Cable_Conductor_Wire_Supplementary_Conditions_4.6.26.pdf

PDF 1 MB Posted

Attached to
Annual Procurement of Wire & Cable
Solicitation number
RFP 2026-067
Issued by
Alachua County, Graceville City, Florida

About this file

This supplementary conditions document outlines contractual terms and requirements for Cable Conductor Wire suppliers under GRU's (Gainesville Regional Utilities) Annual Procurement of Wire & Cable in Florida. The document establishes the framework for a five-year contract designed to reduce total cost of ownership and generate supply chain efficiencies through cooperative efforts between GRU and selected suppliers. The contract allows for the procurement of one or more groups of wire and cable products as specified in the RFP, with the supplementary conditions modifying or clarifying the standard contract terms and conditions applicable to this procurement.

The supplementary conditions address specific contractual requirements, performance standards, and operational guidelines governing the supplier's obligations throughout the contract term. These conditions establish procedures for product delivery, quality assurance, compliance with specifications, and other material terms beyond the base contract language. The document ensures that selected suppliers meet GRU's operational and technical requirements while maintaining the cost efficiencies sought through this cooperative procurement strategy.

View the file

Other files

File Type Posted
Annual_Procurement_of_Wire_&_Cable_(Addendum_#7_Revision).pdf PDF
Annual_Procurement_of_Wire_&_Cable_(Addendum_#4_Revision).pdf PDF
Page_C-26.02_Cable_Conductor_Wire_Primary_Underground_EPR_Revised_5.19.26.pdf PDF
Page_C-26.00_Cable_Conductor_Wire_Primary_Underground_EPR_Technical_Specifications_5.5.26_revised.pdf PDF
Page_C-105.00_Cable_Conductor_Wire_Primary_Overhead_Aluminum_4.6.26.pdf PDF
Page_C-31.00_Cable_Conductor_Wire_Primary_Overhead_Aerial_Technical_Specifications_4.6.26.pdf PDF
Page_C-30.00_Cable_Conductor_Wire_Underground_Secondary_4.6.26.pdf PDF
Page_C-32.00_Cable_Conductor_Wire_Primary_Overhead_Aerial_4.6.26.pdf PDF
Page_C-9.00_-_C-9.03_Supplementary_Conditions.pdf PDF
Page_C-10.00_Cable_Conductor_Wire_Overhead_Secondary_4.6.26.pdf PDF
Page_C-103.00_Cable_Conductor_Wire_Primary_Overhead_Copper_4.6.26.pdf PDF
Page_C-20.00_Cable_Conductor_Wire_Primary_Underground_Copper_4.6.26.pdf PDF
Cable_Conductor_Wire_Primary_Overhead_Aluminum_4.6.26.pdf PDF
Cable_Conductor_Wire_Overhead_Secondary_4.6.26.pdf PDF
Cable_Conductor_Wire_Primary_Overhead_Aerial_4.6.26.pdf PDF
Cable_Conductor_Wire_Primary_Overhead_Aerial_Technical_Specifications_4.6.26.pdf PDF
Cable_Conductor_Wire_Primary_Underground_EPR_4.6.26.pdf PDF
Cable_Conductor_Wire_Primary_Overhead_Copper_4.6.26.pdf PDF
Cable_Conductor_Wire_Primary_Underground_Copper_4.6.26.pdf PDF
Cable_Conductor_Wire_Primary_Underground_EPR_Technical_Specifications_4.6.26.pdf PDF
Cable_Conductor_Wire_Underground_Secondary_4.6.26.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .