ATTACHMENT J.5 – Q&A Matrix for Design RFQ Questions
| 1. |
| L.7.1 |
| Page 74 |
| Please confirm that a master services contract or IDIQ contract, versus a single task/delivery order, will be considered a distinct project. |
| Distinct projects can be of any nature as long as they are of similar size and scope. |
| 2. |
| 5.7.1 |
| Page 7 |
| Does the OCC have planning & design standards (i.e. furniture, room layouts, power and data, etc.) that will be used for this contract? |
| Yes. |
| 3. |
| C.3.7 Additional Services |
5.6 Design Development
5.7 Construction Documentation
| Please confirm/ clarify the extent of engineering services to be provided by the Contractor under this IDIQ Contract. Please confirm that there are sufficient engineering consulting services to support inclusion in the small business subcontracting plan. |
| There may be some or not any engineering consulting services needed. These services are included in case a special study, analysis, MEP design or CDs (if a Landlord doesn’t have an engineering firm) is needed. |
| 4. | |
| H.4 | |
| 27 | |
| When evaluating task order Proposals, will the |
Gov’t use information already in its file and past performance under prior orders of an Incumbent from the preceding IDIQ to evaluate task orders issued under this new IDIQ? Please answer using the assumption that a current Incumbent is an awardee for this new IDIQ.
Yes.
| 5. | |
| Section M, Factor 3, Socio-Economic Status Rating chart |
| 82 | |
| How will the Gov’t rate an Offeror that is an 8(a) |
business? Please assume the business is not HUBZone, WOSB, or SDVOSB in answering this question.
An 8(a) that is not an Hubzone, WOSB or SDVOSB will be evaluated as a Small Disadvantaged Business (SDB).
| 6. | |
| Section C.4.1, first paragraph, first sentence |
| 13 | |
| Is the alternate Project Director a Key Personnel? |
No the alternate is not considered a Key Personnel Position.
Will non-government personnel be part of the source selection? Such as but not limited to, for example, FFRDC personnel or other contractors providing support to the OCC.
If so, please clarify how the Gov’t will handle Offerors’ proprietary information.
Non-government personnel will not be part of the source selection process.
8.
| Is a master leasing agreement currently being used by Treasury-OCC for any of the facilities within the scope of this RFP? If so, with whom is the master leasing agreement? |
| No. |
9.
| Would you please verify that this RFP is in fact out for response, due July 28, 2014 at 3pm EST. |
| Page 72 of the RFP states 5:00 PM. The SF 1449 States 3:00 PM. The correct response time is 5 PM. |
10.
| Please verify, There is additional information needed to respond as the uploaded RFP starts on page 3 and ends on page 84. (It appears that pages 1 and 2 might be missing.) |
| Pages 1 and 2 are the SF 1449. There is no missing information. |
C.3.2.6 (page 8 of 84) states “Engineering drawings are typically the landlord’s responsibility. The Contractor shall coordinate with engineers to ensure that the Engineering drawings conform to OCC’s design intent.” This conflicts with the reminder of this paragraph. “ In addition, the Contractor shall issue complete architectural and engineering documents to the landlord for bidding and possess the capability to stamp and seal construction documents in all 50 states.”
The Contractor shall coordinate with the engineers to make sure the engineering drawings conform to the OCC’s design intent. Once the engineers have incorporated comments made by the Contractor, the Contractor will submit the completed architectural and engineering drawings to the Landlord for pricing. The Contractor will stamp and seal the architectural drawings and the engineer will stamp and seal the engineering drawings. The Contractor must be able to stamp and seal drawings in all 50 states.
C.3.2.6 conflicts with C.3.3: “The Contractor shall review and approve all necessary shop drawings, samples and submittals, etc…” Industry Standards and architectural liability insurance conflict with a Prime Architect to be contractually liable for the landlord’s selection of an engineer’s work.
The Contractor is responsible for reviewing and approving all shop drawings, etc. related to his drawings as the engineer is responsible for actions related to the engineering documents.
| 13. |
| L.4 |
| 72 |
| Can we submit a PDF or must it be only in a Word Document? |
| A PDF is also acceptable. |
| 14. |
| L.5 Submission of Offers |
| 72-73 |
| Our corporate resume format standard includes the body copy in 10 point type and 7 point type in the header, footer, and vertical text box. |
| L.7.2.1 states the format of the resumes is left to the discretion of the offeror. Section L.5 does not apply to resumes. |
| 15. |
| L.7.2.1 Resumes |
| 75 |
| “Each resume must follow the same format”, does this mean that the formats must match each other or follow L.5? If we can use our own formatting on the resumes, are we allowed to use our corporate logo and corporate formatting/margins? |
| L.7.2.1 states the format of the resumes is left ot the discretion of the offeror. Section L.5 does not apply to resumes. |
| 16. |
| C.4.1 Project Team Structure |
| 13 |
| With supplying an alternate to the Project Director, do we supply a separate individual with a resume, or can we differ to a different individual within the team? |
| A company can submit either a separate individual or a different individual within the team as the alternate. |