This is a Sealed Bid Invitation (IFB #2026-063) issued by Collin County, Texas, for a generator replacement project at the Collin County Adult Detention Facility (CCADF) Lower B. The project scope encompasses comprehensive mechanical and electrical work including disconnection and removal of the existing generator, installation and connection of a new diesel generator, and full-load testing upon completion. Two mandatory pre-bid meetings and site walks are scheduled for December 2, 2025, at 1:30 p.m. and December 4, 2025, at 10:00 a.m., both at the Collin County Central Plant in McKinney, Texas; prospective bidders must attend one meeting to receive electrical and mechanical drawings, which are available only upon execution of a Non-Disclosure Agreement. The bid submission deadline is December 18, 2025, at 2:00 p.m., with bid opening occurring the same day. The anticipated contract award will be made within 90 calendar days after bid opening. Upon substantial completion, the successful contractor must provide operation and maintenance manuals and maintain comprehensive project documentation throughout the contract term.

The estimated probable construction cost is $1,100,000.00, with bidders required to provide 5% bid security and comply with prevailing wage requirements. The successful contractor must furnish performance, payment, and two-year maintenance bonds within ten calendar days of contract award. Acceptable generator manufacturers are limited to Onan/Cummins and Kohler, with specifications requiring continuous duty rating, automatic transfer capabilities, and comprehensive monitoring and control systems. The contract includes a one-year warranty for mechanical systems and two to five years for electrical equipment and generators from the date of substantial completion. Liquidated damages of $500 per calendar day will be assessed for failure to meet the completion schedule. Bidders must comply with federal and state requirements including E-Verify, immigration verification, debarment certification, and conflict of interest disclosure. Required insurance coverage includes workers' compensation, commercial general liability, automobile liability, and umbrella liability. No specific set-aside designations for disadvantaged enterprises are mentioned in the procurement documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HENDRIXBD

Callout Carpenter Shop and Gas Storage

HENDRIXBD

Text Box Warehouse

HENDRIXBD

Callout Electric Operation Offices

HENDRIXBD

Callout Water Department Admin

HENDRIXBD

Callout Waste Water Warehouse

HENDRIXBD

Callout Waste Water Admin

HENDRIXBD

Callout Field Services

HENDRIXBD

Callout Water Department Storage

DRUMMONDAG

Text Box Mobile Building

DRUMMONDAG

Text Box Transformer Shop and Shed