Carpenter_Shop,_Gas_Storage,_Water_Dept_Asbestos_Survey_Report.pdf

PDF 6 MB Posted

Attached to
Demolition, Asbestos Abatement, Lead Paint & Hazardous Materials Removal
Solicitation number
2026-063
Issued by
Alachua County, Graceville City, Florida

About this file

This is an Asbestos Survey Report prepared for Collin County, Texas, documenting asbestos-containing materials (ACM) identified at multiple county facilities including the Carpenter Shop, Gas Storage, and Water Department Administrative and Storage buildings. The survey provides the technical foundation for the county's sealed bid procurement (IFB #2026-063) for generator replacement and comprehensive hazardous materials abatement at the Collin County Adult Detention Facility (CCADF) Lower B. The project encompasses full asbestos abatement of all ACM identified in the survey, lead-based paint waste handling and disposal, removal of hazardous building components, and complete demolition to slab/subgrade with site stabilization. Two mandatory pre-bid meetings and site walks are scheduled for December 2, 2025, at 1:30 p.m. and December 4, 2025, at 10:00 a.m., both at the Collin County Central Plant in McKinney, Texas. The bid submission deadline is December 18, 2025, at 2:00 p.m., with contract award anticipated within 90 calendar days of bid opening. The successful contractor shall furnish performance, payment, and two-year maintenance bonds within ten calendar days of award.

The estimated probable construction cost for the project is $1,100,000.00. Bidders must provide 5% bid security and comply with prevailing wage requirements, federal E-Verify and immigration verification, debarment certification, and conflict of interest disclosure. The contract requires comprehensive insurance coverage including workers' compensation, commercial general liability, automobile liability, and umbrella liability. The successful bidder must provide all labor, materials, equipment, permitting, disposal, and documentation necessary for project completion, including regulatory compliance with EPA, OSHA, DEP, and Florida Department of Health requirements. Liquidated damages of $500 per calendar day apply for failure to meet the completion schedule. The contract includes a one-year warranty for mechanical systems and two to five years for electrical equipment and generators from substantial completion. No specific set-aside designations for disadvantaged enterprises are mentioned in the procurement documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Carpenter Shop and Gas Storage

Water Department Admin/Water Department Storage