply with NECA 1, NECA 101, and TIA-569 for installation requirements except where requirements on Drawings or in this article are stricter. Comply with NECA 102 for aluminum pathways. Comply with NFPA 70 limitations for types of pathways allowed in specific occupancies and number of floors.
B. Keep pathways at least 6 inches (150 mm) away from parallel runs of flues and steam or hot-water pipes. Install horizontal pathway runs above water and steam piping.
C. Install no more than the equivalent of three 90-degree bends in any conduit run except for communications wiring conduits for which only two 90-degree bends are allowed. Support within 12 inches (300 mm) of changes in direction.
D. Conceal conduit and EMT within finished walls, ceilings, and floors unless otherwise indicated.
Install conduits parallel or perpendicular to building lines.
E. Pathways Embedded in Slabs:
1. Run conduit larger than 1-inch (27-mm) trade size, parallel or at right angles to main reinforcement. Where at right angles to reinforcement, place conduit close to slab support. Secure pathways to reinforcement at maximum 10-foot (3-m) intervals.
2. Arrange pathways to cross building expansion joints at right angles with expansion fittings.
PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY 280528 - 5
3. Arrange pathways to keep a minimum of 2 inches (50 mm) of concrete cover in all directions.
4. Do not embed threadless fittings in concrete unless specifically approved by Architect for each specific location.
F. Stub-ups to Above Recessed Ceilings:
1. Use a conduit bushing or insulated fitting to terminate stub-ups not terminated in hubs or in an enclosure.
G. Coat field-cut threads on PVC-coated pathway with a corrosion-preventing conductive compound prior to assembly.
H. Terminate threaded conduits into threaded hubs or with locknuts on inside and outside of boxes or cabinets. Install insulated bushings on conduits terminated with locknuts.
I. Install pathways square to the enclosure and terminate at enclosures with locknuts. Install locknuts hand tight plus 1/4 turn more.
J. Do not rely on locknuts to penetrate nonconductive coatings on enclosures. Remove coatings in the locknut area prior to conduit assembly to assure a continuous ground path.
K. Spare Pathways: Install pull wires in empty pathways. Cap underground pathways designated as spare above grade alongside pathways in use.
L. Install pathway sealing fittings at accessible locations according to NFPA 70 and fill them with listed sealing compound.
M. Locate seals so no fittings or boxes are between the seal and the following changes of environments. Seal the interior of all pathways at the following points:
1. Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces.
2. Where an underground service pathway enters a building or structure.
3. Where otherwise required by NFPA 70.
N. Expansion-Joint Fittings:
1. Install in each run of aboveground RNC that is located where environmental temperature change may exceed 30 deg F (17 deg C), and that has straight-run length that exceeds 25 feet (7.6 m). Install in each run of aboveground RMC that is located where environmental temperature change may exceed 100 deg F (55 deg C) and that has straight-run length that exceeds 100 feet (30 m).
2. Install type and quantity of fittings that accommodate temperature change listed for each of the following locations:
a. Outdoor Locations Not Exposed to Direct Sunlight: 125 deg F (70 deg C) temperature change.
b. Outdoor Locations Exposed to Direct Sunlight: 155 deg F (86 deg C) temperature change.
PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY 280528 - 6
c. Indoor Spaces Connected with Outdoors without Physical Separation: 125 deg F
(70 deg C) temperature change.
d. Attics: 135 deg F (75 deg C) temperature change.
3. Install fitting(s) that provide expansion and contraction for at least 0.00041 inch per foot of length of straight run per deg F (0.06 mm per meter of length of straight run per deg C) of temperature change for PVC conduits. Install fitting(s) that provide expansion and contraction for at least 0.000078 inch per foot of length of straight run per deg F (0.0115 mm per meter of length of straight run per deg C) of temperature change for metal conduits.
4. Install expansion fittings at all locations where conduits cross building or structure expansion joints.
5. Install each expansion-joint fitting with position, mounting, and piston setting selected according to manufacturer's written instructions for conditions at specific location at time of installation. Install conduit supports to allow for expansion movement.
O. Flexible Conduit Connections: Comply with NEMA RV 3. Use a maximum of 72 inches (1830
mm) of flexible conduit for equipment subject to vibration, noise transmission, or movement;
and for transformers and motors.
P. Mount boxes at heights indicated on Drawings according to ADA requirements. Install boxes with height measured to center of box unless otherwise indicated.
Q. Horizontally separate boxes mounted on opposite sides of walls so they are not in the same vertical channel.
3.3 FIRESTOPPING
A. Install UL Listed firestopping at penetrations of fire-rated floor and wall assemblies.
3.4 PROTECTION
A. Protect coatings, finishes, and cabinets from damage and deterioration.
END OF SECTION 28 05 28
ACCESS CONTROL 281300 - 1
SECTION 28 13 00 - ACCESS CONTROL
PART 1 - GENERAL
1.1 SUMMARY
A. Payment for all labor, materials, equipment, and consumables shall be included in the contract price as a lump sum for Access Control System Alterations, as per the plans and specifications.
B. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
C. This section includes access control system equipment and accessories consisting of intelligent controllers, door controllers, equipment enclosures, power supplies and coordination and integration in to the existing unified security platform software.
D. The requirements described herein shall be for the provision of all labor, materials, equipment, consumables and other expenses necessary for a complete and operational access control system that is integrated in to the existing unified security platform. The Owner and End-users will cooperate and collaborate with the Integrator, but all installation resources are the responsibility of the Integrator.
E. Section Includes:
1. Security access controllers connected to high-speed electronic-data transmission network.
2. Equipment enclosures and power supplies.
3. Access Control card readers, request to exit devices and door sensors.
4. Badging hardware.
5. Access cards.
1.2 DEFINITIONS
A. Credential: Data assigned to an entity and used to identify that entity.
B. Door Controller: Electronic circuit board consisting of microprocessors and memory to act as an interface between an Intelligent Controller and door hardware and sensors. A Door Controller connects to an Intelligent Controller via a serial communications connection.
C. Identifier: A credential card, keypad personal identification number or code, biometric characteristic, or other unique identification entered as data into the entry-control database for the purpose of identifying an individual. Where this term is presented with an initial capital letter, this definition applies.
D. Intelligent Controller: Electronic circuit board consisting of microprocessors and memory to store the access database. An Intelligent Controller uses on-board Ethernet port to connect to cloud or server-based access control system hosts to obtain the access database and to report
ACCESS CONTROL 281300 - 2
access events and alarms. The Intelligent Controller performs access control, alarm management and scheduled operations.
E. Location: A Location on the network having a intelligent controller communications link, with additional Controllers at the Location connected to the intelligent controller via TIA 485-A communications loop. Where this term is presented with an initial capital letter, this definition applies.
1.3 ACTION SUBMITTALS
A. Product Data: For each product indicated. Include product data sheets with dimensions and equipment features, performance, electrical characteristics, ratings, and finishes.
B. Shop Drawings: For access control include plans, elevations, sections, details, and attachments to other work.
1. Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and each field connection.
2. Dimensioned plan and elevations of equipment enclosures, control panels, and pathways. Show access and workspace requirements.
3. Functional Block Diagram: Show single-line interconnections between components for signal and control transmission. Show cable types and sizes.
4. Wiring Diagrams: For power, signal, and control wiring.
5. Backup Power-Supply Capacity: 90 minutes of battery supply. Submit battery and charger calculations.
C. Equipment List: Include every piece of equipment by model number, manufacturer and intended location installation.
D. Quality assurance submittals described in paragraph 1.4.
E. Operation and maintenance data.
1.4 QUALITY ASSURANCE SUBMITTALS
A. No work shall proceed without approval of the quality assurance submittals. Delays in providing the quality assurance submittals will not relieve the Electronic Security Systems
Integrator of its responsibility to maintain the project progress as agreed and documented, by the
Integrator, in the approved project schedule.
B. The Electronic Security Systems Integrator shall be a Certified Genetec Channel Partner. The
Integrator shall submit documentation demonstrating a current Genetec Channel Partner certification. Failure to provide adequate documentation for its Genetec Channel Partner certification will be considered as a disqualifying factor for the Integrator.
ACCESS CONTROL 281300 - 3
C. The Electronic Security Systems Integrator shall have been continuously engaged in the integration of the components referenced in this specification for a minimum of 5 years. Submit documentation of required integration experience. Failure to provide adequate documentation for access control systems integration of similar size and complexity will be considered as a disqualifying factor for the Integrator. Installation experience may not be substituted for integration experience.
D. The Electronic Security Systems Integrator shall have been continuously certified equipment installer for the proposed manufacturer for a minimum of 2 years. The Integrator shall be responsible for the total installation of all access control equipment and duly qualified to install, configure and maintain each access control system component without support from any party other than equipment manufacturer.
E. The Electronic Security Systems Integrator’s Project Manager shall have been continuously engaged in the management of IP and analog access control systems integration projects for a minimum of 2 years. Submit documentation of required Project Management experience for systems of the similar type, size, and design as specified herein. Include the names, locations, and points of contact of at least three installations of similar type and design as specified herein.
Indicate the type of each system and certify that each system has performed satisfactorily in the manner intended for a period of not less than 12 months. The Project Manager shall be authorized to act on behalf of the Integrator and have the authority to execute reasonable changes required during the integration process without additional approvals. The Project
Manager shall attend, in person, all coordination and periodic status meetings.
F. Access Control Equipment Installer(s): Prior to installation activity, submit data of the installer’s experience and current certified qualifications. Show that the installer who will perform the work has a minimum of 2 years of experience successfully installing access control equipment of the same type and design as specified herein. Include the names, locations, and points of contact of at least three installations of the similar type, size, and design as specified herein where the installer has installed such systems. Indicate the type of each system and certify that each system has performed satisfactorily in the manner intended for a period of not less than 12 months.
G. Instructor’s Qualifications: Prior to the installation, submit data of the instructor’s experience and certified qualifications. Show that the instructor, who will train operating and maintenance personnel, has received a minimum of 40 hours of training from the specified manufacturers, and 2 years of experience in the installation of systems of the type specified.
H. Schedule: Submit an integrated schedule for all installation, integration and cut-over activities for approval. Schedule shall be in Gantt chart format depicting each activity, its duration, the proposed start and end dates for each activity, and the critical path for project completion.
I. Test Procedures: Test procedures shall explain, in detail, step-by-step actions and expected results demonstrating compliance with the requirements of the specification. Test reports shall be used to document results of ALL tests including pre-testing, field verification testing, performance testing, endurance testing, and acceptance testing. Reports shall be delivered to the
Owner’s representative within 5 business days after completion of each test. Late submittals will be rejected and the testing will be repeated and timely reports submitted. Do not proceed to the
ACCESS CONTROL 281300 - 4
next stage of integration or testing without written acceptance of the Owner or Owner’s representative.
1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For controllers, card readers, door hardware, distribution equipment, and recording equipment to include operation and maintenance manuals. In addition include the following:
1. System configuration and equipment physical layout.
2. Functional description of equipment.
3. Instructions on operation, adjustment and cleaning.
4. Illustrations and diagrams to supplement procedures.
5. Software documentation:
a. PC installation and operating documentation, manuals, and software for the PC and all installed peripherals. Software shall include system restore, emergency boot diskettes, and drivers for all installed hardware. Provide separately for each PC.
b. Hard copies of manufacturer's specification sheets, operating specifications, design guides, user's guides for software and hardware, and PDF files on CD-ROM of the hard-copy submittal.
c. System installation and setup guides with data forms to plan and record options and setup decisions.
6. Lists of spare parts and replacement components recommended to be stored at the site for ready access.
1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace equipment related to the access control system equipment and badging station equipment that fail within specified warranty period.
B. Warranty Period: One year from date of Substantial Completion.
C. Manufacturer extended warrantees, if offered by the manufacturer, shall be conveyed to the owner at the time of final acceptance.
D. Installer will prepare and submit warrantee filings in sufficient time to present proof of warrantee at the final acceptance inspection.
1.7 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
ACCESS CONTROL 281300 - 5
B. Comply with NFPA 70, "National Electrical Code".
C. Comply with NECA 1-2015: Standard For Good Workmanship In Electrical Construction
(ANSI).
1.8 PROJECT CONDITIONS
A. Environmental Conditions: System shall be capable of withstanding the following environmental conditions without mechanical or electrical damage or degradation of operating capability:
1. Indoor, Controlled Environment: NEMA 250, Type 1 enclosure.
This is the start of the file's text. The full file is on GovTribe.