04 30 0012 CBN Stone Veneer SD.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25920Q0679
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08AS301 JSI060.pdf | ||
| S02 - 2015-06-05 Past Performance Questionnaire.docx | DOCX document | |
| 08AS201.pdf | ||
| CBC - Pages from Plumbing_Piping_As-Builts.pdf | ||
| CBN - 08PL100_JSI044.pdf | ||
| Sanitary Sewer Photos 1 of 2.zip | ZIP file | |
| PDF Contaminated zone cleaning procedures.pdf | ||
| 09SS101.pdf | ||
| CBC - 09PL100_JSI044.pdf | ||
| XXSS550_CD6.pdf | ||
| 36C25920Q0679_1.docx | DOCX document | |
| 08SS101.pdf | ||
| Excavation OSHA.pdf | ||
| 554-19-130 Specifications.pdf | ||
| 09AS201.pdf | ||
| Sanitary Sewer Photos 2 of 2.zip | ZIP file | |
| Dezurik cast stainless-steel knife-gate valve.pdf | ||
| 22 13 00_JSI041.pdf | ||
| CBN - Pages from Plumbing_Piping_As-Builts.pdf | ||
| PDF Cleaning and Sanitizing factsheet.pdf | ||
| 09AS301 JSI060.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RETURN OF SUBMITTAL
flA i nflflfl1') title (Jr Description uate: spec. section:
| CBN - Stone Veneer SD's | ( (' f | 04 30 00 |
| Contractors Name and Address | Station Location: |
Chris Bantner 13611 East Colfax Ave.
Aurora, CO 80045
Kiewit-Turner, a Joint Venture Contract No: Prolect No:
| 13611 East Colfax Avenue | VAI 01 CFM-C-01 00 | 554-501 |
| Aurora, CO 80045 | Transmittal Date: | VA File No: |
10/17/2014 043000-012
Submittal Scope Shop drawing and calculation review.
Submittal Items Acted Upon
Submittal Item
001 CBN - Stone Veneer SD's
Supplier or Manufacturer
Soderberg Masonry
Notes/Comments [11/10/2014 Jacobs - George Volz] See submittal for comments.
Status
AN-
Submittal Type
Shop Drawings
Approved as Noted
Reviewed by Preston Maseda
Signature of Authorizing Official
Date
S
Received 11/14/201411/13/2014
KIEWIT-TURNER
a Joint Venture
These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.
❑ REVIEWED - NO COMMENTS MADE
0 REVIEWED WITH COMMENTS
0 RESUBMITTAL REQUIRED
DATE 10/17/14SIGNED_ ~'
SUBMITTAL #: 04 30 00-12
H-+L SOM CRA. SAM
ARCHITECTS ENCIEERS
1755 Blake Street. Suite 400, Denver CO 80202
PH 303-295-1792. FAX: 303-292-6437
VA ECHCS REPLACEMENT MEDICAL CENTER PROJECT
13611 East Colfax Avenue, Aurora, CO 80045
Project: 554-50 1/Contract Number: VA101CFM-C-0100
Received Date: 10/17/2014
A/ESubmittalNumber 043000-12___________________
WE Comments and/or Corrections are Clouded
Reviewed By SOM/IKCBG Bath 11/03/2014
VA ACTION
0 Approved QApproved.AsNoted
0 Disapproved, As Noted ❑ No Action
0 No Deviation Noted: None Approved
RE: ri M
Date !l_1C_ r1'
&rV
Fax: 303.930.9001
303.930.9000Tel:
Kiewit - Turner a Joint Venture
Suite A-300 7200 S. Alton Way
Englewood, CO 80112
Job: 15387 - Replacement Medical Center Facility
Product Data
Sample
Other
Shop Drawing
Resubmittal
First Submittal X
VA Proj #:
To: H+L Architecture 1755 Blake Street
Suite 400
Denver, CO 80202
DESCRIPTIONSpecificationSUBMITTAL
ItemQuantity Section Sub./SupplierNo. Mfgr.
ACTION
DCBA E
Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008
Review Cycle: 001
Attn: Chuck Adkisson
1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a
Joint Venture
01 573
ACTION TAKEN
CONTRACTOR'S SIGNATURE:
CONTRACTOR'S NOTES:
DATE: 7/12/2011
Reviewed Only for Revisions to
Reviewed: Incorporate Changes
Reviewed=
A
B
C
Previous Submittal
Revise and Resubmit=D
Rejected =E
ARCHITECT/ENGINEER RESPONSE:
REMARKS:
BY: DATE:
Expedition f_sb_pks_01a
VA101CFM-C-0100
Cc: Tim Pogany, U.S. Dept. of Veterans Affairs
Received By ___________________
Date _______________
04 30 00
X
CBN Stone Veneer SD's
X
Soderberg Masonry
04 30 0012
10/17/2014
10/28/2014
Kiewit-Turner Submittal No.
VA 1
JVT 2
REQUESTED RETURN DATE:
Kevin Lindsey, U.S. Dept. of Veterans Affairs
By VACO BoltonT at 3:23 pm, Nov 06, 2014
These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.
KIEWIT-TURNER
a Joint Venture
REVIEWED - NO COMMENTS MADE
REVIEWED WITH COMMENTS
RESUBMITTAL REQUIRED
DATE SIGNED
SUBMITTAL #: 04 30 0012
10/17/14
SOM/IKC-BG
11/03/2014
10/17/2014 04 30 00-12
Kiewit-Turner a Joint Venture
7200 S. Alton Way, Suite A-300, Englewood, CO 80112
Phone: 303-930-9000 FAX: 303-930-9001
Project Name:
Subcontractor Name: Submittal Date:
Contact Name: E-mail: Return By Date:
Contact Phone(s): Review Days:
Number: Name:
1.4.B 3.2-B
3.2-B-3 YES YES NO YES X 1-16 BLDGS: 07 CLINICAL BUILDING NORTH A.K.A. CBN
REFERENCE: VA RFI #4464 & KT RFI #5106
JNACOS@SODERBERGMASONRY.COM ASAP
Submittal Type
Submittal Item Description Manufacturer S p e c if ie d o r L is te d
M a n u fa c tu re r?
(970) 482-3766
Specification Section: 043000 ST-51 ASHLAR STONE VENEER - BLDG 07 CBN
S p e c
S u b m it ta l
P a ra g ra p h
Submittal is in Compliance
ST-51 "EXTERIOR STONE UNIT MASONRY" ASHLAR
S p e c
P ro d u c t
P a ra g ra p h
Submittal is in Compliance with Variances from Specifications
Signature
All Materials in this submittal (X) do ( ) do not comply with th FAR 52.225-11 Buy American Act
SUBMITTAL INDEX & COVER SHEET Department of Veteran's Affairs
Replacement Medical Center
SODERBERG MASONRY, INC. 10/10/14
JOHN NACOS
SHOP DRAWINGS
N O
T E
S
Reviewed By Date
I n
T h is P a c k a g e
P a g e
SODERBERG MASONRY, INC.
E x c e p ti o n s o r
V a ri a n c e s f ro m S p e c
A p p ro v e r In fo rm a ti o n
N e e d e d
M e e ts
A ll
S p e c
R e q u ir e m e n ts
SubmittalIndexForm_041009 Page 1 of 1 mailto:JNACOS@SODERBERGMASONRY.COM
A
N
N
A
N
N
A
N
N
A
N
N
A
N
N
A
N
N
A
N
N
A
N
N
A
08 CLINIC BUILDING NORTH
Please VIF corbels elevations.
previously approved for reference only
SUBMITTAL # 04 30 00-10
D/4
#4
This DP01 system is designed to meet specifications 07 11 13 - 3.3B and 07 21 13 - 2.2A.
Refer to engineering in this submittal (pages 5-16) for spacing of ties at sill stone.
Weep tubes to be installed at 24" O.C. per spec. 04 30 00 - 3.2-G see comments on previous submittal previously approved for reference only
SUBMITTAL # 04 30 00-10
5 - 16
2"
Per specification 04 30 00 -3.2 -I, a minimum of one tie is required every 2 S.F. of area.
this should be clouded as it incorporates comments from the previous submittal
RE: DETAIL D.1/4 OF THIS SUBMITTAL
These calculations are for the angle in detail B (not in this submittal) as well as calculations for typical sill stone anchorage. These calculations have been included as one document to maintain consistancy.
Shelf angle does not apply for CBN/CBC
Shelf Angle not apply for CBN/CBC
Shelf Angle Does not
Shelf angle does not
| Worksheets |
| SubmittalIndexForm_041009 |
| Index sheet |
| Elevations |
| Detail A |
| Detail D/D.1 |
| Calculations |
File details come from the government source that posted it. Updated .