| File | Type | Posted |
|---|---|---|
| Presolicitation Notice (RFP).pdf | ||
| Presolicitation Notice (RFP).pdf | ||
| UFGS_09_90_00_Paints_and_Coatings_Base Facility Standards.pdf | ||
| 01 02 20_Base Facility Standards (Environmental).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base BASE PAINT IDIQ BASIC YEAR: 01 April 2020- 31 March 2021
| LINE | ITEM | UNIT OF | QUANTITY |
| NO. | ISSUE | ||
| INTERIOR PAINTING | |||
| 0001 | Prepare wall surface for painting up to 12' H | SF | 10,000 |
| 0002 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 10,000 |
| 0004 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 10,000 |
| 0006 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 10,000 |
| 0008 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 2,500 |
| 0010 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 1,000 |
| 0012 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 2,500 |
| 0014 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 2,500 |
| 0016 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 |
| INTERIOR FINISHES | |||
| 0018 | Spray Texture on walls (knock-down or orange peel) | SF | 1,000 |
| 0019 | Skim Coat Walls | SF | 1,000 |
| 0020 | Drywall Overlay | SF | 1,000 |
| 0021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 |
| 0022 | Remove and install new vinyl cove base | LF | 5,000 |
| 0023 | Repair drywall taped joint up to 12' H. | LF | 2,000 |
| 0024 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| DOORS AND FRAMES | |||
| 0025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0027 | Prepare door frame and trim ONLY for paint both sides. | EA | 10 |
| 0028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 10 |
| 0029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 10 |
| 0030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 20 |
| 0031 | Prepare roll-up door for paint icluding frame and trim. | SF | 1,500 |
| 0032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 1,500 |
| 0033 | Prepare large sliding metal door for paint. | SF | 500 |
| 0034 | Spot prime large metal door. | SF | 200 |
| 0035 | Apply two (2) coats of paint to large metal door. | SF | 500 |
| EXTERIOR PAINTING/COATINGS | |||
| 0036 | Prepare exterior wood wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 50,000 |
| 0037 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0038 | Remove loose and flaking paint on wood wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 50,000 |
| 0039 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0040 | Apply one (1) prime coat to exterior wood wall surfaces up to 12' H | SF | 50,000 |
| 0041 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0042 | Apply two (2) coats of paint on all exterior wood wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 50,000 |
| 0043 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0044 | Prepare exterior stucco, concrete and CMU wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0045 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0046 | Remove loose and flaking paint on stucco, concrete and CMU wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0047 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0048 | Apply one (1) prime coat to exterior stucco, concrete and CMU wall surfaces up to 12' H | SF | 250,000 |
| 0049 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0050 | Apply two (2) coats of paint to all exterior stucco, concrete and CMU walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 250,000 |
| 0051 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0052 | Prepare exterior metal wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0053 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0054 | Remove loose and flaking paint on metal wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0055 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0056 | Apply one (1) prime coat to exterior metal wall surfaces up to 12' H | SF | 100,000 |
| 0057 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0058 | Apply two (2) coats of paint to all exterior metal walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 100,000 |
| 0059 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0060 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 50,000 |
| 0061 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 5,000 |
| 0062 | Apply one (1) prime coat to metal roof surfaces. | SF | 50,000 |
| 0063 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 50,000 |
| 0064 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 10,000 |
| 0065 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0066 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 |
| 0067 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0068 | Apply Tex-Cote Finish to Exterior of Facility up to 12' H. | SF | 5,000 |
| 0069 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0070 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 1,000 |
| 0071 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0072 | Prime window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0073 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0074 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0075 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 |
| 0077 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| 0078 | Prepare fascia/trim for painting up to 12' H. | LF | 500 |
| 0079 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0080 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 |
| 0081 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0082 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 |
| 0083 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0084 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 |
| 0085 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| MISCELLANEOUS | |||
| 0086 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 100,000 |
| 0087 | for work above 12' H (RSMeans +25% for equipment) | SF | 50,000 |
| 0088 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0089 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0090 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 1,000 |
| 0091 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0092 | Apply one (1) prime coat to pipes up to 12' H. | SF | 1,000 |
| 0093 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0094 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0095 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0096 | Stairs -Prepare for paint - per floor | EA | 5 |
| 0097 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 |
| 0098 | Apply one (1) prime coat to stairs. | EA | 5 |
| 0099 | Stairs -Apply 2 coats of paint - per floor | EA | 5 |
| 0100 | Remove mold/meldew on walls, ceilings, etc. for work up to 12' H. | SF | 1,000 |
| 0101 | Remove mold/meldew on walls, ceilings, etc. for work over 12' H. | SF | 1,000 |
| EXTREIOR REPAIR | |||
| 0102 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 |
| 0103 | for work over 12' H | 1,000 | |
| 0104 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 1,000 |
| 0105 | for work over 12' H | 1,000 | |
| 0106 | Replace damaged metal gutters to match existing (material and finish) | LF | 1,500 |
| 0107 | Replace damaged metal downspouts to match existing (materials and finish) | LF | 1,500 |
| 0108 | Replace damaged and rotted wood fascia/trim, and apply one (1) primer coat and one (1) finish coat of paint to fascia/trim | LF | 2,500 |
| 0109 | Replace damaged or rotted wood soffits, and apply one (1) primer coat and one (1) finish coats of paint | SF | 2,500 |
| 0110 | Repair cracked of missing stucco prior to painting | SF | 1,500 |
| 0111 | Replace rusted metal wall panels prior to painting | SF | 1,500 |
| FLOORING | |||
| 0112 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 |
| 0113 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 |
| 0114 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 |
| 0115 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 |
| 0116 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 |
| 0117 | Prepare Concrete floor, stain and seal | SF | 100 |
| LEAD BASE PAINT ABATEMENT | |||
| 0118 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 |
| 0119 | for work above 12' H | SF | 1,000 |
| 0120 | Doors, One side include frame | SF | 500 |
| 0121 | Door frame only, One side | LF | 250 |
| 0122 | Exterior walls up to 12' H. | SF | 2,500 |
| 0123 | for work above 12' H | SF | 2,500 |
| 0124 | Window frame up to 12' H. (per sf of window) | SF | 1,000 |
| 0125 | for work above 12' H | SF | 500 |
| 0126 | Grilles, one side | SF | 100 |
| 0127 | Trusses open (Cross Section area) | SF-Face | 500 |
| 0128 | Pipes - (average price 1" to 16") | LF | 500 |
| 0129 | for work above 12' H | LF | 500 |
| 0130 | Stairs - per story | EA | 10 |
| 0131 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 |
| ABATEMENT MISC | |||
| 0132 | Encapsulate walls or other flat surfaces | SF | 5,000 |
| 0133 | above 12' height | SF | 5,000 |
| 0134 | Encapsulate trim or other complex surfaces | SF | 5,000 |
| 0135 | above 12' height | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Option I BASE PAINT IDIQ OPTION YR 1: 01 April 2021- 31 March 2022
| LINE | ITEM | UNIT OF | QUANTITY |
| NO. | ISSUE | ||
| INTERIOR PAINTING | |||
| 0001 | Prepare wall surface for painting up to 12' H | SF | 10,000 |
| 0002 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 10,000 |
| 0004 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 10,000 |
| 0006 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 10,000 |
| 0008 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 2,500 |
| 0010 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 1,000 |
| 0012 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 2,500 |
| 0014 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 2,500 |
| 0016 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 |
| INTERIOR FINISHES | |||
| 0018 | Spray Texture on walls (knock-down or orange peel) | SF | 1,000 |
| 0019 | Skim Coat Walls | SF | 1,000 |
| 0020 | Drywall Overlay | SF | 1,000 |
| 0021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 |
| 0022 | Remove and install new vinyl cove base | LF | 5,000 |
| 0023 | Repair drywall taped joint up to 12' H. | LF | 2,000 |
| 0024 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| DOORS AND FRAMES | |||
| 0025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0027 | Prepare door frame and trim ONLY for paint both sides. | EA | 10 |
| 0028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 10 |
| 0029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 10 |
| 0030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 20 |
| 0031 | Prepare roll-up door for paint icluding frame and trim. | SF | 1,500 |
| 0032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 1,500 |
| 0033 | Prepare large sliding metal door for paint. | SF | 500 |
| 0034 | Spot prime large metal door. | SF | 200 |
| 0035 | Apply two (2) coats of paint to large metal door. | SF | 500 |
| EXTERIOR PAINTING/COATINGS | |||
| 0036 | Prepare exterior wood wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 50,000 |
| 0037 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0038 | Remove loose and flaking paint on wood wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 50,000 |
| 0039 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0040 | Apply one (1) prime coat to exterior wood wall surfaces up to 12' H | SF | 50,000 |
| 0041 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0042 | Apply two (2) coats of paint on all exterior wood wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 50,000 |
| 0043 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0044 | Prepare exterior stucco, concrete and CMU wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0045 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0046 | Remove loose and flaking paint on stucco, concrete and CMU wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0047 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0048 | Apply one (1) prime coat to exterior stucco, concrete and CMU wall surfaces up to 12' H | SF | 250,000 |
| 0049 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0050 | Apply two (2) coats of paint to all exterior stucco, concrete and CMU walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 250,000 |
| 0051 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0052 | Prepare exterior metal wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0053 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0054 | Remove loose and flaking paint on metal wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0055 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0056 | Apply one (1) prime coat to exterior metal wall surfaces up to 12' H | SF | 100,000 |
| 0057 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0058 | Apply two (2) coats of paint to all exterior metal walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 100,000 |
| 0059 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0060 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 50,000 |
| 0061 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 5,000 |
| 0062 | Apply one (1) prime coat to metal roof surfaces. | SF | 50,000 |
| 0063 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 50,000 |
| 0064 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 10,000 |
| 0065 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0066 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 |
| 0067 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0068 | Apply Tex-Cote Finish to Exterior of Facility up to 12' H. | SF | 5,000 |
| 0069 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0070 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 1,000 |
| 0071 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0072 | Prime window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0073 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0074 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0075 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 |
| 0077 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| 0078 | Prepare fascia/trim for painting up to 12' H. | LF | 500 |
| 0079 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0080 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 |
| 0081 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0082 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 |
| 0083 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0084 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 |
| 0085 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| MISCELLANEOUS | |||
| 0086 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 100,000 |
| 0087 | for work above 12' H (RSMeans +25% for equipment) | SF | 50,000 |
| 0088 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0089 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0090 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 1,000 |
| 0091 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0092 | Apply one (1) prime coat to pipes up to 12' H. | SF | 1,000 |
| 0093 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0094 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0095 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0096 | Stairs -Prepare for paint - per floor | EA | 5 |
| 0097 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 |
| 0098 | Apply one (1) prime coat to stairs. | EA | 5 |
| 0099 | Stairs -Apply 2 coats of paint - per floor | EA | 5 |
| 0100 | Remove mold/meldew on walls, ceilings, etc. for work up to 12' H. | SF | 1,000 |
| 0101 | Remove mold/meldew on walls, ceilings, etc. for work over 12' H. | SF | 1,000 |
| EXTREIOR REPAIR | |||
| 0102 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 |
| 0103 | for work over 12' H | 1,000 | |
| 0104 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 1,000 |
| 0105 | for work over 12' H | 1,000 | |
| 0106 | Replace damaged metal gutters to match existing (material and finish) | LF | 1,500 |
| 0107 | Replace damaged metal downspouts to match existing (materials and finish) | LF | 1,500 |
| 0108 | Replace damaged and rotted wood fascia/trim, and apply one (1) primer coat and one (1) finish coat of paint to fascia/trim | LF | 2,500 |
| 0109 | Replace damaged or rotted wood soffits, and apply one (1) primer coat and one (1) finish coats of paint | SF | 2,500 |
| 0110 | Repair cracked of missing stucco prior to painting | SF | 1,500 |
| 0111 | Replace rusted metal wall panels prior to painting | SF | 1,500 |
| FLOORING | |||
| 0112 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 |
| 0113 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 |
| 0114 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 |
| 0115 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 |
| 0116 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 |
| 0117 | Prepare Concrete floor, stain and seal | SF | 100 |
| LEAD BASE PAINT ABATEMENT | |||
| 0118 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 |
| 0119 | for work above 12' H | SF | 1,000 |
| 0120 | Doors, One side include frame | SF | 500 |
| 0121 | Door frame only, One side | LF | 250 |
| 0122 | Exterior walls up to 12' H. | SF | 2,500 |
| 0123 | for work above 12' H | SF | 2,500 |
| 0124 | Window frame up to 12' H. (per sf of window) | SF | 1,000 |
| 0125 | for work above 12' H | SF | 500 |
| 0126 | Grilles, one side | SF | 100 |
| 0127 | Trusses open (Cross Section area) | SF-Face | 500 |
| 0128 | Pipes - (average price 1" to 16") | LF | 500 |
| 0129 | for work above 12' H | LF | 500 |
| 0130 | Stairs - per story | EA | 10 |
| 0131 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 |
| ABATEMENT MISC | |||
| 0132 | Encapsulate walls or other flat surfaces | SF | 5,000 |
| 0133 | above 12' height | SF | 5,000 |
| 0134 | Encapsulate trim or other complex surfaces | SF | 5,000 |
| 0135 | above 12' height | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Option II BASE PAINT IDIQ OPTION YR 2: 01 April 2022- 31 March 2023
| LINE | ITEM | UNIT OF | QUANTITY |
| NO. | ISSUE | ||
| INTERIOR PAINTING | |||
| 0001 | Prepare wall surface for painting up to 12' H | SF | 10,000 |
| 0002 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 10,000 |
| 0004 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 10,000 |
| 0006 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 10,000 |
| 0008 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 2,500 |
| 0010 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 1,000 |
| 0012 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 2,500 |
| 0014 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 2,500 |
| 0016 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 |
| INTERIOR FINISHES | |||
| 0018 | Spray Texture on walls (knock-down or orange peel) | SF | 1,000 |
| 0019 | Skim Coat Walls | SF | 1,000 |
| 0020 | Drywall Overlay | SF | 1,000 |
| 0021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 |
| 0022 | Remove and install new vinyl cove base | LF | 5,000 |
| 0023 | Repair drywall taped joint up to 12' H. | LF | 2,000 |
| 0024 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| DOORS AND FRAMES | |||
| 0025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0027 | Prepare door frame and trim ONLY for paint both sides. | EA | 10 |
| 0028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 10 |
| 0029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 10 |
| 0030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 20 |
| 0031 | Prepare roll-up door for paint icluding frame and trim. | SF | 1,500 |
| 0032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 1,500 |
| 0033 | Prepare large sliding metal door for paint. | SF | 500 |
| 0034 | Spot prime large metal door. | SF | 200 |
| 0035 | Apply two (2) coats of paint to large metal door. | SF | 500 |
| EXTERIOR PAINTING/COATINGS | |||
| 0036 | Prepare exterior wood wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 50,000 |
| 0037 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0038 | Remove loose and flaking paint on wood wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 50,000 |
| 0039 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0040 | Apply one (1) prime coat to exterior wood wall surfaces up to 12' H | SF | 50,000 |
| 0041 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0042 | Apply two (2) coats of paint on all exterior wood wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 50,000 |
| 0043 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0044 | Prepare exterior stucco, concrete and CMU wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0045 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0046 | Remove loose and flaking paint on stucco, concrete and CMU wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0047 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0048 | Apply one (1) prime coat to exterior stucco, concrete and CMU wall surfaces up to 12' H | SF | 250,000 |
| 0049 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0050 | Apply two (2) coats of paint to all exterior stucco, concrete and CMU walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 250,000 |
| 0051 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0052 | Prepare exterior metal wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0053 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0054 | Remove loose and flaking paint on metal wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0055 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0056 | Apply one (1) prime coat to exterior metal wall surfaces up to 12' H | SF | 100,000 |
| 0057 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0058 | Apply two (2) coats of paint to all exterior metal walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 100,000 |
| 0059 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0060 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 50,000 |
| 0061 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 5,000 |
| 0062 | Apply one (1) prime coat to metal roof surfaces. | SF | 50,000 |
| 0063 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 50,000 |
| 0064 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 10,000 |
| 0065 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0066 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 |
| 0067 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0070 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 1,000 |
| 0071 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0072 | Prime window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0073 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0074 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0075 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0076 | Prepare and apply two (2) finish coats of paint to gutters and downspouts up to 12' H. | LF | 1,000 |
| 0077 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| 0078 | Prepare fascia/trim for painting up to 12' H. | LF | 500 |
| 0079 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0080 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 |
| 0081 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0082 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 |
| 0083 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0084 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 |
| 0085 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| MISCELLANEOUS | |||
| 0086 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 100,000 |
| 0087 | for work above 12' H (RSMeans +25% for equipment) | SF | 50,000 |
| 0088 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0089 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0090 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 1,000 |
| 0091 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0092 | Apply one (1) prime coat to pipes up to 12' H. | SF | 1,000 |
| 0093 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0094 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0095 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0096 | Stairs -Prepare for paint - per floor | EA | 5 |
| 0097 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 |
| 0098 | Apply one (1) prime coat to stairs. | EA | 5 |
| 0099 | Stairs -Apply 2 coats of paint - per floor | EA | 5 |
| EXTREIOR REPAIR | |||
| 0102 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 |
| 0103 | for work over 12' H | 1,000 | |
| 0104 | Patch exterior stucco to match existing surface for work up to 12' H. | SF | 1,000 |
| 0105 | for work over 12' H | 1,000 | |
| FLOORING | |||
| 0112 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 |
| 0113 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 |
| 0114 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 |
| 0115 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 |
| 0116 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 |
| 0117 | Prepare Concrete floor, stain and seal | SF | 100 |
| LEAD BASE PAINT ABATEMENT | |||
| 0118 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 |
| 0119 | for work above 12' H | SF | 1,000 |
| 0120 | Doors, One side include frame | SF | 500 |
| 0121 | Door frame only, One side | LF | 250 |
| 0122 | Exterior walls up to 12' H. | SF | 2,500 |
| 0123 | for work above 12' H | SF | 2,500 |
| 0124 | Window frame up to 12' H. (per sf of window) | SF | 1,000 |
| 0125 | for work above 12' H | SF | 500 |
| 0126 | Grilles, one side | SF | 100 |
| 0127 | Trusses open (Cross Section area) | SF-Face | 500 |
| 0128 | Pipes - (average price 1" to 16") | LF | 500 |
| 0129 | for work above 12' H | LF | 500 |
| 0130 | Stairs - per story | EA | 10 |
| 0131 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 |
| ABATEMENT MISC | |||
| 0132 | Encapsulate walls or other flat surfaces | SF | 5,000 |
| 0133 | above 12' height | SF | 5,000 |
| 0134 | Encapsulate trim or other complex surfaces | SF | 5,000 |
| 0135 | above 12' height | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Option III BASE PAINT IDIQ OPTION YR 3: 01 April 2023- 31 March 2024
| LINE | ITEM | UNIT OF | QUANTITY |
| NO. | ISSUE | ||
| INTERIOR PAINTING | |||
| 0001 | Prepare wall surface for painting up to 12' H | SF | 10,000 |
| 0002 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 10,000 |
| 0004 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 10,000 |
| 0006 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 10,000 |
| 0008 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 2,500 |
| 0010 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 1,000 |
| 0012 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 2,500 |
| 0014 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 2,500 |
| 0016 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 |
| INTERIOR FINISHES | |||
| 0018 | Spray Texture on walls (knock-down or orange peel) | SF | 1,000 |
| 0019 | Skim Coat Walls | SF | 1,000 |
| 0020 | Drywall Overlay | SF | 1,000 |
| 0021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 |
| 0022 | Remove and install new vinyl cove base | LF | 5,000 |
| 0023 | Repair drywall taped joint up to 12' H. | LF | 2,000 |
| 0024 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| DOORS AND FRAMES | |||
| 0025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0027 | Prepare door frame and trim ONLY for paint both sides. | EA | 10 |
| 0028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 10 |
| 0029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 10 |
| 0030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 20 |
| 0031 | Prepare roll-up door for paint icluding frame and trim. | SF | 1,500 |
| 0032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 1,500 |
| 0033 | Prepare large sliding metal door for paint. | SF | 500 |
| 0034 | Spot prime large metal door. | SF | 200 |
| 0035 | Apply two (2) coats of paint to large metal door. | SF | 500 |
| EXTERIOR PAINTING/COATINGS | |||
| 0036 | Prepare exterior wood wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 50,000 |
| 0037 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0038 | Remove loose and flaking paint on wood wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 50,000 |
| 0039 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0040 | Apply one (1) prime coat to exterior wood wall surfaces up to 12' H | SF | 50,000 |
| 0041 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0042 | Apply two (2) coats of paint on all exterior wood wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 50,000 |
| 0043 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0044 | Prepare exterior stucco, concrete and CMU wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0045 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0046 | Remove loose and flaking paint on stucco, concrete and CMU wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0047 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0048 | Apply one (1) prime coat to exterior stucco, concrete and CMU wall surfaces up to 12' H | SF | 250,000 |
| 0049 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0050 | Apply two (2) coats of paint to all exterior stucco, concrete and CMU walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 250,000 |
| 0051 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0052 | Prepare exterior metal wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0053 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0054 | Remove loose and flaking paint on metal wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0055 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0056 | Apply one (1) prime coat to exterior metal wall surfaces up to 12' H | SF | 100,000 |
| 0057 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0058 | Apply two (2) coats of paint to all exterior metal walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 100,000 |
| 0059 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0060 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 50,000 |
| 0061 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 5,000 |
| 0062 | Apply one (1) prime coat to metal roof surfaces. | SF | 50,000 |
| 0063 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 50,000 |
| 0064 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 10,000 |
| 0065 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0066 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 |
| 0067 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0068 | Apply Tex-Cote Finish to Exterior of Facility up to 12' H. | SF | 5,000 |
| 0069 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0070 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 1,000 |
| 0071 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0072 | Prime window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0073 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0074 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0075 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 |
| 0077 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| 0078 | Prepare fascia/trim for painting up to 12' H. | LF | 500 |
| 0079 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0080 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 |
| 0081 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0082 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 |
| 0083 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0084 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 |
| 0085 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| MISCELLANEOUS | |||
| 0086 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 100,000 |
| 0087 | for work above 12' H (RSMeans +25% for equipment) | SF | 50,000 |
| 0088 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0089 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0090 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 1,000 |
| 0091 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0092 | Apply one (1) prime coat to pipes up to 12' H. | SF | 1,000 |
| 0093 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0094 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0095 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0096 | Stairs -Prepare for paint - per floor | EA | 5 |
| 0097 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 |
| 0098 | Apply one (1) prime coat to stairs. | EA | 5 |
| 0099 | Stairs -Apply 2 coats of paint - per floor | EA | 5 |
| 0100 | Remove mold/meldew on walls, ceilings, etc. for work up to 12' H. | SF | 1,000 |
| 0101 | Remove mold/meldew on walls, ceilings, etc. for work over 12' H. | SF | 1,000 |
| EXTREIOR REPAIR | |||
| 0102 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 |
| 0103 | for work over 12' H | 1,000 | |
| 0104 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 1,000 |
| 0105 | for work over 12' H | 1,000 | |
| 0106 | Replace damaged metal gutters to match existing (material and finish) | LF | 1,500 |
| 0107 | Replace damaged metal downspouts to match existing (materials and finish) | LF | 1,500 |
| 0108 | Replace damaged and rotted wood fascia/trim, and apply one (1) primer coat and one (1) finish coat of paint to fascia/trim | LF | 2,500 |
| 0109 | Replace damaged or rotted wood soffits, and apply one (1) primer coat and one (1) finish coats of paint | SF | 2,500 |
| 0110 | Repair cracked of missing stucco prior to painting | SF | 1,500 |
| 0111 | Replace rusted metal wall panels prior to painting | SF | 1,500 |
| FLOORING | |||
| 0112 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 |
| 0113 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 |
| 0114 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 |
| 0115 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 |
| 0116 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 |
| 0117 | Prepare Concrete floor, stain and seal | SF | 100 |
| LEAD BASE PAINT ABATEMENT | |||
| 0118 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 |
| 0119 | for work above 12' H | SF | 1,000 |
| 0120 | Doors, One side include frame | SF | 500 |
| 0121 | Door frame only, One side | LF | 250 |
| 0122 | Exterior walls up to 12' H. | SF | 2,500 |
| 0123 | for work above 12' H | SF | 2,500 |
| 0124 | Window frame up to 12' H. (per sf of window) | SF | 1,000 |
| 0125 | for work above 12' H | SF | 500 |
| 0126 | Grilles, one side | SF | 100 |
| 0127 | Trusses open (Cross Section area) | SF-Face | 500 |
| 0128 | Pipes - (average price 1" to 16") | LF | 500 |
| 0129 | for work above 12' H | LF | 500 |
| 0130 | Stairs - per story | EA | 10 |
| 0131 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 |
| ABATEMENT MISC | |||
| 0132 | Encapsulate walls or other flat surfaces | SF | 5,000 |
| 0133 | above 12' height | SF | 5,000 |
| 0134 | Encapsulate trim or other complex surfaces | SF | 5,000 |
| 0135 | above 12' height | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Option IV BASE PAINT IDIQ OPTION YR 4: 01 April 2024- 31 March 2025
| LINE | ITEM | UNIT OF | QUANTITY |
| NO. | ISSUE | ||
| INTERIOR PAINTING | |||
| 0001 | Prepare wall surface for painting up to 12' H | SF | 10,000 |
| 0002 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 10,000 |
| 0004 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 10,000 |
| 0006 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 10,000 |
| 0008 | for work above 12' H (RSMeans +20% for equipment) | SF | 5,000 |
| 0009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 2,500 |
| 0010 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 1,000 |
| 0012 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 2,500 |
| 0014 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 2,500 |
| 0016 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,500 |
| 0017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 |
| INTERIOR FINISHES | |||
| 0018 | Spray Texture on walls (knock-down or orange peel) | SF | 1,000 |
| 0019 | Skim Coat Walls | SF | 1,000 |
| 0020 | Drywall Overlay | SF | 1,000 |
| 0021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 |
| 0022 | Remove and install new vinyl cove base | LF | 5,000 |
| 0023 | Repair drywall taped joint up to 12' H. | LF | 2,000 |
| 0024 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| DOORS AND FRAMES | |||
| 0025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 50 |
| 0027 | Prepare door frame and trim ONLY for paint both sides. | EA | 10 |
| 0028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 10 |
| 0029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 10 |
| 0030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 20 |
| 0031 | Prepare roll-up door for paint icluding frame and trim. | SF | 1,500 |
| 0032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 1,500 |
| 0033 | Prepare large sliding metal door for paint. | SF | 500 |
| 0034 | Spot prime large metal door. | SF | 200 |
| 0035 | Apply two (2) coats of paint to large metal door. | SF | 500 |
| EXTERIOR PAINTING/COATINGS | |||
| 0036 | Prepare exterior wood wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 50,000 |
| 0037 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0038 | Remove loose and flaking paint on wood wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 50,000 |
| 0039 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0040 | Apply one (1) prime coat to exterior wood wall surfaces up to 12' H | SF | 50,000 |
| 0041 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0042 | Apply two (2) coats of paint on all exterior wood wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 50,000 |
| 0043 | for work above 12' H (RSMeans +25% for equipment) | SF | 30,000 |
| 0044 | Prepare exterior stucco, concrete and CMU wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0045 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0046 | Remove loose and flaking paint on stucco, concrete and CMU wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0047 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0048 | Apply one (1) prime coat to exterior stucco, concrete and CMU wall surfaces up to 12' H | SF | 250,000 |
| 0049 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0050 | Apply two (2) coats of paint to all exterior stucco, concrete and CMU walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 250,000 |
| 0051 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0052 | Prepare exterior metal wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 250,000 |
| 0053 | for work above 12' H (RSMeans +25% for equipment) | SF | 100,000 |
| 0054 | Remove loose and flaking paint on metal wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 100,000 |
| 0055 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0056 | Apply one (1) prime coat to exterior metal wall surfaces up to 12' H | SF | 100,000 |
| 0057 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0058 | Apply two (2) coats of paint to all exterior metal walls surfaces including appurtenances as specified by the Government up to 12' H. | SF | 100,000 |
| 0059 | for work above 12' H (RSMeans +25% for equipment) | SF | 75,000 |
| 0060 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 50,000 |
| 0061 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 5,000 |
| 0062 | Apply one (1) prime coat to metal roof surfaces. | SF | 50,000 |
| 0063 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 50,000 |
| 0064 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 10,000 |
| 0065 | for work above 12' H (RSMeans +25% for equipment) | SF | 10,000 |
| 0066 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 |
| 0067 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0068 | Apply Tex-Cote Finish to Exterior of Facility up to 12' H. | SF | 5,000 |
| 0069 | for work above 12' H (RSMeans +25% for equipment) | SF | 5,000 |
| 0070 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 1,000 |
| 0071 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0072 | Prime window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0073 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0074 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 1,000 |
| 0075 | for work above 12' H (RSMeans +25% for equipment) | SF | 500 |
| 0076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 |
| 0077 | for work above 12' H (RSMeans +25% for equipment) | LF | 1,000 |
| 0078 | Prepare fascia/trim for painting up to 12' H. | LF | 500 |
| 0079 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0080 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 |
| 0081 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0082 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 |
| 0083 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| 0084 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 |
| 0085 | for work above 12' H (RSMeans +25% for equipment) | LF | 500 |
| MISCELLANEOUS | |||
| 0086 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 100,000 |
| 0087 | for work above 12' H (RSMeans +25% for equipment) | SF | 50,000 |
| 0088 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0089 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0090 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 1,000 |
| 0091 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0092 | Apply one (1) prime coat to pipes up to 12' H. | SF | 1,000 |
| 0093 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0094 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 1,000 |
| 0095 | for work above 12' H (RSMeans +25% for equipment) | SF | 1,000 |
| 0096 | Stairs -Prepare for paint - per floor | EA | 5 |
| 0097 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 |
| 0098 | Apply one (1) prime coat to stairs. | EA | 5 |
| 0099 | Stairs -Apply 2 coats of paint - per floor | EA | 5 |
| 0100 | Remove mold/meldew on walls, ceilings, etc. for work up to 12' H. | SF | 1,000 |
| 0101 | Remove mold/meldew on walls, ceilings, etc. for work over 12' H. | SF | 1,000 |
| EXTREIOR REPAIR |