Carman Park Roofing Project - Addendum 1.docx
DOCX document 16 KB Posted
- Attached to
- Carman Park Roof Replacement
- Solicitation number
- RFP GIS 190000002312 3
- Issued by
- Genesee County, Fife Lake Village, Michigan
About this file
This is an Addendum No. 1 to the bidding documents for the Carman Park Building Roof Replacement project issued by TMP Architecture for Genesee Intermediate School District (G.I.S.D.) on May 2, 2019. The project involves roof replacement work at Carman Park Building, with a revised completion date of October 10, 2019. The addendum references a pre-bid meeting scheduled for May 24, 2019, and includes supplementary conditions, prevailing wage rate information for Genesee County, and an SDA field observation report. Drawing AC1.2 was reissued to reflect roof plan notes and roof area descriptions based on roof core sample analysis, as well as notation of existing HVAC units that require height adjustments.
The project is subject to Davis-Bacon Act (DBRA) prevailing wage rate requirements applicable to Genesee County. The addendum adds new paragraph 19.8 to the Supplementary Conditions section and modifies the Bid Proposal Form with the updated time of completion. Documentation of pre-bid meeting attendance is required as part of the bidding information available to prospective bidders. The supplementary conditions and prevailing wage rate schedules were included as attachments to establish compliance requirements and wage standards for all work performed on the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 - Carman Park Roofing Project.pdf | ||
| ADVERTISEMENT FOR BID-Carman Park Roof Replacement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TMP
Architecture DATE: May 2, 2019
PROJECT: G.I.S.D. - Carman Park Building Roof Replacement
TMP PROJECT NO.: 19025
ADDENDUM NO.: One (1)
The Bidding Documents are modified, supplemented or augmented as follows and this Addendum is hereby made a part of the proposed Contract Documents.
| The following Drawings and attachments are issued with this Addendum. Drawings: | AC1.2 | |
| Attachments: | Supplementary Conditions, Prevailing Wage Rate, SDA Field Observation, Pre-Bid Meeting Attendance ITEM NO. | SPECIFICATION CHANGES |
| SC-1 | Refer to Section TC - TABLE OF CONTENTS (not reissued), PREVAILING WAGE RATE FOR GENESEE COUNTY(new), SDA FIELD OBSERVATION (new), and PRE-BID MEETING AGENDA (new): |
A. Refer to BID REQUIREMENTS and added to the Table of Contents.: “Prevailing Wage Rate for Genesee County” B. Refer to INFORMATION AVALABLE TO BIDDERS and added to the Table of Contents:
“SDA Field Observation 5-24-19 Pre-Bid Meeting Attendance”
SC-2 Refer to Section 001113 – ADVERTISEMENT FOR BIDS (not reissued):
A. Added new paragraph:
“This project is to comply with the requirements of the Davis-Bacon Act (DBRA) Prevailing Wage Rates.”
SC-3 Refer to Section 008050 – SUPPLEMENTARY CONDITIONS (reissued):
| A. | Added paragraph 19.8 in its entirety. SC-4 | Refer to Bid Proposal Form (not reissued): |
| A. | Revised TIME OF COMPLETION to October 10, 2019. |
o:\2019\19025\specs\addenda\add01\19025 addendum no. one (1).doc.
Genesee Career Institute (GCI) Roof Replacement Addendum No. One (1) TMP Project No. 19024 Page 2
ITEM NO. ARCHITECTURAL DRAWING CHANGES
AD-1 Refer to Drawing No. AC1.2 (reissued):
A. Added Roof Plan Notes #8 and #9.
B. Added roof areas and a description of each of the area’s roof systems observed from roof core samples.
C. Showed existing HVAC units that will have to be raised a few inches (field verify height). **END OF ADDENDUM NO. 1**
File details come from the government source that posted it. Updated .