CBC - 09PL100_JSI044.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25920Q0679
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08AS301 JSI060.pdf | ||
| S02 - 2015-06-05 Past Performance Questionnaire.docx | DOCX document | |
| 08AS201.pdf | ||
| CBC - Pages from Plumbing_Piping_As-Builts.pdf | ||
| CBN - 08PL100_JSI044.pdf | ||
| Sanitary Sewer Photos 1 of 2.zip | ZIP file | |
| 04 30 0012 CBN Stone Veneer SD.pdf | ||
| PDF Contaminated zone cleaning procedures.pdf | ||
| 09SS101.pdf | ||
| XXSS550_CD6.pdf | ||
| 36C25920Q0679_1.docx | DOCX document | |
| 08SS101.pdf | ||
| Excavation OSHA.pdf | ||
| 554-19-130 Specifications.pdf | ||
| 09AS201.pdf | ||
| Sanitary Sewer Photos 2 of 2.zip | ZIP file | |
| Dezurik cast stainless-steel knife-gate valve.pdf | ||
| 22 13 00_JSI041.pdf | ||
| CBN - Pages from Plumbing_Piping_As-Builts.pdf | ||
| PDF Cleaning and Sanitizing factsheet.pdf | ||
| 09AS301 JSI060.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP DN
DN
UP
09-01-B3-09
EXAM
09-01-G2-02
HAC
09-01-C1-03
OFFICE
09-01-C1-04
OFFICE
09-01-B1-06
OFFICE
09-01-B2-01
HAC
09-01-B4-03
WAIT
09-01-C3-05
NURSE
STATION/MED
09-01-E3-06
CLEAN SUPPLY
09-01-H3-02
NURSE
STATION/MED
09-01-C3-04
PAT TLT
09-01-D3-01
PAT TLT
09-01-C2-04
PROCEDURE
09-01-E2-06
PROCEDURE
09-01-C4-01
CONSULT
09-01-C3-03
EXAM
09-01-C3-02
EXAM
09-01-C3-01
EXAM
09-01-C2-02
EXAM
09-01-C2-01
EXAM
09-01-D4-02
EXAM
09-01-D3-05
EXAM
09-01-D3-04
EXAM
09-01-D2-04
EXAM
09-01-D2-03
EXAM
09-01-E3-02
EXAM
09-01-E3-01
EXAM
09-01-E2-03
EXAM
09-01-E2-02
EXAM
09-01-F3-05
EXAM
09-01-F3-04
EXAM
09-01-F2-04
EXAM
09-01-G4-01
EXAM
09-01-G3-03
EXAM
09-01-G3-02
EXAM
09-01-G3-01
EXAM
09-01-G2-04
EXAM
09-01-G2-03
EXAM
09-01-H4-02
EXAM
09-01-H3-07
EXAM
09-01-H3-06
EXAM
09-01-H3-05
EXAM
09-01-H2-06
EXAM
09-01-H2-05
EXAM
09-01-B2-05
CLEAN SUPPLY
09-01-F2-01
CLEAN SUPPLY
09-01-E2-01
SOILED UTIL
09-01-G2-01
SOILED UTIL
09-01-D1-04
OFFICE
09-01-D1-05
OFFICE
09-01-D1-06
OFFICE
09-01-H1-03
OFFICE
09-01-H1-04
OFFICE
09-01-H1-05
OFFICE
09-01-H1-01
OFFICE
09-01-H1-02
OFFICE
09-01-G1-05
OFFICE
09-01-G1-06
OFFICE
09-01-G1-03
OFFICE
09-01-G1-04
OFFICE
09-01-G1-01
OFFICE
09-01-C4-03
ONSTAGE AREA
09-01-E4-03
ONSTAGE AREA
09-01-C3-07
PRECEPTOR RM
09-01-E3-08
PRECEPTOR RM
09-01-G3-07
PRECEPTOR RM
09-01-D2-02
EXAM09-01-F2-03
CONSULT
09-01-H4-01
CONSULT
09-01-F1-02
OFFICE
09-01-F1-03
OFFICE
09-01-C1-06
OFFICE
09-01-C1-05
OFFICE
09-01-F1-01
CONF
09-01-E1-02
STAFF TLT
09-01-D1-01
OFFICE
09-01-B4-01
OFFICE
09-01-G4-04
HAS
09-01-E4-04
HAS
09-01-C4-04
HAS
09-01-G3-08
WEIGHT STN
09-01-H3-04
WEIGHT STN
09-01-C3-08
WEIGHT STN
09-01-D3-02
WEIGHT STN
09-01-E3-09
WEIGHT STN
09-01-F3-02
WEIGHT STN
09-01-G3-05
PAT TLT 09-01-F3-01
PAT TLT
09-01-E2-04
CONSULT
09-01-H3-01
STAFF TLT
09-01-F2-02
PRECEPTOR RM
09-01-D3-06
EXAM
09-01-D1-02
OFFICE
09-01-B1-02
TRAINER
09-01-B2-03
TRAVEL
09-01-B2-02
TRAVEL
09-01-A3-03
OFFICE
09-01-B1-03
OFFICE
09-01-C1-01
OFFICE
09-01-A3-04
OFFICE
09-01-A3-05
OFFICE
09-01-B3-02
OFFICE
09-01-B3-03
OFFICE
09-01-B3-04
OFFICE
09-01-A4-05
OFFICE
09-01-A4-04
OFFICE
09-01-A4-03
OFFICE
09-01-A4-02
OFFICE
09-01-A1-01
STRETCHER/W.C.STOR
09-01-B3-08
EXAM
09-01-A1-03
PHONE INTAKE
09-01-A1-02
PHONE INTAKE
09-01-B1-05
OFFICE
09-01-H2-04
DERMATOLOGY
LAB
09-01-H2-03
TREAT/PROCEDURE
09-01-G2-06
PHOTOTHERAPY
TREAT
09-01-G2-05
PHOTOTHERAPY
SHOWER
09-01-H2-02
MED PREP/STOR
09-01-B1-01
PHONE INTAKE
09-01-F2-05
EXAM
09-01-G4-02
WAIT
09-01-G4-03
ONSTAGE AREA
09-01-B3-06
RECEPT
09-01-B3-07
RECEPT
09-01-B3-01
WORK
09-01-B1-04
OFFICE
09-01-B3-05
CORRIDOR
09-01-D3-03
CORRIDOR
09-01-C3-06
CORRIDOR
09-01-E3-07
CORRIDOR
09-01-E3-04
CORRIDOR
09-01-G3-04
CORRIDOR
09-01-G3-06
CORRIDOR
09-01-H3-03
CORRIDOR
09-01-B2-07
WAIT
09-01-E2-05
EQUIP STOR
09-01-A3-06
RECEPT
09-01-B2-04
TRAVEL
09-01-A3-02
OFFICE
09-01-C4-02
WAIT
09-01-D4-03
WAIT
09-01-E4-02
WAIT
09-01-F4-03
WAIT
09-01-E3-05
STAFF TLT
09-01-E1-01
STAFF TLT
09-01-D4-01
PUBLIC TLT
09-01-F4-01
PUBLIC TLT
09-01-E1-03
STAFF LOUNGE
09-01-D1-03
SECRETARY
09-01-B4-02
120 SF /118 SF
EXAM/FITTING09-01-E4-01
120 SF /117 SF
262S
EXAM
09-01-E3-03
120 SF /119 SF
262S
EXAM
09-01-F4-02
120 SF /119 SF
262S
EXAM
09-01-F3-06
120 SF /119 SF
262S
EXAM
09-01-A2-01
120 SF /103 SF
CONSULT
09-01-A1-04
/Not Enclosed
GROSS
CORRIDOR
09-01-D1-07
CORRIDOR
09-01-F1-04
CORRIDOR
09-01-C3-09
CORRIDOR
09-01-B2-06
OFFICE
09-01-C2-03
STOR09-01-D2-01
CAST/PODIATRY
09-01-F3-03
CORRIDOR
09-01-A4-06
CLINIC WAITING
09-01-D2-E1
ELEC
09-01-E2-T1
DATA / TELECOMM
09-01-G2-E2
ELEC
09-01-H2-T2
DATA / TELECOMM
09-01-ST2
STAIR
09-01-D2-H2
CHUTE 09-01-SE6
ELEV
09-01-ST1
STAIR
4"FCO
4"FCO
4"FCO
4"GCO
6"W
4"W
6"W
4"W
6"W
4"W
6"W
4"W
6"W
6"W
4"W
4"FCO
4"W
4"W STACK
4"W STACK
4"W STACK
4"W STACK
6"W
4"W
4"W
09-SP-01
12"OFD TO DS NOZZLE
LOCATED 6" AFG. RE:
LANDSCAPE DWGS. 31,281
SQFT (2,906 SQ METERS)
12"OFD DN
FROM ABOVE.
4"GCO (TWO-WAY)
INV.: 85.53'
(5373.53' USGS)
6"W
INV.:92.33'
(5380.33' USGS)
CO TEE
FULL PORT CAST IRON PLUG VALVE
SIDE MOUNTED FOR PLUG OUT OF
STREAM AT TOP IN OPEN POSITION.
LOCATE VALVES ACCESSIBLE IN VAULT
WITHIN CRAWLSPACE.
NC
4"GCO (TWO-WAY)
INV.: 85.53'
(5373.53' USGS)
RE: CIVIL DWGS. BY-PASS
TO SANITARY SEWER
HOLDING TANK.
INV.:94.0'
(5382.0' USGS)
4"V(SAN HOLDING TANK)
INV.: 94.0' (5382.0' USGS).
TO SANITARY SEWER
HOLDING TANK. RE: CIVIL
DWGS.
4"V(SAN HOLDING
TANK) UP TO LEVEL
ABOVE.
4' - 0"
540 DFU540 DFU
2"W
4"W
3"W
3"W
3"W4"W
2"W
3"W
4"W
3"W
3"W
2"W2"W
3"W
3"W
2"W
2"W
2"W
2"W
INV.: 97.17'
(5385.17' USGS)
INV.: 96.0'
(5384.0' USGS)
2"W
2"W
3"W
2"W
6"W
2"W
2"W
2"W
3"FCO
P-502
FINISHED FLOOR
ELEVATION 100.0'
(5388.0' USGS)
FINISHED FLOOR
ELEVATION 100.0'
(5388.0' USGS)
3"W
2"W
3"W
INV.: 96.83'
(5384.83' USGS)
INV.: 94.83'
(5382.83' USGS)
INV.: 93.53'
(5381.53' USGS)
2"W
4"W
4"W
2"W
2"W
3"W
2"W
3"W
2"W
2"W
3"W
2"W
4"W
2"W
4"W
4"W
4"W 2"W
2"W
2"W
3"W
3"W
2"FD
TYPE C
3"W
2"W
3"W
INV.: 95.25'
(5383.25' USGS)
INV.: 96.50'
(5384.50' USGS)
2"W
2"V UP TO
ABOVE
FLOOR.
4"W
4"W
2"W
2"W
INV.: 96.10'
(5384.10' USGS)
2"W
3"FCO
INV.: 97.34'
(5385.34' USGS)
INV.: 95.83'
(5383.83' USGS)
2"W
6"W
2"W
2"PUMPED IW
FROM ELEV PIT
UP TO ABOVE
FLOOR.
2"IW
4"W
2"W
3"W
2"W
2"W
2"W
3"W
2"W
2"W
P-401
P-101
P-401
P-101
P-528
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-401
P-101
P-414
P-103
P-529
P-419
P-419
P-507
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-408
P-505
P-401
P-101
P-101
P-401
P-401
P-101
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-420
P-520
P-420
P-502
P-408
P-101 P-401
P-401
P-101
P-529
P-701
P-414
P-608
P-420
P-101
P-401
P-420
P-419
P-530
P-419
P-419
P-419
CO TEE
3"W
3"W
3"W
09.PL.211
09.PL.211
09.PL.211
09.PL.211
NOTE: REFER TO 09.PL.211 FOR
WASTE AND VENT ISOMETRIC FOR
FOUNDATION PLUMBING WASTE
AND VENT.
P-420
2"W
2"W
2"FCO
4"W
D
D
C
C
B
B
A
A
E
E
J
J
H
H
G
G
F
F
E
E
D
D
C
C
B
B
A
A
A
A
4.6
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C O N
R E S
D A T
I B S
I B N
E N C
C L C
C B N
C B C
C B S
P S N
P V N
P V S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e ig h th i n c h o n e f o o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
H+L Architecture 1755 Blake Street, Suite 400 Denver, CO 80202
Skidmore, Owings & Merrill LLP 224 South Michigan Avenue Suite 1000 Chicago, IL 60604
Cator, Ruma & Associates 896 Tabor Street Lakewood, CO 80401
S. A. Miro, Inc.
4582 South Ulster Street Pkwy.
Suite 300 Denver, CO 80237
Professional Seal
/1 /2 :4 :3 A M
D R e v it L o c a l P ro je c ts \2 \P L -I F O -S h e e ts b g e tt e l.
rv t
09.PL.100
LEVEL 1 FOUNDATION WASTE, DRAIN
AND VENT PIPING PLAN
CLINIC BUILDING (CENTER)
06/15/2012
1/8" = 1'-0"1
LEVEL 1 FOUNDATION WASTE,
DRAIN AND VENT PIPING PLAN
0' 4' 12' 24' 42'-8"0' 4' 12' 24' 42'-8"
1 1
CDI No.10 06/15/2012
CDI No.12 08/31/2012
JSI No. 044 12/19/2012
FCO
09-01-C2-04
PROCEDURE
WP01
D
A4A
A4A
G2A
G2A
G2A
C4A
C4A
C4A
1'
0" 3'
/2
6'
2 1/2" 12' - 7 1/2"
C4A
09.AI.502
09-01-C2-03
STOR
TYP.
1' - 0" 1' - 2"
1'
4"
TY
P.
1'
0"
1' - 6"
8"
3' - 9"
AG4A
AG4A
AG4A
KT RFI #1524/VA #1417:
Widen wall and move waste pipe South of the beam. See RFI sketches for room changes.
KT RFI #2805/VA #2528:
Cleanouts withiin building footprint should be labeled
"FCO"
KT RFI #2968/VA #2596:
It is acceptable to lower building drain to 90.00'
KT RFI #1045/VA #0941:
VE P-025/JSI 44 revised overflow drain sizes
KT RFI #3747/VA #3447 and KT
RFI 4036/VA #3645:
Clarification on drinking fountain type & installation
Issues at this location:
> Plug-valves located in concrete vault within crawl space.
Connections are flanged.
> Y fitting located under 84" of dirt.
> Remove plug-valves and Y fitting > Install knife gate-valve
Southeast discharge:
View looking West.
Southeast discharge:
View looking East
6" sanitary line to wastewater facility
6" sewer line to sanitary 50,000 gal.
holding-tank
| 2012-12-17T15:01:23-0700 | |
| Dennis F. Rudko |
File details come from the government source that posted it. Updated .