This document is an Invitation for Bid (IFB) for a roadway construction project located in Yosemite National Park, California. The project involves resurfacing, restoring, rehabilitating, and reconstructing approximately 10.6 miles of Glacier Point Road, as well as pavement preservation of 5.1 additional miles. Work includes widening switchbacks, constructing retaining walls, stabilizing subgrades, cleaning and replacing culverts, and rehabilitating multiple parking areas. Bids are due by October 19, 2021. The award is expected to be a fixed-price contract valued between $25-40 million to the lowest responsive, responsible bidder. The contract will be administered by the Federal Highway Administration Central Federal Lands Highway Division and work must be completed within the timeframe specified in the Special Contract Requirements. The IFB requires compliance with various federal acquisition regulations and wage rates, as well as performance and payment bonds.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids - Glacier Point Road.pdf | ||
| Bid Opening Summary Glacier Point - 10212021.doc | DOC document | |
| A004 CA YOSE 15(2) Glacier Point Road.pdf | ||
| Questions and Answers 10.18.2021 .docx | DOCX document | |
| A003 CA YOSE 15(2) Glacier Point Road.pdf | ||
| Interested Vendors List 10-14-2021.docx | DOCX document | |
| A002 - CA FNTP YOSE 15(2) Glacier Point Road.pdf | ||
| A002 CA FNTP YOSE 15(2) Glacier Point Road.pdf | ||
| Questions and Answers 10.13.2021 (2).docx | DOCX document | |
| Questions and Answers 10.13.2021.docx | DOCX document | |
| Interested Vendors List 10-12-2021.docx | DOCX document | |
| Interested Vendors 10-07-2021.docx | DOCX document | |
| Glacier Point_Cross Sections.pdf | ||
| Glacier Point Road Plans with schedule.options.pdf | ||
| FP-14.pdf | ||
| A001 CA FTNP YOSE 15(2) Glacier Point Road.pdf | ||
| CA FTNP YOSE 15(2) Glacier Point Rd - Final Pavement Report.pdf | ||
| YOSE15(2)_FinalHydMemo.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: 6982AF21B000032
SOLICITATION TYPE: FULL AND OPEN COMPETITION (UNRESTRICTED)
PROJECT NUMBER: CA FTNP YOSE 15(2)
PROJECT NAME: GLACIER POINT ROAD
BID OPENING DATE:
See Page A-1, Item 13A
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-14 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov https://highways.dot.gov/federal-lands mailto:CFLContracts@dot.gov
PROJECT CA FTNP YOSE 15(2)
LOCATION YOSEMITE NATIONAL PARK
COUNTY MARIPOSA
STATE CALIFORNIA
LENGTH SCHEDULE A: 1.8 MILES
OPTION X: 8.7 MILES
OPTION Y: 5.1 MILES
TYPE OF IMPROVEMENT ROADWAY RESURFACING,
RESTORATION, REHABILITATION, &
RECONSTRUCTION, WIDENING OF
SWITCHBACKS, CONSTRUCTION OF
RETAINING WALLS, SUBGRADE
STABILIZATION, CULVERT CLEANING &
REPLACEMENT, REHABILITATION AND
RECONSTRUCTION OF MULTIPLE
PARKING AREAS, REMOVAL &
FORMALIZATION OF ROADSIDE
PULLOUTS, TRAFFIC CONTROL,
VISITOR RELATIONS, WORK AT HIGH
ELEVATION, WORK IN CULTURAL &
NATURAL SENSTIVE AREAS, WORK
WITH ENVIRONMENTAL CONSTRAINTS
AFFECTING SCHEDULE & OPERATIONS
TABLE OF CONTENTS
Notice to Bidders ......................................................................................................... A-i
Solicitation, Offer, and Award ..................................................................................... A-1
Basis for Award and Bid Schedule ............................................................................. A-6
Solicitation Provisions................................................................................................. B-7
Contract Clauses ......................................................................................................... C-1
Construction Wage Rate Requirement ......................................................................... D-1
Division 100 ................................................................................................................E-1 Division 150 .............................................................................................................. E-34 Division 200 .............................................................................................................. E-50 Division 300 .............................................................................................................. E-62 Division 400 .............................................................................................................. E-65 Division 500 .............................................................................................................. E-90 Division 600 .............................................................................................................. E-91 Division 700 ............................................................................................................ E-113
APPENDICES
Appendix A.................................. Section 401 Water Quality Certification, June 19, 2020 Appendix B ................................................... Sample Small Business Subcontracting Plan
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
NOTICE TO BIDDERS
A-i
PROJECT OVERVIEW
CA FTNP YOSE 15(2) Glacier Point Road project is located in Mariposa County, CA within Yosemite National Park. This project will consist of roadway resurfacing, restoration, and rehabilitation, reconstruction of 10.6 miles of Glacier Point Road from Badger Pass to the Glacier Point Parking Area and pavement preservation of approximately 5.1 miles of Glacier Point Road from Chinquapin to Badger Pass within Yosemite National Park, Mariposa County, California. Work also includes reconstruction of the last 1.6 miles of the road approaching the Glacier Point Parking Area to widen the existing switchbacks to provide adequate roadway width for larger vehicles. Work also includes construction of 2 retaining walls, subgrade stabilization, drainage improvements including culvert cleaning and replacement, and rehabilitation/reconstruction of multiple parking areas including McGurk Meadow Trailhead, Sentinel Dome Trailhead, Washburn Point and Glacier Point. The existing roadway consists of aging and deteriorated pavement, failed drainage structures, and informal pullouts and roadside parking. Roadside pullouts will also be formalized or removed to improve safety.
The terrain is mountainous with the elevation for the work ranging between 6,000 and 7,800 feet.
Glacier Point Road is typically closed from Badger Pass to the Glacier Point Parking Area from November to May due to heavy winter/spring snowfall.
I. PRE-BID INFORMATION
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Submit the following documents with your Bid Package–
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2
• If applicable, indication of interest in formal Partnering, Page A-5
• Bid Schedule Pages A-6 through A-27
• Completed an applicable Authority to Bind certificate, pages A-28 through A-32
• Buy American Act & Hazardous Materials, Pages A-33 through A-34
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
o Digital copies may be downloaded at https://www.gsa.gov/forms-library/bid-bond
• Completed the VETS-4212 declaration, Page A-ii; Bidders’ Information, Pages B-3 through B-6.
• HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.
https://www.gsa.gov/forms-library/bid-bond
A-ii
Bidders should retain all other pages for their information. Bids should be submitted in a sealed envelope and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at https://sam.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
The FP-14 was utilized for the design of this project. Paper copies of the FP-14 will not be provided to bidders or the awarded Prime Contractor. The FP-14 is available electronically at https://flh.fhwa.dot.gov/resources/specs/ and a copy is uploaded with this solicitation. A single paper copy can be obtained from the Research & Technology Distribution Center (RTPDC) by email report.center@dot.gov.
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/browse/index/far.
Notice of SAM Registration – you must be registered in the System for Award Management (SAM) prior to submission of a bid in response to this solicitation. Failure to register prior to submission of a bid may require award to the next successful registered offeror. See FAR Subpart
4.1102. Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $39.5 million. If your average annual gross receipts for the past 5 years are above $39.5 million, you are a large business for this solicitation. If they are below $39.5 million you are a small business. Before submitting bids, you must ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov. Include NAICS 237310 in your SAM profile.
Vets-4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: https://www.dol.gov/agencies/vets/contractor/instructions-for-electronic-submission-vets-4212-reports.
• My firm had a qualifying Federal Contract in 2021 and has complied with the reporting requirements.
• My firm did not have a qualifying Federal Contract in 2021 and is therefore exempt from the reporting requirements https://sam.gov/ https://flh.fhwa.dot.gov/resources/specs/ mailto:report.center@dot.gov https://www.acquisition.gov/browse/index/far http://www.sam.gov/ http://www.sam.gov/
A-iii
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to the price of all offers except HUBZone small business concerns that have not waived the evaluation preference and otherwise successful offers from small business concerns. See FAR Clause 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.219-14, Limitations on Subcontracting will apply.
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-14. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
Accuracy and Completeness of Bid- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON OCTOBER 12, 2021
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov
Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360 https://sam.gov/
A-iv
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov
II. POST AWARD INFORMATION
CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1.5 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) https://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at https://www.sam.gov.
See Appendix B for Sample Small Business Subcontracting Plan.
NOTE:
• Consider the following FHWA small business goals in development of Subcontracting plans and efforts:
FHWA Small Business Subcontracting Goals (As of FY 2021) Business Size Goal (%)
SB 30.07%
SDB 5.0%
https://web.sba.gov/subnet/ https://www.sam.gov/
A-v
HUBZone 3.0%
WOSB 5.0%
SDVOSB 3.0%
Insurance requirements - See Subsection 107.05 of the FP-14.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.
The Contractor shall be required to submit a user account form to gain access to the EEBACS system.
See Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at https://highways.dot.gov/federal-lands/estimates/eebacs-guide https://highways.dot.gov/federal-lands/estimates/eebacs-guide
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
6982AF21B000032
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
9/21/2021
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
CA FTNP YOSE 15(2)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Josephine Helms, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 p.m. (hour) local time on 10/19/2021 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA
FAR (48 CFR) 53.236-1(d)
X
X
X
X
X
HFLCEO210458PR
A-2
STANDARD FORM 1442 (REV. 8/2014) BACK
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
□ 10 U.S.C. 2304(c)( ) □ 41 U.S.C. 3304(a)( )
26. ADMINISTERED BY CODE: 27. PAYMENT WILL BE MADE BY
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
A-3
Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.
Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov .
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee (Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-
14. All bid guarantees must have original signatures with original corporate seals.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE
DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY
RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to https://sam.gov.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-14.
ESTIMATED
PRICE: The price range of the project work is between $25 and $40 million.
mailto:CFLContracts@dot.gov https://sam.gov/
A-4
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule and two options.
Before preparing the bid, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.
Pay Item 15401-0000, Contractor testing
Bidders must provide prices on alternative Contractor Testing pay items for EACH SCHEDULE
Bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory for each schedule. The price for this item will be included in the Construction Cost Total for each schedule and all totals on the Bid Summary, page A-15, A-23 and A-27, therefore, included in the evaluation for award.
Bidders must also provide a stand-alone price on the last page of each schedule for the alternative item, Contractor Testing using a Government-furnished field laboratory, at the end of each bid schedule.
This price will not be factored into the evaluation for award.
The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
Basis for Award
To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A, Option X and Option Y. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available.
Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule A. Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 120 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).
A-5
Partnering
A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.
CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and its subcontractors to establish a Partnering relationship on this project.
A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.
Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-14. Costs of partnering would be in addition to the contract award amount.
Please indicate your desire to participate in a formal partnering meeting on this project.
(___) We would like to participate in a formal partnering meeting.
(___) We do not want to participate in a formal partnering meeting.
A - 6
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CA FTNP YOSE 15(2)
Project Name:Glacier Point Road
A - 7
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
2.196 MILE $____________ $____________
A0060 15214-2000 SURVEY AND STAKING, RETAINING WALL
ALL LPSM $___LPSM_____ $____________
A0080 15214-3000 SURVEY AND STAKING, PARKING AREA
ALL LPSM $___LPSM_____ $____________
A0100 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
13 EACH $____________ $____________
A0120 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
4.553 MILE $____________ $____________
A0140 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0160 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0180 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0200 15705-0100 SOIL EROSION CONTROL, SILT FENCE
920 LNFT $____________ $____________
A0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
6,000 LNFT $____________ $____________
A0240 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
30 EACH $____________ $____________
A0260 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
2 EACH $____________ $____________
A0280 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FTNP YOSE 15(2)
(Contractor-furnished Lab)
A - 8
A0300 20101-0000 CLEARING AND GRUBBING
5.5 ACRE $____________ $____________
A0320 20220-1000 REMOVAL, INDIVIDUAL TREE
13 EACH $____________ $____________
A0340 20301-0700 REMOVAL OF DELINEATOR
65 EACH $____________ $____________
A0360 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
A0380 20301-1400 REMOVAL OF INLET
2 EACH $____________ $____________
A0400 20301-1900 REMOVAL OF PIPE CULVERT
14 EACH $____________ $____________
A0420 20301-2100 REMOVAL OF RESTROOM FACILITY (VAULT TOILET)
1 EACH $____________ $____________
A0440 20301-2400 REMOVAL OF SIGN
23 EACH $____________ $____________
A0460 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
4,550 LNFT $____________ $____________
A0480 20302-0700 REMOVAL OF FENCE (SPLIT RAIL)
40 LNFT $____________ $____________
A0500 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
970 SQYD $____________ $____________
A0520 20401-0000 ROADWAY EXCAVATION (REINFORCED SOIL SLOPE)
19,300 CUYD $____________ $____________
A0540 20401-0000 ROADWAY EXCAVATION
10,600 CUYD $____________ $____________
A0560 20402-0000 SUBEXCAVATION
600 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0580 20441-0000 WASTE
4,500 CUYD $____________ $____________
A0600 20465-0000 CONSERVE AND PLACE BOULDER
25 EACH $____________ $____________
A0620 20720-0200 REINFORCEMENT GEOSYNTHETIC, TYPE 2
31,000 SQYD $____________ $____________
A0640 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT D)
100 SQYD $____________ $____________
A0660 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT B)
175 SQYD $____________ $____________
A0680 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
36.0 CUYD $____________ $____________
A0700 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
15.0 CUYD $____________ $____________
A0720 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
1,800 CUYD $____________ $____________
A0740 25205-1000 ROCK BUTTRESS, MECHANICALLY-PLACED
15 CUYD $____________ $____________
A0760 25210-0000 ROCKERY
5,900 SQFT $____________ $____________
A0780 30201-2000 ROADWAY AGGREGATE, METHOD 2 (RECYCLED ASPHALT)
4,062 CUYD $____________ $____________
A0800 30202-2000 ROADWAY AGGREGATE, METHOD 2
2,300.0 TON $____________ $____________
A0820 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
12,600 SQYD $____________ $____________
A0840 31303-0000 AGGREGATE-TOPSOIL COURSE
295 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0880 40101-0600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
6,700 TON $____________ $____________
A0900 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
65 TON $____________ $____________
A0940 40601-0000 FOG SEAL
17 TON $____________ $____________
A0960 41102-1000 PRIME COAT, METHOD 1
40,000 SQYD $____________ $____________
A0980 41105-0000 BLOTTER
440 TON $____________ $____________
A1000 41201-0000 TACK COAT
17 TON $____________ $____________
A1020 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH
750 SQYD $____________ $____________
A1040 60201-0600 18-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
90 LNFT $____________ $____________
A1060 60201-0800 24-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
190 LNFT $____________ $____________
A1080 60201-0900 30-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
35 LNFT $____________ $____________
A1100 60201-1000 36-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
175 LNFT $____________ $____________
A1120 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL, PIPE, POLYMERIC COATED)
105 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A1140 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL, PIPE, POLYMERIC COATED)
32 LNFT $____________ $____________
A1160 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT (POLYMERIC COATED)
2 EACH $____________ $____________
A1180 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED)
3 EACH $____________ $____________
A1200 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (POLYMERIC COATED)
2 EACH $____________ $____________
A1220 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT (POLYMERIC COATED)
3 EACH $____________ $____________
A1240 60403-0000 INLET (CALTRANS TYPE G1)
2 EACH $____________ $____________
A1260 60403-0000 INLET (CALTRANS TYPE G0)
4 EACH $____________ $____________
A1280 60404-1000 CATCH BASIN, FLH TYPE 1
1 EACH $____________ $____________
A1300 60409-0000 INLET TOP, METAL FRAME AND GRATE
6 EACH $____________ $____________
A1320 60502-0000 GEOCOMPOSITE UNDERDRAIN SYSTEM
90 LNFT $____________ $____________
A1340 60704-0000 CLEANING CULVERT IN PLACE
2 EACH $____________ $____________
A1360 60901-1200 CURB, CONCRETE, 14-INCH DEPTH
6,150 LNFT $____________ $____________
A1380 60902-1200 CURB AND GUTTER, CONCRETE, 14-INCH DEPTH
5,535 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A1400 60908-1000 PAVED DITCH, ASPHALT
1,450 SQYD $____________ $____________
A1420 61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE
1,400 SQYD $____________ $____________
A1440 61505-1000 ACCESSIBILITY RAMP, CONCRETE
5 EACH $____________ $____________
A1460 61509-0000 DETECTABLE WARNING PANELS
5 SQYD $____________ $____________
A1480 61901-2300 FENCE, SPLIT RAIL
820 LNFT $____________ $____________
A1500 61902-0900 GATE, METAL
1 EACH $____________ $____________
A1520 61921-1000 REMOVE AND RESET FENCE (SPLIT RAIL)
320 LNFT $____________ $____________
A1540 62002-0000 STONE MASONRY
2 SQYD $____________ $____________
A1560 62010-7000 STONE MASONRY PARAPET
290 LNFT $____________ $____________
A1580 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
2 EACH $____________ $____________
A1600 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT
2 EACH $____________ $____________
A1620 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT
5 EACH $____________ $____________
A1640 62011-1800 STONE MASONRY HEADWALL FOR DOUBLE 24-INCH PIPE CULVERT
3 EACH $____________ $____________
A1660 62013-2000 STONE MASONRY WALL
400 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
A1680 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL
1 EACH $____________ $____________
A1700 62030-0000 REPOINT STONE MASONRY
200 LNFT $____________ $____________
A1720 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A1740 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH
40 HOUR $____________ $____________
A1760 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A1780 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
A1800 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A1820 62301-0000 GENERAL LABOR
100 HOUR $____________ $____________
A1840 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
20 HOUR $____________ $____________
A1860 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
A1880 62407-0000 PLACING CONSERVED TOPSOIL
1,900 CUYD $____________ $____________
A1900 62510-2000 SEEDING, HYDRAULIC METHOD
6.0 ACRE $____________ $____________
A1920 62515-2000 MULCHING, HYDRAULIC METHOD
6.0 ACRE $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 14
A1940 62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B
4,405 SQYD $____________ $____________
A1960 63301-0000 SIGN SYSTEM
40 EACH $____________ $____________
A1980 63308-2000 OBJECT MARKER, TYPE 2
60 EACH $____________ $____________
A2000 63309-1000 DELINEATOR, TYPE SNOW POLE
119 EACH $____________ $____________
A2020 63316-1000 REMOVE AND RESET SIGN
5 EACH $____________ $____________
A2040 63319-0000 POST SLEEVE
4 EACH $____________ $____________
A2060 63326-0000 MUMBLE STRIP (CENTERLINE)
1.8 MILE $____________ $____________
A2080 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
18.000 MILE $____________ $____________
A2100 63405-0050 PAVEMENT MARKINGS, SYMBOLS
40 EACH $____________ $____________
A2120 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW
1 EACH $____________ $____________
A2140 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
11 EACH $____________ $____________
A2160 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
ALL LPSM $___LPSM_____ $____________
A2180 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
5 EACH $____________ $____________
A2200 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
30 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 15
A2220 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
400 LNFT $____________ $____________
A2240 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
266 SQFT $____________ $____________
A2260 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
0.644 MILE $____________ $____________
A2280 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
100 HOUR $____________ $____________
A2300 64603-1000 FIXTURE, VAULT TOILET (2-SEAT, PRECAST)
2 EACH $____________ $____________
A2320 64603-2100 FIXTURE, STAIRWAY
2 EACH $____________ $____________
A2340 64620-0000 REMOVE AND RESET (BEAR BOX)
3 EACH $____________ $____________
A2360 64620-0600 REMOVE AND RESET TRASH RECEPTACLE
10 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________ A0160 15401-000015401-0000 CONTRACTOR TESTING CONTRACTOR TESTING (Bid Item Alternative: Government Furnished Lab)(Bid Item Alternative: Government Furnished Lab) Bid Schedule Schedule:A
Project No:CA FTNP YOSE 15(2)
Project Name:Glacier Point Road
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSMBID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM Schedule Type:Base
$___LPSM_____ $____________$___LPSM_____ $____________
A - 16
X0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING
7.747 MILE $____________ $____________
X0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
18 EACH $____________ $____________
X0080 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
0.561 MILE $____________ $____________
X0100 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0120 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X0140 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE
530 LNFT $____________ $____________
X0180 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
65 EACH $____________ $____________
X0200 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
X0220 20201-0000 SELECTIVE CLEARING (FLUSH CUT AND PRUNING)
10.7 ACRE $____________ $____________
X0240 20220-1000 REMOVAL, INDIVIDUAL TREE
31 EACH $____________ $____________
X0260 20301-0700 REMOVAL OF DELINEATOR
140 EACH $____________ $____________
X0280 20301-1800 REMOVAL OF MONUMENT (SURVEY MARKER)
1 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FTNP YOSE 15(2)
A - 17
X0300 20301-1900 REMOVAL OF PIPE CULVERT
15 EACH $____________ $____________
X0320 20301-2400 REMOVAL OF SIGN
16 EACH $____________ $____________
X0340 20402-0000 SUBEXCAVATION
2,400 CUYD $____________ $____________
X0360 20465-0000 CONSERVE AND PLACE BOULDER
10 EACH $____________ $____________
X0380 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT A)
250 SQYD $____________ $____________
X0400 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT B)
125 SQYD $____________ $____________
X0420 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT E)
300 SQYD $____________ $____________
X0440 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT D)
450 SQYD $____________ $____________
X0460 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT C)
700 SQYD $____________ $____________
X0480 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
119.8 CUYD $____________ $____________
X0500 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
85 CUYD $____________ $____________
X0520 30202-2000 ROADWAY AGGREGATE, METHOD 2
5,500 TON $____________ $____________
X0540 30301-3000 SHOULDER AND DITCH RECONDITIONING
8.590 MILE $____________ $____________
X0560 30303-2000 AGGREGATE SURFACE RECONDITIONING
1,350 SQYD $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 18
X0580 30401-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
5.152 MILE $____________ $____________
X0600 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
3.485 MILE $____________ $____________
X0620 31303-0000 AGGREGATE-TOPSOIL COURSE
1,240 CUYD $____________ $____________
X0660 40101-0600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
20,800 TON $____________ $____________
X0680 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
205 TON $____________ $____________
X0720 40601-0000 FOG SEAL
55 TON $____________ $____________
X0740 41102-1000 PRIME COAT, METHOD 1
125,000 SQYD $____________ $____________
X0760 41105-0000 BLOTTER
760 TON $____________ $____________
X0780 41201-0000 TACK COAT
55 TON $____________ $____________
X0800 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH
340 SQYD $____________ $____________
X0820 60201-0600 18-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
60 LNFT $____________ $____________
X0840 60201-0800 24-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
235 LNFT $____________ $____________
X0860 60201-1000 36-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
85 LNFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 19
X0880 60201-1100 42-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
80 LNFT $____________ $____________
X0900 60201-1300 54-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
160 LNFT $____________ $____________
X0920 60201-1400 60-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
40 LNFT $____________ $____________
X0940 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL, PIPE, POLYMERIC COATED)
115 LNFT $____________ $____________
X0960 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL, PIPE, POLYMERIC COATED)
100 LNFT $____________ $____________
X0980 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(CORRUGATED METAL, PIPE, POLYMERIC COATED)
80 LNFT $____________ $____________
X1000 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT (POLYMERIC COATED)
4 EACH $____________ $____________
X1020 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED)
8 EACH $____________ $____________
X1040 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (POLYMERIC COATED)
2 EACH $____________ $____________
X1060 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT (POLYMERIC COATED)
1 EACH $____________ $____________
X1080 60210-1400 END SECTION FOR 60-INCH PIPE CULVERT (POLYMERIC COATED)
1 EACH $____________ $____________
X1100 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT (POLYMERIC COATED)
2 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 20
X1120 60211-0900 END SECTION FOR 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT (POLYMERIC COATED)
2 EACH $____________ $____________
X1140 60403-0000 INLET (CALTRANS TYPE G1)
1 EACH $____________ $____________
X1160 60403-0000 INLET (CALTRANS TYPE G0)
5 EACH $____________ $____________
X1180 60409-0000 INLET TOP, METAL FRAME AND GRATE
6 EACH $____________ $____________
X1200 60502-0000 GEOCOMPOSITE UNDERDRAIN SYSTEM
3,435 LNFT $____________ $____________
X1220 60704-0000 CLEANING CULVERT IN PLACE
9 EACH $____________ $____________
X1240 60901-1200 CURB, CONCRETE, 14-INCH DEPTH
15,800 LNFT $____________ $____________
X1260 60908-1000 PAVED DITCH, ASPHALT
2,550 SQYD $____________ $____________
X1280 61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE
15 SQYD $____________ $____________
X1300 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
5 EACH $____________ $____________
X1320 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT
2 EACH $____________ $____________
X1340 62011-0800 STONE MASONRY HEADWALL FOR 42-INCH PIPE CULVERT
1 EACH $____________ $____________
X1360 62011-1100 STONE MASONRY HEADWALL FOR 60-INCH PIPE CULVERT
1 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 21
X1380 62011-1800 STONE MASONRY HEADWALL FOR DOUBLE 24-INCH PIPE CULVERT
1 EACH $____________ $____________
X1400 62011-1900 STONE MASONRY HEADWALL FOR DOUBLE 30-INCH PIPE CULVERT
1 EACH $____________ $____________
X1420 62011-2000 STONE MASONRY HEADWALL FOR DOUBLE 36-INCH PIPE CULVERT
2 EACH $____________ $____________
X1440 62011-2300 STONE MASONRY HEADWALL FOR DOUBLE 54-INCH PIPE CULVERT
2 EACH $____________ $____________
X1460 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
X1480 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH
40 HOUR $____________ $____________
X1500 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
X1520 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
X1540 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
X1560 62301-0000 GENERAL LABOR
100 HOUR $____________ $____________
X1580 62302-0100 SPECIAL LABOR, SLOPE SCALING
48 HOUR $____________ $____________
X1600 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
20 HOUR $____________ $____________
X1620 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 22
X1640 62407-0000 PLACING CONSERVED TOPSOIL
6,150 CUYD $____________ $____________
X1660 62510-2000 SEEDING, HYDRAULIC METHOD
12.0 ACRE $____________ $____________
X1680 62515-2000 MULCHING, HYDRAULIC METHOD
12.0 ACRE $____________ $____________
X1700 63301-0000 SIGN SYSTEM
19 EACH $____________ $____________
X1720 63308-2000 OBJECT MARKER, TYPE 2
190 EACH $____________ $____________
X1740 63308-3000 OBJECT MARKER, TYPE 3
4 EACH $____________ $____________
X1760 63309-1000 DELINEATOR, TYPE SNOW POLE
381 EACH $____________ $____________
X1780 63316-1000 REMOVE AND RESET SIGN
15 EACH $____________ $____________
X1800 63319-0000 POST SLEEVE
7 EACH $____________ $____________
X1820 63326-0000 MUMBLE STRIP (CENTERLINE)
8.7 MILE $____________ $____________
X1840 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
65.500 MILE $____________ $____________
X1860 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
3.900 MILE $____________ $____________
X1880 63405-0050 PAVEMENT MARKINGS, SYMBOLS
3 EACH $____________ $____________
X1900 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 23
X1920 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
130 EACH $____________ $____________
X1940 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
130 EACH $____________ $____________
X1960 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
100 LNFT $____________ $____________
X1980 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
172 SQFT $____________ $____________
X2000 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
35.0 MILE $____________ $____________
X2020 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
4,000 HOUR $____________ $____________
X2040 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,200 HOUR $____________ $____________
X2060 63602-7000 SYSTEM INSTALLATION, SPEED FEEDBACK SIGN
4 EACH $____________ $____________
X2080 64620-0000 REMOVE AND RESET (BEAR BOX)
3 EACH $____________ $____________
X2100 64704-1000 MITIGATION, STREAMBED MATERIAL
18 CUYD $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FTNP YOSE 15(2)
Project Name:Glacier Point Road
X0120 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
(Bid Item Alternative: Government Furnished Lab)
BID ALTERNATE ITEM - SEE PAGE A-4
A - 24
Y0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
Y0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING
5.060 MILE $____________ $____________
Y0060 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Y0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Y0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Y0120 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Y0140 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
1.3 CUYD $____________ $____________
Y0160 41001-2000 SLURRY SEAL, TYPE 2 (FILL RUMBLE STRIPS)
1,275 SQYD $____________ $____________
Y0180 41402-2000 CRACKS, CLEANING AND SEALING
5.0 MILE $____________ $____________
Y0200 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
410 SQYD $____________ $____________
Y0220 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
1,101 SQYD $____________ $____________
Y0240 42901-0000 ULTRA-THIN BONDED WEARING COURSE
4,000 TON $____________ $____________
Y0260 42905-0000 POLYMER MODIFIED EMULSION MEMBRANE
80 TON $____________ $____________
Y0280 60901-1200 CURB, CONCRETE, 14-INCH DEPTH
405 LNFT $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CA FTNP YOSE 15(2)
A - 25
Y0300 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
10 HOUR $____________ $____________
Y0320 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH
10 HOUR $____________ $____________
Y0340 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
10 HOUR $____________ $____________
Y0360 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
10 HOUR $____________ $____________
Y0380 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
10 HOUR $____________ $____________
Y0400 62301-0000 GENERAL LABOR
25 HOUR $____________ $____________
Y0420 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
10 HOUR $____________ $____________
Y0440 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
20 HOUR $____________ $____________
Y0460 63301-0000 SIGN SYSTEM
1 EACH $____________ $____________
Y0480 63326-0000 MUMBLE STRIP (CENTERLINE)
5.06 MILE $____________ $____________
Y0500 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
41.000 MILE $____________…