CC-0923-04033-1-2-M74-M-2000-XA.pdf
PDF 77 KB Posted
- Attached to
- Temporary Sewer Line at Coast Guard Academy
- Solicitation number
- 70Z03926QCGA00050
About this file
This is a technical engineering drawing depicting a pump floor plan for a demolition project. The drawing is scaled at 1/2" = 1'0" and shows a detailed layout of pump equipment and associated piping systems positioned on a floor. Key components illustrated include an 8-inch beam, a bar screen, a sluice gate with removable concrete trough, a 6-inch overflow pipe at the top with an invert elevation of 3'2", a 1-inch inlet pipe, and a 6-inch discharge pipe with an elevation of 0' to -2'0" connected to an existing metal gate valve. The drawing also depicts multiple pumping units with piping arrangements, directional flow indicators, and precise dimensional measurements for spatial positioning. The plan includes compass orientation marking point A and provides detailed elevation and structural references necessary for construction or demolition work. This appears to be a technical specification document that would accompany a contract for infrastructure demolition services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .