CC-0923-04033-1-2-M74-M-2000-XB.pdf
PDF 97 KB Posted
- Attached to
- Temporary Sewer Line at Coast Guard Academy
- Solicitation number
- 70Z03926QCGA00050
About this file
This document is an architectural/engineering drawing showing construction sections and details for what appears to be a demolition or renovation project. The drawing is divided into two main sections: Section A-A (Demolition) at a scale of 1/2"=1'-0" and Section B-1 (New Work) at a scale of 3/4"=1'-0". The sections illustrate structural components including floor systems, wall penetrations, waterproofing details, and utility routing. Key elements depicted include existing penetrations to be filled with waterproof grout, drain systems with piping configurations, discharge specifications, pump and float switches, sump details, and concrete work. The drawing contains multiple callouts and annotations referencing specific construction requirements, material specifications, and installation procedures for both the demolition and new construction phases.
The technical details shown include inlet pipe configurations, sanitary filled waste cone specifications, corbel details, and various connection points for mechanical and plumbing systems. This appears to be a contract support document that would accompany solicitation documents such as an RFP or SOW to provide bidders with detailed technical specifications and visual references for the scope of construction work required. The drawing references specific measurements, elevations, and assembly details necessary for contractors to accurately estimate costs and plan execution of the work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .