SAC - Poured in Place PWS - Amendment 1.pdf

PDF 145 KB Posted

Attached to
SAC Playground Surfacing Background
Solicitation number
CANNF60058
Issued by

About this file

This is a Statement of Work (SOW) for the installation of a school-age playground surfacing system at Cannon Air Force Base, New Mexico. The contractor must provide, deliver, and install new poured-in-place surfacing at Building 1434, School Age Program, located at 334 D.L. Ingram Avenue, Cannon AFB, NM 88101. The work involves removing existing tan surfacing and installing new poured-in-place surfacing that meets all applicable safety and accessibility standards.

The playground surfacing system must comply with CPSC, ASTM, ADA, and UFC 4-740-14 requirements. The surfacing must provide adequate fall protection for equipment serving children ages 5-12 and support ADA accessibility standards. The contractor is responsible for site preparation, removal of old equipment, installation of the new surfacing system to manufacturer specifications, and daily cleanup leaving the site clean and debris-free. The contractor must complete all work within the performance period established in the contract and comply with base access and safety requirements during standard workdays. A Quality Assurance Surveillance Plan (QASP) will be used to evaluate contractor performance. The contractor must respond to warranty claims within 72 hours and complete corrective actions within 5 business days; failure to respond within these timeframes will result in the government declaring the contractor non-responsive and charging all corrective costs back to the contractor. A general space use plan is referenced and available via a provided hyperlink.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

INSTALLATION OF SCHOOL AGE PLAYGROUND

CANNON AFB NM

1. INTRODUCTION: Cannon AFB is seeking a contractor to provide, deliver, and install new poured-in-place surfacing located at Bldg. 1434, School Age Program, 334 D.L. Ingram Ave., Cannon AFB, NM 88101. Requirements will consist of new poured-in-place over old tan surfacing on the playground. The contractor shall provide a fully compliant, safe, and durable playground surfacing system meeting all applicable safety and accessibility standards.

2. PERFORMANCE PERIOD: The contractor shall complete all required outcomes within the performance period established in the contract.

3. GENERAL SCOPE OF WORK: the contractor shall ensure the playground surfacing meets all CPSC, ASTM, ADA, and UFC 4-740-14 requirements.

4. GOVERNMENT OVERSIGHT: The Government will evaluate contractor performance in accordance with the with the Quality Assurance Surveillance Plan (QASP).

5. DESIGN REQUIREMENTS: Materials shall be durable, maintainable, and compliant with all applicable codes.

6. QUALITY OF WORK: All deliverables shall be complete, accurate, and sufficient to support installation and compliance verification.

7. REMOVAL OF OLD EQUIPMENT: The contractor shall ensure the site is cleared of existing surfacing and prepared for installation in accordance with applicable standards.

8. DETAILED PLAYGROUND REQUIREMENTS

• Surfacing shall provide adequate fall protection for equipment serving children ages 5-

12.

• The design shall support ADA accessibility.

9. INSTALLATION OF PLAY STRUCTURE: Installation shall result in a complete, safe, and fully functional surfacing system meeting manufacturer specifications and all applicable standards.

10. STANDARD WORKDAY/WEEK: Contractor work hours shall comply with base access and safety requirements.

11. CLEANUP: The contractor shall leave the site clean, safe, and free of debris at the end of each workday and upon project completion.

11.1 WARRANTY. Contractor shall provide warranty claims within 72 hours and complete corrective actions within 5 business days. If the contractor fails to respond within the time frame indicated above, the government shall declare the contractor non-responsive and shall take all actions necessary to correct the problem with government resources. All costs incurred as a result of the government taking this action, shall be properly accounted for and charged back to the contractor.

12. AREA: Below is a general space use plan.

https://usaf.dps.mil/teams/ktfs1/app/index.aspx#!/contracts/54/1294290

File details come from the government source that posted it. Updated .